Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
19 Nov 2026, 5:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Bengaluru Water Supply And Sewerage Board
Deepa J
Work of Providing and laying of 500mm dia DWC SN-8 class pipes & linking of laterals sewer line inside SWD (DH370) near Herohalli lake, Bangalore under AEE(WWM)-W-1 Sub Division - Cat IIA
BWSSB/2026-27/WS/WORK_INDENT3732
BWSSB/2026-27/WS/WORK_INDENT3732
Reserved
Water supply/sewage lines
Two Tender Document System(Two Cover)
BWSSB Executive Engineer WWM Network V Valley
7 documents required · 7 mandatory
The tender should also have experience in laying of sewer by trenchless technology for a length of 60.00 Rmt by using 900mm dia complete in all respect
₹2,500
₹1 L
7 Nov 2026
7 Nov 2026
21 Nov 2026
18 Nov 2026
Work of Providing and laying of 500mm dia DWC SN-8 class pipes & linking of laterals sewer line inside SWD (DH370) near Herohalli lake, Bangalore under AEE(WWM)-W-1 Sub Division - Cat IIA
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever nec...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadin...
Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bra...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadin...
Providing and installation of Class SN-8 Double Wall Corrugated HDPE pipe outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lo...
Providing and installation of Class SN-8 Double Wall Corrugated HDPE pipe outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lo...
Form work, centering and shuttering shall be provided as required it, standard specification as per IS 1200 Part V before laying concrete to confine to support or to keep the concrete in position. For...
Providing and laying in position Cement Concrete for all Sub structures ofbuilding, Irrigation works, Sub structure works of bridges, Drain works &other parallel works from 0.50m to 3.50 m height. The...
Supplying, fitting and placing TMT FE 550/550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying ...
Providing and constructing "WIRE CUT BRICK MACHINEHOLE CHAMBERS" using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved qu...
Dismantling the damaged or collpased manholes of 1.20m dia conical in shape and reconstructing the same for the same dimesions, with machine made wire cut brick in CM 1:4 with ordinary portland cement...
For every 0.1m additional above 1.0m B/w 1.0 to 2.0 mtr depth
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever nec...
Providing size stone masnory with hard stone in foundation & Plinth with cement mortar 1:6 (1 cement : 6 coarse sand)
Excavating of ramming/jacking/driving pit and receiving pit of size 5.00m(length) x 3.00m (breadth), up to 6.00 m depth in all soil strata including shoring and strutting including cutting of Asphalt/...
Installation of product pipe by manual jacking method - Manufacturing, providing, transporting, rolling, lowering, laying & jointing, testing, commissioning of ERW (Electric Resistance Welded), SAW (S...
Providing, filling and laying of sand bags filled with sand/clay for diversion of sewage during execution of work
Dewatering the sewage/storm water by using required HP submersible pump for the diversion of storm/sewage during the execution of work-10HP Pump
LD rectang cover 455 x 610 mm with frame
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Herohalli DTP.doc
Tender Document • 1.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .