Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAccepted-AOC 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹34.1 L+₹9.1 L (36.3%)Rejected-AOC | L2 | Rejected-AOC rejected | |
| 3 | Rejected-Technical III 6 7 2ND FLOOR ABOVE BANK OF BARODA GOPINATH BAZAR DELHI CANTT 110 010 | DELHI CANTT | NEW DELHI | DELHI | 110010 | - | Rejected-Technical No in WLR |
Tender Value
₹44.8 L
EMD Value
₹89,800
Closing Date
18 Apr 2022, 6:00 pmClosed
CWE(AF) Tughlakbad
HQ Commander Works Engineers Air Force, Tughlakabad PO Sangam Vihar New Delhi 110 080
PERIODICAL PREVENTIVE AND COMPREHENSIVE MAINTENANCE OF LIFTS IN SEKHON VIHAR AREA AT AF STN PALAM UNDER GE (P) AF GURGAON
2022_MES_514732_1
85181/E8
Open Tender
Electrical and Maintenance Works
Item Rate
334 days
GE(P) AF Gurgaon
As per NIT documents
7 documents required · 7 mandatory
₹500
GE(P) (AF) Gurgaon
₹89,800
Yes
11 May 2022
22 Mar 2022
20 Apr 2022
22 Mar 2022
18 Apr 2022
5 Apr 2022
Amount
M&L for comprehensive maintenance of electrically operated lifts suitable for serving passenger lifts installed at Sekhon Vihar Area of Make-Thyssenkrupp Elevators (India) Pvt Ltd for Ground + Ten floors (total Eleven landings) with electric power operated doors, auto electric levelling device of capacity 8 passenger lift installed in bldg Nos (144 to 153) = Total 10 Nos complete all as specified and as directed.
M&L for comprehensive maintenance of electrically operated lifts suitable for serving passenger lifts installed at Sekhon Vihar Area of Make-Thyssenkrupp Elevators (India) Pvt Ltd for Ground + Ten floors (total Eleven landings) with electric power operated doors, auto electric levelling device of capacity 13 passenger lift installed in bldg Nos (144 to 153) = Total 10 Nos complete all as specified and as directed.
Notes for Ser Item No. 1 & 2 (a) The above maintenance includes complete maintenance of existing lift by regularly and systematically examining adjusting fabricating as require for smooth and effcient functioning of the equipment/lift including replacement of unserviceable battries, unserviceable/broken fireman switch,COP and one LOP in each lift other than regular wear & tear of spares shall be included in quoted rates. Cost of all spares items shall deemed to be included in the quoted rates. Any item that is not included in OEM AMC schedule but required at site for smooth operation of lift or any damage occured to any part accidentely shall also be provided by the contractor on his own cost and nothing extra shall be paid to contractor on this account. (b) The maintenance of lift shall be carried out through OEMs as mentioned in Sch'A' Note of the tender documents and the SUCCESSFUL BIDDER shall have to submit intent of MOU of the OEM at the time of PG submission within the time frame failing which the contract shall be cancelled without notice to bidder. Contractor shall conclude AMC with OEM and copy of the agreement shall be submitted to GE within 07 days of commencement of AMC work, no payment shall be made to contractor without submission of valid AMC agreement and failing of which contract shall be liable to be cancelled.
Contd.../- Notes for Ser Item No. 1 & 2 (c) The contractor/OEM shall provide mechanic and this mechanic shall be available round the clock i.e. 24 hrs for emergency break down attendance and rescue of trapped persons all as directed by Enginr-in-Charge. (d) The contractor shall obtain signature of Authorized representative of GE as a token of satisfactory completion of notified defects. Any minor complaint requiring no spare part, shall be rectified as per OEM time line but not later than 4 hour & if requiring minor parts, shall be rectified within 6 hrs. Any major complaint requiring major spare part/repair, shall be rectified within 48 hours. In case delay in rectification of any complaint, a panel recovery shall be imposed as specifed in particular specifications
J D ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .