Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC work order |
| 2 | L2₹2.0 CrRejected-Finance NO 305 1 NEW COLONY 2ND STREET VALLAM POST CHENGALPET 603 002 | CHENGALPET | CHENGALPET | TAMIL NADU | 603002 | ₹2.0 Cr | L2 | Rejected-Finance highest rate quoted is rejected |
| Sl No | Description | Qty | Unit | K. THIYAGARAJAN L2 | A.V ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Source Improvement, Replacement of Pipes, Pumpsets and Cables in CWSS to Athi and 37 other habitations in Tiruvannamalai District - Construction period: 9 months and Free Maintenance: 3 months Revamping work for the year 2025-2026 | |||||
| 1.01 | Supply, Delivery and laying of pipes and specials etc, for connecting main i) 150mm and 100mm DI D/F PN 10
ii) 110mm HDPE Pipe PN 6 and allied works | 1 | No | 27,45,768 ₹27.5 L | 26,83,410 ₹26.8 L |
| 1.02 | Supply, Delivery and laying of pipes and specials etc, for Pumping and Branch pumping main i) 200mm HDPE Pipe PN 6
ii) 125mm HDPE Pipe PN 6
iii) 90mm HDPE Pipe PN 6
iv) 63mm HDPE Pipe PN 6 and allied works | 1 | No | 82,00,060 ₹82.0 L | 81,51,815 ₹81.5 L |
| 1.03 | Supply, Delivery and Laying of 3 Core 1.1 KV Grade Armoured Aluminium Conductor Cable
i) 25Sqmm
ii) 35Sqmm
iii) 70sqmm | 1 | No | 27,50,613 ₹27.5 L | 27,35,636 ₹27.4 L |
| 1.04 | Supply, Delivery and fixing of open well submersible pumpset and starter and colour washing the pumproom, infiltration well and sump etc. | 1 | No | 24,35,654.15 ₹24.4 L | 24,29,137.23 ₹24.3 L |
| 1.05 | Rejunevation of damaged roof slab for Infiltration well by dismantling damaged roof slab for Existing Infiltration wells and painting the sump and writing the TWAD Emblem with allied works. | 1 | No | 4,66,398.58 ₹4.7 L | 4,63,868.28 ₹4.6 L |
| 1.06 | Maintenance of the scheme | 1 | No | - | - |
Tender Value
₹1.9 Cr
EMD Value
₹1.4 L
Closing Date
3 Jul 2025, 3:00 pmClosed
Chief Engineer, Vellore
No.8, First East Main Road, Gandhi Nagr, Vellore-6
Revamping work for CWSS to Athi
2025_TWAD_573479_1
NIT04 Athi 11062025
Open Tender
Civil Works
270 days
Tiruvannamalai
Refer bid document
4 documents required · 4 mandatory
₹0
₹1.4 L
Vellore
8 Jan 2026
25 Jun 2025
4 Jul 2025
25 Jun 2025
3 Jul 2025
25 Jun 2025
27 Jun 2025
Amount
Source Improvement, Replacement of Pipes, Pumpsets and Cables in CWSS to Athi and 37 other habitations in Tiruvannamalai District - Construction period: 9 months and Free Maintenance: 3 months Revamping work for the year 2025-2026
Supply, Delivery and laying of pipes and specials etc, for connecting main i) 150mm and 100mm DI D/F PN 10 ii) 110mm HDPE Pipe PN 6 and allied works
Supply, Delivery and laying of pipes and specials etc, for Pumping and Branch pumping main i) 200mm HDPE Pipe PN 6 ii) 125mm HDPE Pipe PN 6 iii) 90mm HDPE Pipe PN 6 iv) 63mm HDPE Pipe PN 6 and allied works
Supply, Delivery and Laying of 3 Core 1.1 KV Grade Armoured Aluminium Conductor Cable i) 25Sqmm ii) 35Sqmm iii) 70sqmm
Supply, Delivery and fixing of open well submersible pumpset and starter and colour washing the pumproom, infiltration well and sump etc.
Rejunevation of damaged roof slab for Infiltration well by dismantling damaged roof slab for Existing Infiltration wells and painting the sump and writing the TWAD Emblem with allied works.
Maintenance of the scheme
K. THIYAGARAJAN (BID ID -1390159)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid