Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | -17.25% | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.5 L+₹14,177.84 (10.2%)Admitted-Fee/PreQual/Technical/Finance | -8.80% | ₹1.5 L+₹14,177.84 (10.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹3,960
Closing Date
11 Sept 2026, 4:00 pmClosed
Er. Mohammad Waseem
Office of the Executive Engineer RnB Anga
Construction of Slab Trash Guard over Existing Drain from the H/O Mohd Ibrahim to H/O Mohd Akber Mir at New Colony Hazratbal Anantnag.
2026_PWDJK_323571_3
NIT 78 of RnB/Ang/2026-27/6790-99 Dt 05/09/26
Open Tender
Civil Works
Percentage
15 days
Anantnag
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Centralized Designated Pooling Ac 0470010200000099
₹3,960
19 Sept 2026
5 Sept 2026
12 Sept 2026
5 Sept 2026
11 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of Labour for Cleaning of drain area and path area and disposal of malba outside | 15 | No | - | - |
| 2 | Providing and laying of hand Packed stone soling complete job incl carriage | 3.89 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade M-7.5 excluding the cost of centering and shuttering - All work at all levels in: 1:4:8 (1 Cement: 4 coarse sand & graded stone aggregate 40 mm nominal size) including cost and carriage of all materials involved upto site of work complete | 2.94 | cum | - | - |
| 4 | Providing and laying in position ready mixed M-20grade concrete for reinforced cement concrete work, using cement content as per approved design mis, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from 3 transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer- in -charge. Note: Cement content considered in this item is @300 kg/ cum. Excess/ less cement used as per design mix is payable recoverable separately All works upto plinth leve | 3.89 | cum | - | - |
| 5 | Providing and laying in position cement concrete in M-15 grade concrete excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 Cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials involved upto site of work complete | 4.42 | cum | - | - |
| 6 | Reinforcement for RCC work incld straightning, cutting, bending, placing in position & binding all complete (Thermo-mechanically treated bars) | 388.67 | kg | - | - |
| 7 | Structural steel work welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complet | 396 | kg | - | - |
| 8 | Providing and Fixing of Sign Board & Photos Complete Job | 1 | no | - | - |
stage.html
html • 0.02 MB
finance_1089567.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1089567.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .