Loading…
Loading…
Tender Value
₹82.5 L
EMD Value
₹1.7 L
Closing Date
25 Aug 2026, 2:15 pmDue tomorrow
DSCO
O/O DSCO, Shaheed Bhagat Singh Nagar at Garhi Kanugoan Balachaur
Construction of stone masonry retaining wall of pond Crate wire structure Runoff control structure Katwara Mandhiani Majhot Bhaddi Nanowal Akaliana
2026_DOA_173699_1
DSWC/SBS/2026-27/08
Open Tender
Civil Works
Percentage
90 days
Katwara Mandhiani Majhot Bhaddi Nanowal Akaliana
Please refer tender documents
2 documents required · 2 mandatory
₹2,500
₹1.7 L
15 Aug 2026
15 Aug 2026
25 Aug 2026
15 Aug 2026
25 Aug 2026
15 Aug 2026
FINANCIAL BID NO.: DSWC/SBS/2026-27/08
Construction Stone masonary Retaining wall of pond water protection, Crate wire structure and Runoff Control structure Vill- Katwara, Mandiani, Majhot, Bhaddi, Nanowal Akalina Tehsil Balachaur , Distt. Shaheed Bhagat Singh Nagar, Punjab
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
WORK –01 Retaining wall of Pond Village Katwara, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 113.75 cum 38.98 Thirty Eight Rupees And Ninety Eight Paise
2 C:C 1:8:16 in foundation 17.5 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 96.25 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 168.75 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 1.88 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 135 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 91.26 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Rupees
8 Carriage of bajri 1.69 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Rupees
9 Carriage of gatka 17.5 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
10 Carriage of boulder 291.5 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
11 Sign Board 1 no 5000 Five Thousand only
WORK – 02 Retaining wall of pond Vill- Mandhiani, Tehsil Balachaur, Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 122.4 cum 210.7 Two Hundred Ten Rupees and Seventy Paise
2 C:C 1:8:16 in foundation 20.4 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 102 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 108.8 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 1.7 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 108.8 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 75.95 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
8 Carriage of bajri 1.53 cum 325.09 Three Hundred Twenty Five Rupees And Nine Rupees
9 Carriage of gatka 20.4 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Rupees
10 Carriage of boulder 231.88 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Rupees
11 Dewatering of Pond 1 no 19422 Nineteen Thousand Four Hundred Twenty Two
WORK –03 (a) Retaining wall of pond Village Majhot, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 59.8 cum 210.7 Two Hundred Ten Rupees and Seventy Paise 12779.26
2 C:C 1:8:16 in foundation 7.8 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 52 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 72 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 1 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 163.6 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 44.17 cum 245.56 Two Hundred Forty Five Rupees And Fifty six Rupees
8 Carriage of bajri 0.92 cum 245.56 Two Hundred Ninety Eight Rupees And Fifty seven Rupees
9 Carriage of gatka 7.8 cum 298.57 Two Hundred Ninety Eight Rupees And Fifty seven Rupees
10 Carriage of boulder 136.4 cum 298.57 Two Hundred Ninety Eight Rupees And Fifty seven Rupees
WORK – 03(b) Crate Wire Structure no 1,2 Vilage Majhot, Tehsil Balachaur,Distt SBS Nagar.
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 26 cum 210.7 Two Hundred Ten Rupees and Seventy Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 254.4 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 254.4 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 56 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 56 cum 298.57 Two Hundred Ninety Eight Rupees And Fifty seven Rupees
Total no of Crate Wire 07
WORK –04 (a) Retaining wall of pond Village Bhaddi, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 20.7 cum 210.7 Two Hundred Ten Rupees and Seventy Paise
2 C:C 1:8:16 in foundation 2.7 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 18 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 18.9 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 0.63 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 39.15 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 13.26 cum 232.3 Two Hundred Thirty Two Rupees And Thirty Paise
8 Carriage of bajri 0.58 cum 232.3 Two Hundred Thirty Two Rupees And Thirty Paise
9 Carriage of gatka 2.7 cum 280.91 Two Hundred Eighty Rupees And Ninety One Paise
10 Carriage of boulder 40.59 cum 280.91 Two Hundred Eighty Rupees And Ninety One Paise
WORK –04 (b) Retaining wall of pond Village Bhaddi, Tehsil Balachaur,Distt SBS Nagar.
S Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 43.13 cum 210.7 Two Hundred Ten Rupees and Seventy Paise
2 C:C 1:8:16 in foundation 5.63 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 37.5 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 52.5 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 0.75 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 104.2 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 31.83 cum 232.3 Two Hundred Thirty Two Rupees And Thirty Paise
8 Carriage of bajri 0.69 cum 232.3 Two Hundred Thirty Two Rupees And Thirty Paise
9 Carriage of gatka 5.63 cum 280.91 Two Hundred Eighty Rupees And Ninety One Paise
10 Carriage of boulder 99 cum 280.91 Two Hundred Eighty Rupees And Ninety One Paise
11 Demo Board 1 No 6000 Six Thousand Only
WORK – 04 (c) Crate Wire Structure no 1 to 3 Vilage Bhaddi, Tehsil Balachaur,Distt SBS Nagar.
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 37.5 cum 210.7 Two Hundred Ten Rupees and Seventy Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 250 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 250 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 62.5 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 62.5 cum 280.91 Two Hundred Eighty Rupees And Ninety One Paise
Total no of crate 03
SAY TOTAL (A+B+C)
WORK -05 Retaining wall of pond Village Nanowal, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 34.5 cum 210.7 Two Hundred Ten Rupees and Seventy Paise
2 C:C 1:8:16 in foundation 4.5 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 30 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 42 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 0.6 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 84.2 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 25.47 cum 241.14 Two Hundred Forty one Rupees And fourteen Paise
8 Carriage of bajri 0.55 cum 241.14 Two Hundred Forty one Rupees And fourteen Paise
9 Carriage of gatka 4.5 cum 285.33 Two Hundred Eighty Five Rupees And Thirty Three
10 Carriage of boulder 79.2 cum 285.33 Two Hundred Eighty Five Rupees And Thirty Three
11 Demo Board 1 no 3000 Three Thousand only
WORK -06 Retaining wall of pond Village Akaliana, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 43.13 cum 210.7 Two Hundred Ten Rupees and Seventy Paise
2 C:C 1:8:16 in foundation 5.63 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 37.5 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 52.5 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 0.75 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 104.2 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 31.83 cum 236.63 Two Hundred Thirty Six Rupees And Sixty Three Paise
8 Carriage of bajri 0.69 cum 236.63 Two Hundred Thirty Six Rupees And Sixty Three Paise
9 Carriage of gatka 5.63 cum 303 Three Hundred Three Rupees
10 Carriage of boulder 99 cum 303 Three Hundred Three Rupees
11 Demo Board 1 no 3000 Three Thousand only
WORK -07 Run off Control Structure Village Majhot, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 20.13 cum 38.98 Thirty Eight Rupees And Ninety Eight Paise
2 C:C 1:8:16 in foundation 2.73 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 14.14 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 35.28 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 1.05 cum 4929.33 Four Thousand Nine Hundred Twenty nine Rupees And Thirty Three Paise
6 12.5 mm thick cement plaster 1:4 55.6 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 17.56 cum 245.56 Two Hundred Forty Five Rupees And Fifty six Rupees
8 Carriage of bajri 0.95 cum 245.56 Two Hundred Ninety Eight Rupees And Fifty seven Rupees
9 Carriage of gatka 2.73 cum 298.57 Two Hundred Ninety Eight Rupees And Fifty seven Rupees
10 Carriage of boulder 54.36 cum 298.57 Two Hundred Ninety Eight Rupees And Fifty seven Rupees
Grand TOTAL (1+2+3+4+5+6+7)
1.The quantities indicated above are tentative and may vary. The actual quantities shall be communicated at the time of issuance of the Work Order.
2.The rates of carriage are provisional and may undergo minor variation, subject to the final approval of the estimate by the Competent Authority.
3.The list of works may be modified by way of addition or deletion, depending upon the availability of funds and administrative requirements.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
DNIT08.pdf
Tender Documents • 0.51 MB
Finbid082.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].