Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
10 Sept 2026, 4:00 pm
Executive Engineer PD 3rd Sgr
Executive Engineer PD 3rd Sgr
Up-gradation of various blocks of Tulsi bagh RSTUVW by staircases, raising of walls and other allied works Tulsi bagh Srinagar.
2026_PWDJK_321952_1
e-NIT No. 12-P of 08/2026 Dated -22- 08-2026
Open Tender
Civil Works
Percentage
75 days
Executive Engineer PD 3rd Sgr
As per NIT
2 documents required · 2 mandatory
₹800
Executive Engineer PD 3rd Sgr
₹50,000
24 Aug 2026
24 Aug 2026
11 Sept 2026
24 Aug 2026
10 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material beyond muncipal limits lead as per direction of Engineer-in-chargeIn cement mortar | 6.73 | Cum | 1,458.45 | ₹9,815.37 |
| 2 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material beyond muncipal limits lead as per direction of Engineer-in-chargeIn cement mortar | 10.38 | Cum | 1,740.45 | ₹18,065.87 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 6.61 | Cum | 673.3 | ₹4,450.51 |
| 4 | Providing and laying of stone soling,hand packed including watering and hand ramming | 3.36 | Cum | 950 | ₹3,192 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1 :4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.36 | Cum | 5,202.9 | ₹17,481.74 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size | 23.9 | Cum | 6,591.25 | ₹1,57,530.88 |
| 7 | Half brick masonry with common burnt clay (non-modular) bricks of class designation7.5 in foundations and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand | 107.8 | Sqm | 947.25 | ₹1,02,113.55 |
| 8 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 2.24 | Cum | 9,027.2 | ₹20,220.93 |
| 9 | Labour charges for Brickwork with common burnt clay (non- modular)bricks of class designation 7.5 in foundation / plinth and superstructure including curing in Cement mortar1:4 (1cement : 4 coarse sand )& 1:6 (1cement : 6 coarse sand ) | 2.02 | Cum | 4,500 | ₹9,090 |
| 10Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1076683.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].