| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹33.8 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹34.4 L+₹62,840 (1.86%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹36.8 L+₹3.0 L (8.89%)Rejected-Finance | L-3 | Rejected-Finance L-3 | |
| 4 | L-4₹47.5 L+₹13.7 L (40.5%)Rejected-Finance MIG SECTOR 25A P D NAGAR UNNAO | UNNAO | UNNAO | UTTAR PRADESH | L-4 | Rejected-Finance L-4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Document not as per requirement |
Tender Value
₹47.3 L
EMD Value
₹48,000
Closing Date
27 Sept 2019, 12:00 pmClosed
SE
132 KV S/S GHAZIPUR
PROVIDING INSTALLATION TESTING COMMISSIONIING OF FIRE HYDRANT SYSTEM AT 400 KV SUBSTATION KASARA, MAU UNDER ELECTY. 400 KV SUBSTAION DIVISION KASARA, MAU
2019_UPTCL_377297_1
E-tender No. 53 ETC(GZP)/2019-20
Open Tender
Electrical Works
Item Rate
120 days
Kasara-Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,664
EE ETD-II Varanasi
₹48,000
6 Jan 2020
4 Sept 2019
27 Sept 2019
4 Sept 2019
27 Sept 2019
4 Sept 2019
Amount
Providing, Installation, Testing & Commissioning of Fire Hydrant System at 400 KV Sub Station Kasara, Mau with all Cost of Men, Material and T&P etc. required for satisfactory completion of the work as per Technical Specification & Drawing/ Layout:
Supply/Fabrication & Laying of following ‘B’ class M.S. pipe above the ground as per drawing & specification complete with associated Elbow/Bend, Tee, Socket, Flanges etc. by due cutting, bending, welding etc. Above work also includes crossing of roads and cable trenches underground after digging of earth including re-concreting of road crossing as per standard ratio of RCC and filling & leveling of earth (Underground Pipe Line should be anticorrosive treated by bituminous painting of outer surface and wrapping hot dip bitumen jute in two layers and pipeline above ground should be painted with one coat red oxide & two coat synthetic enamel paint of best quality ISI mark).
Supply & Laying of 150 NB dia. M.S. Pipe Line
Supply & Laying of 100 NB dia. M.S. Pipe
Supply & Laying of 80 NB dia. M.S. Pipe Line
Providing & Fixing Pressure Gauge.
Providing & Fixing Pressure Switch.
Construction of RCC Foundation in the ratio of 1:2:4 of Cement, Sand, Stone Ballast (20 mm) for fixing of M.S. Pipe Line with necessary Support Base Plate with due grouting of 4 No. Foundation Eye Bolts.
Civil Work for fixing of Guarders including materials (Cement, Sand, Brick Blast) with C.C. Mixture Machine.
Lucknow Fire Engineers
PRIZE ENGINEERING WORKS
Puja And Sanu Enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .