| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-Finance | L1 | Accepted-Finance Lower rate | |
| 2 | L2₹33.7 L+₹6.0 L (21.7%)Accepted-Finance 3 56A 4TH MAIN ROAD RAMAKRISHNA NAGAR ERNAVOOR CHENNAI 57 | CHENNAI | TAMIL NADU | 600001 | L2 | Accepted-Finance Higher rate |
| Sl No | Description | Qty | Unit | GV ELLAIYAN CONTRACTORS L1 | THANGAMMA ERECTORS L2 |
|---|---|---|---|---|---|
| 1.00 | Labour Cost:Charges for fabrication of new reducer pipe 350 x 300 x 250(pipe will be supplied by Tangedco) | 2 | nos | 12,939 ₹25,878 Lowest | 15,000 ₹30,000 |
| 2.00 | Labour Cost:Charges for providing scaffolding arrangement to a height of 8Mtrs from ground level including cost of consumables and hire charges for T&P;s | 245 | M² | 279 ₹68,355 Lowest | 400 ₹98,000 |
| 3.00 | Labour Cost:Charges for removing the worn out and leaky 350NB service water drawal line including worn out elbow from service water overhead tank to cooling water pump house area from the pipe rack at 6 to 7 mtr Elevation by providing temporary arresting stage by stage inclusive of consumables and hire charges for T&P's | 312 | Mtr | 3,075 ₹9,59,400 Lowest | 4,000 ₹12,48,000 |
| 4.00 | Labour Cost:Charges for providing new service water drawal line of size 150NB pipe, including elbow by cutting the new pipe to required size, fabricating suitably, lifting the pipe, positioning the pipe on the existing elevated pipe rack and weling the pipe, inclusive of consumables and hire charges for T&P's.(Material will be supplied by TANGEDCO) | 312 | Mtr | 2,015 ₹6,28,680 Lowest | 2,300 ₹7,17,600 |
| 5.00 | Labour Cost:Charges for fabrication of 1No.M.S.Bend out of 150NB ERW M.S.Pipe by cutting & welding including cost of T&Ps and consumables and necessary 150NB pipes will be supplied by the Board at free of cost. | 24 | nos | 1,575 ₹37,800 Lowest | 1,700 ₹40,800 |
| 6.00 | Labour Cost:Charges for cutting & dismantling of the 100NB MS pipe line and leading, lowering and devolution of pipe to NCTPS-1 store. | 558 | Mtr | 375 ₹2,09,250 Lowest | 430 ₹2,39,940 |
| 7.00 | Labour Cost:Charges for fabrication and Erection of the 100NB MS pipe line from Turbine '0' mtr to cooling water pump house. | 558 | Mtr | 930 ₹5,18,940 Lowest | 1,100 ₹6,13,800 |
| 8.00 | Labour Cost:Charges for engaging one number crane for leading, lifting, loading & sorting the pipes and unloading at NCTPS-1 site. | 60 | Hrs | 4,445 ₹2,66,700 Lowest | 5,000 ₹3,00,000 |
| 9.00 | Labour Cost:Charges for painting the 150NB & 100NB MS pipe line from overhead tank to package boiler area with one coat of Redoxide and two coats of enamal paint after through scrapping with emery sheet with manual labour, the rate including cost of paint, consumable and T&P hire charges. | 344 | M² | 170 ₹58,480 Lowest | 250 ₹86,000 |
Tender Value
Refer Docs
EMD Value
₹30,100
Closing Date
28 Jul 2025, 2:00 pmClosed
The Chief Engineer
The Chief Engineer, North Chennai Thermal Power Station - I, Chennai - 120
NCTPS I Operation Circle CA Dn RWPH Service Water Line Rectification of service water line from overhead tank to cooling water pump house emergency header
2025_EB_581395_1
CE/NCTPS-I/SE/OPN/28/2025-26
Open Tender
Power/Energy Projects/Products
Works
60 days
NCTPS - I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹30,100
Yes
8 Sept 2025
14 Jul 2025
29 Jul 2025
14 Jul 2025
28 Jul 2025
14 Jul 2025
Amount
Labour Cost:Charges for fabrication of new reducer pipe 350 x 300 x 250(pipe will be supplied by Tangedco)
Labour Cost:Charges for providing scaffolding arrangement to a height of 8Mtrs from ground level including cost of consumables and hire charges for T&P;s
Labour Cost:Charges for removing the worn out and leaky 350NB service water drawal line including worn out elbow from service water overhead tank to cooling water pump house area from the pipe rack at 6 to 7 mtr Elevation by providing temporary arresting stage by stage inclusive of consumables and hire charges for T&P's
Labour Cost:Charges for providing new service water drawal line of size 150NB pipe, including elbow by cutting the new pipe to required size, fabricating suitably, lifting the pipe, positioning the pipe on the existing elevated pipe rack and weling the pipe, inclusive of consumables and hire charges for T&P's.(Material will be supplied by TANGEDCO)
Labour Cost:Charges for fabrication of 1No.M.S.Bend out of 150NB ERW M.S.Pipe by cutting & welding including cost of T&Ps and consumables and necessary 150NB pipes will be supplied by the Board at free of cost.
Labour Cost:Charges for cutting & dismantling of the 100NB MS pipe line and leading, lowering and devolution of pipe to NCTPS-1 store.
Labour Cost:Charges for fabrication and Erection of the 100NB MS pipe line from Turbine '0' mtr to cooling water pump house.
Labour Cost:Charges for engaging one number crane for leading, lifting, loading & sorting the pipes and unloading at NCTPS-1 site.
Labour Cost:Charges for painting the 150NB & 100NB MS pipe line from overhead tank to package boiler area with one coat of Redoxide and two coats of enamal paint after through scrapping with emery sheet with manual labour, the rate including cost of paint, consumable and T&P hire charges.
THANGAMMA ERECTORS (BID ID -1413341)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .