Loading…
Loading…
| # | Company | Quoted % | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹14.3 L | L1 | ||
| 2 | L2₹14.4 L+₹13,620 (0.95%) | L2 |
Tender Value
₹13.6 L
EMD Value
₹14,000
Closing Date
7 May 2026, 5:30 pmClosed
- ARUN KUMAR DHRUW(DFLT)
MUNICIPAL CORPORATION, RAIPUR
अधोसंरचना मद से स्वामी आत्मानंद वार्ड क्रमांक 38 अंतर्गत अर्जुन नगर एवं समता कॉलोनी के आंतरिक मार्गो में आर.सी.सी. नाली पुलिया निर्माण कार्य।
189507
NIT NO:81/ZONE 07/2026 RAIPUR DATED:21/04/2026
RESTRICTED TENDER
WORKS
PERCENTAGE
4 days
MUNICIPAL CORPORATION
Required Past Technical Experience: AS PER NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
13 documents required · 13 mandatory
Urban Administration and Development Department (UADD)
WORKS
- ARUN KUMAR DHRUW(DFLT)
RESTRICTED TENDER
PERCENTAGE
A B C D
MUNICIPAL CORPORATION, RAIPUR
TENDER SECTION
COMMISSINOR, MUNICIPAL CORPORATION, RAIPUR
120
04.00
No
1
189507
7 May, 2026 5:30:00 PM IST
11 May, 2026 11:30:00 AM IST
22 Apr, 2026 5:30:00 PM IST
NIT NO:81/ZONE 07/2026 RAIPUR DATED:21/04/2026
अधोसंरचना मद से स्वामी आत्मानंद वार्ड क्रमांक 38 अंतर्गत अर्जुन नगर एवं समता कॉलोनी के आंतरिक मार्गो में आर.सी.सी. नाली पुलिया निर्माण कार्य।
14000.00 INR
Fixed Deposit Receipt (OFFLINE)
2
8 May, 2026 5:00:00 PM IST
AS PER NIT
AS PER NIT
AS PER NIT
0.00 INR
15d 0h 26m
13 documents required · 10 mandatory · 3 optional
₹0
₹14,000
7 May 2026
22 Apr 2026
11 May 2026
22 Apr 2026
7 May 2026
22 Apr 2026
8 May 2026
MUNICIPAL CORPORATION RAIPUR
Name of Work :- अधोसंरचना मद से स्वामी आत्मानंद वार्ड क्रमांक 38 अंतर्गत अर्जुन नगर एवं समता कॉलोनी के आंतरिक मार्गो में आर.सी.सी. नाली पुलिया निर्माण कार्य।
AS PER SCHEDULE OF RATES -2015 (C.G. P.W.D.)
S.N. PARTICULARS Qty. UNIT RATE
1 Demolishing R.C.C. work including stacking of steel bars and disposal of unserviceable material within 50 metre lead.
2 Demolishing cement concrete including disposal of material within 50 metre lead.
1:3:6 or richer mix 45.942 Cum 549
3 Excavation for all types and sizes of foundations, trenches and drains or for any other purpose including disposal of excavated stuff upto 1.5 m lift and lead upto 50m (at least 5m away from the excavated area), including dressing and leveling of pits.
In all types of soils.
Drian 302.157 Cum 185
4 Carriage by mechanical transport upto 5 km lead:
90% of Dismantaling c.c. + Excavated Earth 271.9413 Cum 111
5 Providing and filling in plinth with sand/ Crusher dust and hard moorum under floor in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering, including dressing etc. complete.
6 Pumping out water caused by springs tidal or river seepage, broken water main or drains and like during Excavation or during Excavation and laying of base concrete (volume to be calculated taking height from water level to bottom of pit and to be measured and paid) .
7 Providing and laying nominal mix plain cement concrete with crushed stone aggregate using concrete mixer in all works upto plinth level excluding cost of form work.
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size).
Drian 41.96625 Cum 2659
8 Providing and laying nominal mix reinforced cement concrete with crushed stone aggregate using concrete mixer in all works upto plinth level excluding cost of form work.
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size).
9 Providing and placing in position reinforcement for R.C.C. work including straightening, cutting, bending, binding etc. complete as per drawings including cost of binding wire in foundation and plinth all complete:
Thermo-Mechanically treated bars FE 415 7916.16 Kg 54.5
10 Providing and fixing form work including centring, shuttering, strutting, staging, propping bracing etc. complete and including its removal at all levels, for:
Foundations, footings, bases of columns plinth beam, curtain wall in any shape and size and all type of wall below plinth level. 353.4 Sqm 139
Suspended floors, roofs, access platform, balconies (plain surfaces) and shelves (cast in situ) 212.04 Sqm 235
boq_comp_chart.xls
BOQ Comparative Chart • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.02 MB
4345415252967778043_189507_NIT DETAILS.docx
NIT • 0.04 MB
4160934821933792354_189507_Affidavit format.pdf
NIT • 0.06 MB
8754307790213835921_189507_Form A.pdf
NIT • 0.19 MB
5390312674049255350_189507_BOQ.xlsx
BOQ • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .