| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-Finance | L1 | Accepted-Finance Lowest Rate. | |
| 2 | L2₹4.8 L+₹2,467 (0.52%)Rejected-Finance | L2 | Rejected-Finance Higher Rate. | |
| 3 | L3₹4.8 L+₹3,677 (0.78%)Rejected-Finance | L3 | Rejected-Finance Higher Rate. | |
| 4 | L4₹4.8 L+₹7,547 (1.59%)Rejected-Finance | L4 | Rejected-Finance Higher Rate. | |
| 5 | L5₹4.8 L+₹8,369 (1.77%)Rejected-Finance | L5 | Rejected-Finance Higher Rate. |
Tender Value
₹4.8 L
EMD Value
₹9,675
Closing Date
23 Jun 2026, 2:00 pmClosed
Assistant Engineer, PWD, KMCH Sub-Division.
33A Eden Hospital Road, Kolkata-700073
Emergent repairing work to the compound road at northwest corner of CB building along with necessary underground sewerage line work within the compound of Medical College and Hospital, Kolkata during the year 2026-27.
2026_WBPWD_5015312_7
WBPWD/AE/KMCHSD/NIT-01e/26-27
Open Tender
CIVIL WORKS
Percentage
21 days
Kolkata Medical College Hospital
Please refer Tender documents.
5 documents required · 5 mandatory
₹9,675
Yes
14 Jul 2026
10 Jun 2026
25 Jun 2026
16 Jun 2026
23 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
above 150 mm. thick | 26.93 | M3 | 1,417 | ₹38,159.81 |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
Depth of excavation not exceeding 1,500 mm. | 3.14 | %M3 | 11,927 | ₹37,450.78 |
| 3 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | 30.07 | M3 | 166 | ₹4,991.62 |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 107.7 | M2 | 361 | ₹38,879.7 |
| 5 | Supplying & laying Double Wall Corrugated (with external annular corrugation and smooth internal walls) High Density Polyethelene Pipes conforming to IS 16098 (Part-II):2013 having Stiffness Class of SN 8 with Ring Stiffness not less than 8.00 KN/Sqm. and Impact Resistance TIR value not more than 10% including necessary jointing materials for non-pressure underground Drainage, Sewerage & Cross drainage application.
250 mm Dia | 18 | Mtr | 1,011 | ₹18,198 |
| 6 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering
In ground floor and foundation.
1:3:6 proportion | 2.38 | M3 | 4,630.25 | ₹11,019.99 |
| 7 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water ramming complete including the cost of supply of sand, (payment to be made on measurement of finished quantity) | 4.36 | %M3 | 93,621 | ₹4,08,187.56 |
| 8 | Labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used)
Single brick flat soling (thickness 75 mm) | 43.61 | %M2 | 3,584 | ₹1,56,298.24 |
| 9 | Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm (depth) with 250 mm thick 1st. class brick work in cement mortar (1:4) on all sides, bottom of the pit consisting of 100 mm thick cement concrete (1:3:6) with stone chips over a layer of jhama brick flat soling,15 mm thick (1:4) cement plaster to inside walls and out-side walls upto G.L and 20 mm.thick (1:4) plaster to bottom of the pit, providing necessary invert with cement concrete (1:3:6) with stone chips as per direction, neat cement finishing to entire internal surfaces, top of the pit covered with 100 mm thick R.C.C. slab (1:1.5:3) with stone chips and necessary reinforcements upto 1% and shuttering including 6 mm thick cement plaster (1:4) in all external surfaces of the slab and one 560 mm dia. R.C.C. manhole cover of approved make supplied, fitted and fixed in the slab with necessary fittings, necessary earthwork in excavation in all sorts of soil, filling sides of the pit with earth and removing spoils after work complete in all respect with all costs of labour and materials.
With Pakur variety (SAIL, TATA, RINL) | - | nos | 6,824.05 | - |
| 10 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
For works in foundation, basement and upto roof of ground floor/upto 4 m
Tor steel/Mild Steel
SAIL / TATA / RINL | 1 | MT | 54,940.3 | ₹54,885.36 |
stage.html
html • 0.16 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
WBF_2911_Modified_aekmchsd.pdf
Tender Documents • 1.29 MB
BOQ_5084057.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .