GEMC-511687726627214
Awarded to SILVERLINE INTEGRITY SERVICES
₹51.7 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| R2 Supply and Installation of Manual Test Station complete with lower bend and with PCC foundation | - | HSN not specified by seller | 22 EA | 25,960 | 571,120 |
| R2 Supply and Installation of Manual Test Station with out lower bend and with out PCC foundation | - | HSN not specified by seller | 16 EA | 14,160 | 226,560 |
| R2 Shifting of Manual Test Station along with foundation and cable to suitable location as per instruction of EIC | - | HSN not specified by seller | 10 EA | 5,900 | 59,000 |
| R2 Repairing of Manual Test Stations foundation with supply and replacement of foundation bolts and nuts | - | HSN not specified by seller | 6 EA | 4,720 | 28,320 |
| R2 Repairing of Manual Test Stations including supply and replacement of damaged door | - | HSN not specified by seller | 10 EA | 2,360 | 23,600 |
| R2 Supply and replacement of damaged or missing locks in Manual Test Station including labor consumables tools and tackles | - | HSN not specified by seller | 12 EA | 1,770 | 21,240 |
| R2 Supply and replacement of damaged or missing doors in Manual Test Station | - | HSN not specified by seller | 12 EA | 1,770 | 21,240 |
| R2 Supply and installation of damaged missing terminal plates all types | - | HSN not specified by seller | 10 EA | 590 | 5,900 |
| R2 Supply and Fixing of diagram plate in the existing test station of all types complete in all respect | - | HSN not specified by seller | 24 EA | 472 | 11,328 |
| R2 Supply installation testing and commissioning of Anode Lead Junction Box | - | HSN not specified by seller | 1 EA | 53,100 | 53,100 |
| R2 Repairing of ALJB including supply of new locks and latch for the outer enclosure | - | HSN not specified by seller | 2 EA | 5,900 | 11,800 |
| R2 Supply of 1C X 4 SQMM | - | HSN not specified by seller | 30 M | 118 | 3,540 |
| R2 Supply of 1C X 6 SQMM | - | HSN not specified by seller | 100 M | 188.8 | 18,880 |
| R2 Supply of 1C X 10 SQMM | - | HSN not specified by seller | 100 M | 230.1 | 23,010 |
| R2 Supply of 1C X 16 SQMM | - | HSN not specified by seller | 20 M | 342.2 | 6,844 |
| R2 Supply of 1C X 25 SQMM | - | HSN not specified by seller | 20 M | 413 | 8,260 |
| R2 Supply of 1C X 35 SQMM | - | HSN not specified by seller | 20 M | 531 | 10,620 |
| R2 Cable laying 1C X 4 SQMM | - | HSN not specified by seller | 30 M | 118 | 3,540 |
| R2 Cable laying 1C X 6 SQMM | - | HSN not specified by seller | 100 M | 118 | 11,800 |
| R2 Cable laying 1C X 10 SQMM | - | HSN not specified by seller | 100 M | 118 | 11,800 |
| R2 Cable laying 1C X 16 SQMM | - | HSN not specified by seller | 20 M | 354 | 7,080 |
| R2 Cable laying 1C X 25 SQMM | - | HSN not specified by seller | 20 M | 354 | 7,080 |
| R2 Cable laying 1C X 35 SQMM | - | HSN not specified by seller | 20 M | 354 | 7,080 |
| R2 Cable jointing repairing of underground cable as per approved procedure including excavation and backfilling Size 1 C x 4 sq mm | - | HSN not specified by seller | 4 EA | 1,416 | 5,664 |
| R2 Cable jointing repairing of underground cable as per approved procedure including excavation and backfilling Size 1 C x 6 sq mm | - | HSN not specified by seller | 10 EA | 1,416 | 14,160 |
| R2 Cable jointing repairing of underground cable as per approved procedure including excavation and backfilling Size 1 C x 10 sq mm | - | HSN not specified by seller | 10 EA | 1,416 | 14,160 |
| R2 Cable jointing repairing of underground cable as per approved procedure including excavation and backfilling Size 1 C x 16 sq mm | - | HSN not specified by seller | 2 EA | 1,770 | 3,540 |
| R2 Cable jointing repairing of underground cable as per approved procedure including excavation and backfilling Size 1 C x 25 sq mm | - | HSN not specified by seller | 4 EA | 1,770 | 7,080 |
| R2 Cable jointing repairing of underground cable as per approved procedure including excavation and backfilling Size 1 C x 35 sq mm | - | HSN not specified by seller | 4 EA | 1,770 | 7,080 |
| R2 Making of Pipe to cable connection | - | HSN not specified by seller | 12 EA | 4,720 | 56,640 |
| R2 Painting of Manual Test station including removing of old paint rust etc | - | HSN not specified by seller | 60 EA | 944 | 56,640 |
| R2 Painting of Anode Lead Junction Box | - | HSN not specified by seller | 4 EA | 1,416 | 5,664 |
| R2 Painting of TR CPPSM Units including removing of old paint rust etc | - | HSN not specified by seller | 4 EA | 4,720 | 18,880 |
| R2 Supply and replacement of copper copper sulphate permanent refrenece cells | - | HSN not specified by seller | 2 EA | 23,600 | 47,200 |
| R2 Supply of portable Cu CuSO4 Half cell for measuring of PSP Pipe to Soil Potential of Pipeline | - | HSN not specified by seller | 2 EA | 11,210 | 22,420 |
| R2 Supply and installation of explosion proof spark gap arrestors make across insulating joints at DRS MRS etc | - | HSN not specified by seller | 20 EA | 20,060 | 401,200 |
| R2 Supply Installation and Commissioning of Polarization Cell along with the enclosure suitable for housing of Polarization Cells | - | HSN not specified by seller | 8 EA | 112,100 | 896,800 |
| R2 Preventive Maintenence of Polarisation cells | - | HSN not specified by seller | 10 EA | 4,720 | 47,200 |
| R2 Supply and installation of pre packed Magnesium anodes with cable having weight 17 pounds | - | HSN not specified by seller | 2 EA | 16,520 | 33,040 |
| R2 Supply and Installation of pre packed Zinc grounding cell 22Kg Htype | - | HSN not specified by seller | 4 EA | 31,860 | 127,440 |
| R2 Supply and Installation of pre packed Zinc Grounding Anode Weight 17 lbs | - | HSN not specified by seller | 2 EA | 14,160 | 28,320 |
| R2 Preventive maintenance of Anode Ground Bed | - | HSN not specified by seller | 4 EA | 23,600 | 94,400 |
| R2 SITC of Earthpits | - | HSN not specified by seller | 24 EA | 20,060 | 481,440 |
| R2 Halfyearly Monitoring of Earthpits | - | HSN not specified by seller | 320 EA | 1,180 | 377,600 |
| R2 Recharging of existing earth pits | - | HSN not specified by seller | 20 EA | 2,360 | 47,200 |
| R2 Chamber Repair of Earth Pit | - | HSN not specified by seller | 16 EA | 2,360 | 37,760 |
| R2 Earthpit chamber MS Cover thickness | - | HSN not specified by seller | 40 KG | 5,900 | 236,000 |
| R2 Supply and installation of cable markers | - | HSN not specified by seller | 8 EA | 2,360 | 18,880 |
| R2 Carrying out on off Close Interval Potential Logging | - | HSN not specified by seller | 4 KM | 9,440 | 37,760 |
| R2 Carryingout Direct Current Voltage Gradient | - | HSN not specified by seller | 2 KM | 8,260 | 16,520 |
| R2 Stray current Interference survey at railway crossing or runnig parallel to GAIL Gas Pipelines | - | HSN not specified by seller | 2 NUM | 14,160 | 28,320 |
| R2 Stary current Interference survey at foreign Pipeline crossing or runnig parallel with GAIL Gas Pipeline | - | HSN not specified by seller | 2 NUM | 16,520 | 33,040 |
| R2 Stray current Interference survey at HT crossings or runnig parallel to GAIL Gas Pipelines | - | HSN not specified by seller | 4 NUM | 10,620 | 42,480 |
| R2 Excavation and Backfilling of pipeline in all type of soils and ordinary rocks | - | HSN not specified by seller | 30 M3 | 708 | 21,240 |
| R2 Coating repair Removing the old damaged coating rust greese moisture and all foreign material at defect material with scrapper | - | HSN not specified by seller | 8 M2 | 1,770 | 14,160 |
| R2 CAT survey of Un Piggable Pipelines at every 10M Interval | - | HSN not specified by seller | 2 KM | 8,850 | 17,700 |
| R2 Supply Installation and Commissioning of Earth Pits | - | HSN not specified by seller | 10 EA | 20,060 | 200,600 |
| R2 Supply Installation and Commissioning of Maintenance free Earth Pits | - | HSN not specified by seller | 10 EA | 21,240 | 212,400 |
| R2 Supply and Laying or Erection of 25 mm X 3 mm GIstrip upto half metre below ground | - | HSN not specified by seller | 200 M | 295 | 59,000 |
| R2 Supply and Laying or Erection of 50 mm X 6 mm GIstrip upto half metre below ground | - | HSN not specified by seller | 40 M | 413 | 16,520 |
| R2 Supplying and Coating of R95 | - | HSN not specified by seller | 40 M2 | 5,310 | 212,400 |
| R2 Breaking of RCC surface for the construction of Earth pits etc | - | HSN not specified by seller | 8 M3 | 1,770 | 14,160 |
| R2 Breaking of PCC surface for the construction of Earth pits etc | - | HSN not specified by seller | 8 M3 | 944 | 7,552 |