| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.8 LAccepted-AOC 319 A MEERAPUR PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 211001 | 1 | Accepted-AOC L1 | |
| 2 | 2₹2.9 L+₹1,500 (0.53%)Rejected-AOC 113 F BLOCK HOUSE NUMBER 113 F BLOCK PANKI KANPUR NAGAR UTTAR PRADESH 208020 | KANPUR NAGAR | UTTAR PRADESH | 208020 | 2 | Rejected-AOC L2 | |
| 3 | 3₹3.4 L+₹54,000 (19.0%)Rejected-AOC | 3 | Rejected-AOC L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical GURU RAM DAS NAGAR SRI SAI VIHAR COLONY ALIGARH ALIGARH ALIGARH UTTAR PRADESH 202001 | ALIGARH | UTTAR PRADESH | 202001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.2 L
EMD Value
₹4,000
Closing Date
27 Jul 2024, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle-I, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
Installation and configuration of BCU relay of 40 MVA Transformer-I and checking, rectifying and synchronization of SCADA with relays to real time data to modipuram SLDC at 132 KV Substation Bindki, under Electy. Trans. Division- Fatehpur
2024_UPTCL_938593_1
09-ETC-I(A)/ 2024-2025
Open Tender
Marine Works
Item Rate
60 days
Bindki
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC, Prayagraj
₹4,000
18 Jan 2025
16 Jul 2024
29 Jul 2024
16 Jul 2024
27 Jul 2024
16 Jul 2024
Amount
Inspection and rectification of ABB make Substation Automation System installted at 132 KV S/S Bindki. The following works are including for healthy SCADA communication and its synchronisation and configuration with SCADA Gateway.
Replacing the defective armourd optical fiber cable and splicing it if required any anywhere in the Ring.
Replacing the defective FO multimodpatch cords.
Checking & Rectivying the healthiness of LIUs and its Commnicating ports.
Checking & Rectifying the healthness Ethernet switches.
Replacing the defective CAT-5/LAN cables and checking itshealthiness.
Rectifying communication healthiness of MOD Bus for various MFM meters.
Re-installation of old backup to SCADA.
Checking and rectifying the healthiness of all protection relay's communication to SCADA.
Checking and rectifying of all required events, alarms, numerical data, status and signals to SCADA from various bays & feeders.
Chicking and rectifying the SLD of S/S to SCADA screen.
Checking and rectifying the problem of all required operations of equipments from SCADA.
Configuration of ethernet switches/modems. If required.
Making both HMI-1 & HMI-2 in all respect at the time of rectification all required materials and computer parts will be arranged by contractor without any extra charges. Any license/software required for configuration of SCADA system shall be in the scope of contractor. No additional payment shall be made for above work. Above is valid for Sl.No.2, 3.
Proper and safe installation and Configuration of BCU Relay REC-670 of 40 MVA T/F-I at 132 KV Substation Bindki as per required at Site. This Job also includes proper erection, termination and all related work for satisfactorily installation of above relay with work of retrofitting and configuration and testing and commissioning of above relay, configuring parameters and other required settings, except new relay, testing kit will be provided by department without any extra cost during test.
Configuration of main and backup gateway in the existing ABB make SCADA system, mapping as per the field signals in the gateway to make the communication on IEC-104 protocol over TCP/IPS to lucknow and Modipuram SLDC. Firmware upgradation for the network protocol (NTP) and configuration the time synchronization. Validation of the Real time data to modipuram in between relays/BCUs. Also checking healthiness of all isolators contacts/communication with SCADA system, if its required any rectification for proper communication with SCADA system then fix it. All men extra material (if required any) & T&P will be provided by contractor without any extra cost.
Supply of SMPS with AC input 100-240V, 4.5-2.5, 50-60 Hz. Maximum combined power for the +12volt outpur shall be 288W (3.3V & +5V=105 watt Max), total output continuous shall not excced 300 watts for UPS of SCADA system.
B.R. ENTERPRISES
BARKATI ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .