| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAccepted-AOC | ₹4.1 Cr | L1 | Accepted-AOC Lowest Rate |
| 2 | L2₹4.2 Cr+₹8.2 L (1.97%)Rejected-Finance | ₹4.2 Cr+₹8.2 L (1.97%) | L2 | Rejected-Finance Highest Rate |
| Sl No | Description | Qty | Unit | SHREE INFRASTRUCTURE L2 | S SENTHAMILSELVAN L1 |
|---|---|---|---|---|---|
| 1.00Construction of Bridge across Pappankanni River along Velankulam Road to Rendampulikkadu in Rendampulikkadu Panchayat in Sethubavachatram Block at Thanjavur District. | |||||
| 2.00Dismantling of Existing Structures like culverts, bridges and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m as per Technical Specification Clause 202. | |||||
| 3.00Removal of Existing Bed Level Causeway | |||||
| 4.00 | For PCC | 51 | Cu.m | 528.4 ₹26,948.4 | 518.19 ₹26,427.69 Lowest |
| 6.00 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL. | 179.09 | Cu.m | 133.96 ₹23,990.9 | 131.37 ₹23,527.05 Lowest |
| 7.00 | Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER ABUTMENTS & PIERS OF RAFT FOUNDATION, CUT OF WALL. | 1,620.69 | Cu.m | 498.55 ₹8,07,995 | 488.92 ₹7,92,387.75 Lowest |
| 8.00 | Vibrated Reinforced Cement Concrete of Grade M35 using 20mm, 12mm ISS Size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for CUT OFF WALL BELOW SILL LEVEL. | 150.04 | Cu.m | 11,506.39 ₹17,26,418.76 | 11,284.09 ₹16,93,064.86 Lowest |
| 9.00 | Filling inside the Raft with clean coarse M-sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete. For filling inside the Raft. | 863.41 | Cu.m | 2,348.27 ₹20,27,519.8 | 2,302.9 ₹19,88,346.89 Lowest |
| 10.00 | Vibrated Cement Concrete of Grade M 15 using 40mm, 20mm & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for FOUNDATION CONCRETE (BELOW FOOTING, BELOW RAFT FOUNDATION, BELOW RETAINING WALL). | 86.34 | Cu.m | 5,610.69 ₹4,84,426.97 | 5,502.29 ₹4,75,067.72 Lowest |
| 11.00 | Vibrated Reinforced Cement Concrete M 35 Grade, Design Mix using 20 mm & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications. For RAFT FOUNDATION. | 522.83 | Cu.m | 10,425.79 ₹54,50,915.79 | 10,224.37 ₹53,45,607.37 Lowest |
Tender Value
₹4.1 Cr
EMD Value
₹4.1 L
Closing Date
19 Aug 2025, 3:00 pmClosed
Project Director, DRDA, Thanjavur
DRDA Office, 2nd Floor, New Collectorate, Thanjavur
Thanjavur District - Package No.01 - Construction of Bridge across Pappankanni River along Velankulam Road to Rendampulikkadu in Rendampulikkadu Panchayat at Sethubavachatram Block under State Special Assistance - Phase I - 2025-26.
2025_RDTN_587234_1
DIPR/3980/TENDER/2025 Dated.30.07.2025
Open Tender
Civil Works - Bridges
Item Rate
540 days
Sethubavachatram
As per Tender document Part A
9 documents required · 9 mandatory
₹0
₹4.1 L
DRDA Office, 2nd Floor, New Collectorate,Thanjavur
9 Oct 2025
30 Jul 2025
19 Aug 2025
1 Aug 2025
19 Aug 2025
1 Aug 2025
11 Aug 2025
Amount
Construction of Bridge across Pappankanni River along Velankulam Road to Rendampulikkadu in Rendampulikkadu Panchayat in Sethubavachatram Block at Thanjavur District.
Dismantling of Existing Structures like culverts, bridges and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m as per Technical Specification Clause 202.
Removal of Existing Bed Level Causeway
For PCC
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL.
Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER ABUTMENTS & PIERS OF RAFT FOUNDATION, CUT OF WALL.
Vibrated Reinforced Cement Concrete of Grade M35 using 20mm, 12mm ISS Size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for CUT OFF WALL BELOW SILL LEVEL.
Filling inside the Raft with clean coarse M-sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete. For filling inside the Raft.
Vibrated Cement Concrete of Grade M 15 using 40mm, 20mm & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for FOUNDATION CONCRETE (BELOW FOOTING, BELOW RAFT FOUNDATION, BELOW RETAINING WALL).
Vibrated Reinforced Cement Concrete M 35 Grade, Design Mix using 20 mm & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications. For RAFT FOUNDATION.
Vibrated Reinforced Cement Concrete of Grade M35 using 20mm, 12mm ISS Size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, WINGS, & PIERS ABOVE SILL LEVEL OF RAFT FOUNDATION.
Vibrated Reinforced Cement Concrete of Grade M35 using 20mm,12mm ISS Size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN BETWEEN THE ABUTMENTS AND RETURNS.
Providing and Fixing Kraft Paper for full width of Seating of Deck Slab and including including cost and conveyance to work site Labour for fixing the same in correct position and all other incidental charges etc., complete.
Vibrated Reinforced Cement Concrete M-35 Grade using 20mm, 12mm ISS Size HBG Metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel and cost of formworks including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete for DECK SLAB.
Providing filter media behind the abutments and wings with clean III graded material 53 mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MORT's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling behind the abutment and wings
Provinding and fixing PVC EXPANSION JOINT in between deck slabs over abutments and piers as shown in the drawing including cost and conveyance of expeansion joints including shallimar pad and joint sealent etc., complete-1 set.
Vibrated Cement Concrete of grade M15 Nominal Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For BASECOURSE BELOW APPROACH SLAB.
Vibrated Reinforced Cement Concrete M 35 Grade using 20mm, 12mm ISS size HBG Metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including cost of form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for Approach Slab.
Vibrated Cement Concrete M35 using 20mm, 12mm ISS HBG Metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for Wearing Coat of 75mm Uniform Thickness Over Deck Slab and Approach Slab.
Vibrated Reinforced Cement Concrete M-40 using 20mm, 12mm ISS Size HBG Metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc, complete for CRASH BARRIER.
Vibrated Cement Concrete M20 Grade using 20mm, 12mm ISS size HBG Metal including cost and form work and centering conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete,working at heights for PCC PARAPET OVER WINGS.
Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
Approach road.
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 2 km for formation of Approach Road.
98% COMPACTION
100% COMPACTION
Collection and Supply of Gritty Gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS.
Construction of Granular Sub Base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 GSB-III.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase / Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and Laying of Prime Coat using Emulsion at the Rate of 7 Kg Per Ten Square Meter over the WMM surface preparatory to another bituminous construction over it.
Providing and Laying Tack Coat Over WMM Surface (treated with Primer) using 2.5Kg of Bitumen Emulsion RS-1 for 10 Sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing, laying 50mm Consolidated Thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5. [BM (Grade-II) 50mm Thick Using VG30]
BITUMINOUS CONCRETE 25 MM THICK USING CMP (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00 - 9.50mm. 0.17cum of 9.5 - 2.36 and below with 50.3kgs of VG30 / VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 - 30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 25mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory / phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges for 20 -30t CMP with bitumen boiler, tipper trucks,paver finisher / 9m paver finisher, vibratory / phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5.
Providing Diversion Road
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer using the carted earth with a lead of 2km for Formation.
Construction of Granular Sub Base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 GSB-III.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 100mm thick with pavers in SubBase / Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and Laying Reinforced Cement Concrete Pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry.
Construction of Retaining wall (PCC).
Earthwork Excavation in all Classes of Soil Except Hardrock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAINING WALL.
Vibrated Cement Concrete of Grade M 15 using 40mm, 20mm & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Foundation Concrete (Below Retaining Wall).
Vibrated Cement Concrete of Grade M-20 using 20mm & 12mm ISS HBG Metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, for FOOTINGS OF RETAINING WALLS.
Vibrated Cement Concrete of Grade M20 using 20mm & 12mm ISS Size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for STEM OF RETAINING WALLS.
Providing and Fixing Seepage Pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the BACKFILL IN BETWEEN THE ABUTMENTS AND RETURNS.
Provision for Bed Protection (Apron)
Providing and Making Gabion Struture with mechanically woven Double Twisted Hexagonal Shaped Wire Mesh Gabion Boxes as per IS 16014:2021, MORTH Clause 2500, of required size, Mech Type 10 x 12 (D=100mm with tolerance of +- 2%) Zinc Coated, Mesh Wire diameter 3.0mm, mechanically edged / selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200mm as per drawing, all complete as per direction of Engineer-in-Charge.
Provision for White Washing & Painting
Whitewashing of Abutments, Piers & Wing Walls using two Coats of Freshly Burnt Shell Lime
Plastic Emulsion Painting for Crashbarrier and Handrails using two coats of Enamel Paint.
Provision for Retro-reflectorised Cautionary sign board
Provision for Reflectors
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}.
SHREE INFRASTRUCTURE (BID ID -1430095)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .