Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.2 LAccepted-AOC 0 HISAR HISAR HARYANA 125004 UDYAM HR 06 0052049 | HISAR | HARYANA | 125004 | ₹42.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹45.7 LRejected-Finance | ₹45.7 L | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹46.6 LRejected-Finance KAMARVITA AMBARI FALAKATA JALPAIGURI | JALPAIGURI | JALPAIGURI | WEST BENGAL | ₹46.6 L | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹46.9 LRejected-Finance | ₹46.9 L | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹46.9 LRejected-Finance SREE COLONY BAGDOGRA PO BAGDOGRA DIST DARJEELING WB | ₹46.9 L | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | M S ALOK SAHA L7 | SRI SURAJIT SENGUPTA L4 | M/S S.B. CONSTRUCTION L5 | M/S BHARAT CONSTRUCTION L8 | Raj Enterprise L1 | ANJALI CONSTRUCTION L6 | ROY CONSTRUCTION AND CONSULTANCY L3 | LIBERAL ENGINEER CONSTRUCTION L2 | M/S ASHWIRBAD WOODCRAFT L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster or lime plaster on walls /ceiling of any description from concrete or brick wall etc including raking out joints, hacking for key, scrubbing down with water and disposing off the retrieved debris as directed including necessary scaffoldings etc complete all as specified and directed | 950 | SQM | 51 ₹48,450 | 44 ₹41,800 | 50 ₹47,500 | 42.5 ₹40,375 | 75 ₹71,250 | 53 ₹50,350 | 43 ₹40,850 | 41 ₹38,950 | 39 ₹37,050 |
| 2.00 | Hacking out old broken glass (any thickness, size, quality or description) from wooden/metal frame including punching or drilling out old glazing pins/spring clips and providing and fixing new ones, complete all as specified and directed. | 45 | SQM | 33 ₹1,485 | 30 ₹1,350 | 35 ₹1,575 | 29 ₹1,305 | 87 ₹3,915 | 38 ₹1,710 | 25 ₹1,125 | 29 ₹1,305 | 32 ₹1,440 |
| 3.00 | Materials and labour for rendering 15mm thick in cement mortar (1:6) on other fair faces of brick work or concrete surfaces, finished even and fair without using extra cement, complete all as specified and directed. | 200 | SQM | 237 ₹47,400 | 225 ₹45,000 | 270 ₹54,000 | 237 ₹47,400 | 278 ₹55,600 | 236 ₹47,200 | 245 ₹49,000 | 240 ₹48,000 | 249 ₹49,800 |
| 4.00 | Materials and labour for rendering 15mm thick in two layers (10+5 mm thick) in cement mortar (1:4) on fair faces of brick work or concrete surfaces,WPC shall be mixed with morter of top layer, finished even and fair, complete all as specified and directed.complete all as specified and directed. (Note: WPC shall be measured and paid separately as supply only) | 600 | SQM | 328 ₹1,96,800 | 333 ₹1,99,800 | 323 ₹1,93,800 | 319 ₹1,91,400 | 250 ₹1,50,000 | 337 ₹2,02,200 | 330 ₹1,98,000 | 320 ₹1,92,000 | 340 ₹2,04,000 |
| 5.00 | Materials and labour for rendering 5mm thick in cement mortar (1:3) on ceiling surfaces, finished even and smooth without using extra cement, complete all as specified and directed. | 150 | SQM | 213 ₹31,950 | 211 ₹31,650 | 230 ₹34,500 | 198 ₹29,700 | 175 ₹26,250 | 178 ₹26,700 | 184 ₹27,600 | 185 ₹27,750 | 220 ₹33,000 |
| 6.00 | Supply only integral Water Proofing Compound of approved make. | 150 | KG | 88 ₹13,200 | 92 ₹13,800 | 105 ₹15,750 | 95 ₹14,250 | 35 ₹5,250 | 78 ₹11,700 | 80 ₹12,000 | 85 ₹12,750 | 100 ₹15,000 |
| 7.00 | Materials and labour for preparation of new/old plastered surfaces of wall and applying 2mm thick wall care putty of approved make complete all as specified and directed. | 1,200 | SQM | 83 ₹99,600 | 78 ₹93,600 | 71 ₹85,200 | 80 ₹96,000 | 46 ₹55,200 | 68 ₹81,600 | 73 ₹87,600 | 72 ₹86,400 | 74 ₹88,800 |
| 8.00 | Materials and labour for applying three coats of white wash on newly plastered ceiling surface including preparation of surface, complete all as specified and directed. | 150 | SQM | 27 ₹4,050 | 23 ₹3,450 | 32 ₹4,800 | 41 ₹6,150 | 18 ₹2,700 | 21 ₹3,150 | 30 ₹4,500 | 28 ₹4,200 | 40 ₹6,000 |
| 9.00 | Materials and labour for preparation of new plastered surfaces of walls and applying two coats of oil bound distemper of approved colour with roller over one coat of primer over 1 mm thick wall care putty of approved make complete all as specified and directed. | 150 | SQM | 146 ₹21,900 | 127 ₹19,050 | 123 ₹18,450 | 165 ₹24,750 | 35 ₹5,250 | 123 ₹18,450 | 150 ₹22,500 | 134 ₹20,100 | 160 ₹24,000 |
| 10.00 | Materials and labour for preparation of new plastered surfaces of walls and applying two coats of weather proof antifungal exterior emulsion paint (as per manufacturer instructions) of approved colour over a coat of damp proof primer over 1mm thick wall care putty complete all as specified and directed. | 500 | SQM | 238 ₹1,19,000 | 191 ₹95,500 | 200 ₹1,00,000 | 218 ₹1,09,000 | 185 ₹92,500 | 207 ₹1,03,500 | 190 ₹95,000 | 193 ₹96,500 | 233 ₹1,16,500 |
Tender Value
₹47 L
EMD Value
₹94,000
Closing Date
5 Feb 2026, 6:00 pmClosed
GE SEVOKE ROAD
GE Sevoke Road Post Salugara Dist Jalpaiguri PIN 734008
PERIODICAL SERVICES AND ALLIED WORKS TO CERTAIN MAP ACCNS AT SEVOKE ROAD MIL STN UNDER GE SEVOKE ROAD
2025_MES_739255_2
8535/SEV OF 2025-26
Open Tender
Civil Works
180 days
GE SEVOKE ROAD
AS PER TENDER DOCUS
8 documents required · 8 mandatory
₹500
GE SEVOKE ROAD
₹94,000
17 Mar 2026
23 Jan 2026
7 Feb 2026
23 Jan 2026
5 Feb 2026
30 Jan 2026
24 Jan 2026 - 27 Jan 2026
Taking down cement plaster or lime plaster on walls /ceiling of any description from concrete or brick wall etc including raking out joints, hacking for key, scrubbing down with water and disposing off the retrieved debris as directed including necessary scaffoldings etc complete all as specified and directed
Hacking out old broken glass (any thickness, size, quality or description) from wooden/metal frame including punching or drilling out old glazing pins/spring clips and providing and fixing new ones, complete all as specified and directed.
Materials and labour for rendering 15mm thick in cement mortar (1:6) on other fair faces of brick work or concrete surfaces, finished even and fair without using extra cement, complete all as specified and directed.
Materials and labour for rendering 15mm thick in two layers (10+5 mm thick) in cement mortar (1:4) on fair faces of brick work or concrete surfaces,WPC shall be mixed with morter of top layer, finished even and fair, complete all as specified and directed.complete all as specified and directed. (Note: WPC shall be measured and paid separately as supply only)
Materials and labour for rendering 5mm thick in cement mortar (1:3) on ceiling surfaces, finished even and smooth without using extra cement, complete all as specified and directed.
Supply only integral Water Proofing Compound of approved make.
Materials and labour for preparation of new/old plastered surfaces of wall and applying 2mm thick wall care putty of approved make complete all as specified and directed.
Materials and labour for applying three coats of white wash on newly plastered ceiling surface including preparation of surface, complete all as specified and directed.
Materials and labour for preparation of new plastered surfaces of walls and applying two coats of oil bound distemper of approved colour with roller over one coat of primer over 1 mm thick wall care putty of approved make complete all as specified and directed.
Materials and labour for preparation of new plastered surfaces of walls and applying two coats of weather proof antifungal exterior emulsion paint (as per manufacturer instructions) of approved colour over a coat of damp proof primer over 1mm thick wall care putty complete all as specified and directed.
Materials and labour for preparation old decorated surfaces of walls including brooming down or steel wire brushing scraping down smoke shoot, moulds, moss and efflorescent salt sand trading oil and greasy spots and applying one coat of white wash complete all as specified and directed.
Materials and labour for preparation old decorated surfaces of ceiling including brooming down or steel wire brushing scraping down smoke shoot, moulds, moss and efflorescent salt sand trading oil and greasy spots and applying one coat of white wash complete all as specified and directed.
Materials and labour for preparation old decorated surfaces of walls including brooming down or steel wire brushing scraping down smoke shoot, moulds, moss and efflorescent salt sand trading oil and greasy spots and applying one coat of oil bound distemper of approved colour with roller complete all as specified and directed.
Materials and labour for complete removal of existing paint from surfaces of walls and applying two coats of oil bound distemper of approved colour with roller over a coat of damp proof primer complete all as specified and directed.
Materials and labour for complete removal of existing paint from surfaces of walls and applying two coats of weather proof antifungal exterior emulsion paint (as per manufacturer instructions) of approved colour over a coat of damp proof primer over 1mm thick wall care putty upto fourth storey of multistoried buildings complete all as specified and directed.
Materials and labour for complete removal of existing paint from surfaces of walls and applying two coats of weather proof antifungal exterior emulsion paint (as per manufacturer instructions) of approved colour over a coat of damp proof primer over 1mm thick wall care putty above fourth storey complete all as specified and directed. Note for item Nos. 15.00 &16.00 :- The work under these items shall be carried out in multy storied MAP Accns of height more than 10 m. Height upto fourth storey shall be measured against item No. 15.00 and above fourth storey shall be measured against item No. 16.00 Contractor shall quote their unit rate duly considering the cost of scaffolding, frames etc. including cost of necessary safety precautions of workers. No extra payment other than quoted rate shall be allowed on this account.
Materials and labour for preparing of old painted wooden surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed.
Materials and labour for preparing of old painted steel surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed.
Materials and labour for re-writing letters or figures (Block, Roman, Italic or Indian) n.exc 30cm height with synthetic enamel paint complete as specified and directed.
Materials and labour for removing moss, grass, sapling etc. over RCC roof and spreading bleaching powser @ 0.5 kg / sqm and scrubbing with coil fibre and finally clening down and washing with water complete all as directed.
Materials and labour for removal of plant growth growth on walls/roof/cornices/chajja, uprooting as feasible, injecting chemical GLYPHOSPHATE (4% concentration) of 20 ml or till refusal by making cutting/injecting in the remaining stem or root of plant inside at 30mm and spraying with 25 ml GLYPHOSPHATE (4% concentration) diluted with 1 lit of water and making good the surface including necessary scaffolding wherever required complete all as specified and directed.
Supply and fixing in repair 4 mm thick sheet glass, ordinary quality and glazing with oil putty in squares not exceeding 0.50sqm in each pane , complete all as specified and directed.
Supply and fixing in repair 4 mm thick sheet glass, ordinary quality and glazing with oil putty in squares exceeding 0.50sqm in each pane , complete all as specified and directed.
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_839686.xls
BOQ • 0.29 MB
TENDERDOCUMENTS8535.pdf
Tender Documents • 1.54 MB
Download all tender documents and submit your bid