| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC | ₹2.0 Cr | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹2.1 CrRejected-Finance | ₹2.1 Cr | L2 | Rejected-Finance Comparatively Higher Price |
| 3 | L3₹2.2 CrRejected-Finance | ₹2.2 Cr | L3 | Rejected-Finance Comparatively Higher Price |
| Sl No | Description | Qty | Unit | APU CONSTRUCTIONS L3 | S.NAGARAJAN L2 | M/s. KB Builders L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in Soil with Dozer with lead upto 1000 metres (Excavation for road way in soil by mechanical means including cutting and transporting the earth to site of embankment/dumping area with lead upto 1000 metres, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) | 5,777 | Cubic Metre | 343 ₹19.8 L | 338 ₹19.5 L | 313 ₹18.1 L |
| 2.00 | Providing and Laying of M-Sand including cost and coveyance of the same to the worksite from approved source including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete. | 3,105 | Cubic Metre | 2,544 ₹79.0 L | 2,497 ₹77.5 L | 2,327 ₹72.3 L |
| 3.00 | Granular Sub-base with Close Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401)- for grading-V Material | 435 | Cubic Metre | 4,672 ₹20.3 L | 4,586 ₹19.9 L | 4,273 ₹18.6 L |
| 4.00 | Granular Sub-base with Close Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401)- for grading-III Material | 207 | Cubic Metre | 5,026 ₹10.4 L | 4,933 ₹10.2 L | 4,597 ₹9.5 L |
| 5.00 | Wet Mix Macadam laying using by Grader (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) | 518 | Cubic Metre | 5,076 ₹26.3 L | 4,983 ₹25.8 L | 4,643 ₹24.1 L |
| 6.00 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.7 kg/sqm using mechanical means (PC 0.70 kg/ sqm) | 2,070 | Square Metre | 55 ₹1.1 L | 54 ₹1.1 L | 50 ₹1.0 L |
| 7.00 | Tack Coat on Granular surfaces treated with primer (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) ( TC 0.25 Kg / Sqm ) | 2,070 | Square Metre | 19 ₹39,330 | 18 ₹37,260 | 17 ₹35,190 |
| 8.00 | Dense Graded Bituminous Macadam-I (Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects) (75-100 mm) (DBM Gr-I (VG 40) | 197 | Cubic Metre | 12,042 ₹23.7 L | 11,821 ₹23.3 L | 11,014 ₹21.7 L |
| 9.00 | Bituminous Concrete Grading -II (Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) (30mm - 40 mm) BC Gr-II (VG 40) | 83 | Cubic Metre | 14,365 ₹11.9 L | 14,102 ₹11.7 L | 13,140 ₹10.9 L |
| 10.00 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) (km 4/346/-4/584) | 1,234 | Cubic Metre | 539 ₹6.7 L | 529 ₹6.5 L | 493 ₹6.1 L |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
6 Oct 2025, 11:00 amClosed
SE(NH)Chennai
O/o of the Superintending Engineer, National Highways, No.206, Jawaharlal nehru salai, Arumbakkam, Chennai-106
Restoration for laying of Sewer pipe line along the road (LHS) from km 0/00 to 0/436, Trenchless road crossing from (RHS to LHS) 0/436 to 0/456 km, along the road (LHS) from 0/725 to 0/812 km, Trenchless road crossing (RHS to LHS) at 0/812 km, along
2025_MoRTH_875680_1
TN.No.05/HDO/NH/2025-26/Dated 01.09.2025
Open Tender
Civil Works
60 days
Vellore
AS per Tender Document
2 documents required · 2 mandatory
₹15,000
As per standard Bidding Document
₹4.0 L
SE(NH)Chennai
8 Dec 2025
2 Sept 2025
7 Oct 2025
2 Sept 2025
6 Oct 2025
2 Sept 2025
2 Sept 2025 - 24 Sept 2025
24 Sept 2025
Amount
Excavation in Soil with Dozer with lead upto 1000 metres (Excavation for road way in soil by mechanical means including cutting and transporting the earth to site of embankment/dumping area with lead upto 1000 metres, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)
Providing and Laying of M-Sand including cost and coveyance of the same to the worksite from approved source including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete.
Granular Sub-base with Close Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401)- for grading-V Material
Granular Sub-base with Close Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401)- for grading-III Material
Wet Mix Macadam laying using by Grader (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.7 kg/sqm using mechanical means (PC 0.70 kg/ sqm)
Tack Coat on Granular surfaces treated with primer (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) ( TC 0.25 Kg / Sqm )
Dense Graded Bituminous Macadam-I (Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects) (75-100 mm) (DBM Gr-I (VG 40)
Bituminous Concrete Grading -II (Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) (30mm - 40 mm) BC Gr-II (VG 40)
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) (km 4/346/-4/584)
Footpaths and Separators (Construction of footpath/separator by providing a 150 mm compacted granular sub base as per clause 401 and 25 mm thick cement concrete grade M15, including provision of all drainage arrangements but excluding kerb channel..)
Cast in Situ Cement Concrete M20 kerb(Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408)
M 20 Cast insitu
Supplying and fixing of 83mm thick M35 grade Rubber moulded hydraulic pressed type paver block with super embedded unskids texture design making the international standard size with zig zag design for hipper interlock capacity rate inclusive of materials, transporting to the work site from the factor and labour charges for laying, compacting with paver vibrator and inclusive of taxes as per clause 410 of MORTH Vth Revision and as directed by the departmental officers etc. complete.
Tubular Steel Railing on Medium Weight steel channel ( ISMC series) 100 mm x 50 mm (Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings)
S.NAGARAJAN (BID ID -3292910)
APU CONSTRUCTIONS (BID ID -3291164)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid