| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.0 LAccepted-Finance | ₹87.0 L | L1 | Accepted-Finance Responsive |
| 2 | L2₹90.7 L+₹3.6 L (4.17%)Rejected-Finance | ₹90.7 L+₹3.6 L (4.17%) | L2 | Rejected-Finance Non responsive |
| 3 | L2₹90.7 L+₹3.6 L (4.17%)Rejected-Finance | ₹90.7 L+₹3.6 L (4.17%) | L2 | Rejected-Finance Non responsive |
Tender Value
Refer Docs
EMD Value
₹89,000
Closing Date
24 May 2023, 10:00 amClosed
Executive Engineer
EE, UD and Housing, Tezu Division, Tezu
Const. of Approach Road, Over Head Tank with Water Supply and Drainage at MRF site, Tezu
2023_APUDH_1265_1
DD/TD/23-24/02
Open Tender
Civil Works
Item Rate
365 days
Tezu
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
EE, UD and Housing, Tezu Division
₹89,000
26 May 2023
17 May 2023
24 May 2023
17 May 2023
24 May 2023
17 May 2023
Amount
CC Approach Road
Site Clearance: Clearing and Grubbing Road Land (Clearing and grubbing road land including upgrooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto lead of 1000mtr including removal and disposal of top organic soil not exceeding 150mm in thickness) By Mechanical Means In area of light jungle
Grannular Sub-Base with Close Grade Material: Plant Mix Method (Construction of grannular sub-base by providing closed graded material, mixing, in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layer with motor grader on preparation surface and compacting with vibrator power roller to achieve the desired density, complete as per. for grading- I Material
for grading- II Material
for grading- III Material
CEMENT CONCRETE PAVEMENT: Dry Lean Cement Concrete Sub-Base ( Construction of dry lean cement concrete sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10Mpa at 7 days, mixed i a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibrator roller, finishing and curing.)
Roller Cement Concrete Base (Construction of rolled cement concrete base course with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25mm with min. aggregate cement ratio 15:1 and min. cement content of 200kg/cum, aggregate optimum moisture content, transporting to site, laying with a paver with electronic sensor, compacting with 8-10 tonnes smooth wheeled vibratory roller to achieve, the designed flexural strength, finishing and curing.)
Dowel bars and Tie Bars
Overhead Tank and water supply
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Dry rubble Flooring
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: a) Foundations and plinth
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : a) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in : a) 1 : 1.5 : 3 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement. a) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement. a) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in : a) 1 : 1.5 : 3 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Reinforced cement concrete in suspended floors, roofs, landings and balconies upto floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size).
Centring and shuttering including strutting, propping etc and removal of form work for : a)Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
b)Suspended floors, roofs, landings shelves and their supports, balconies and chajjas (3.5 m height).
c) Column, pillars, posts and struts etc.
d) Lintels, beams, girders, bressumers and cantilevers etc.
Reinforcement of RCC work including bending, binding and placing in position complete. a) Cold twisted bars.
15 mm cement plaster 1 : 3 (1 cement : 3 fine sand) on the rough side of single or half brick wall.
Neat cement punning.
Providing and fixing GI pipes complete with GI fittings including trenching and refilling etc (external work). a) 32 mm nominal bore
b) 50 mm nominal bore
Providing and fixing brass full way valve with wheel of approved quality. a) 32 mm nominal bore
b) 50 mm nominal bore
Providing and fixing non-return valve of approved quality. a) 50 mm nominal bore
Provision for Ladder
Fixing and fitting of motors
Drainage System
Earthwork in excavation in soils containing 50% or more shingle or small size boulders upto 30m size including banking in 20cm layers and breaking clods,ramming and dressing up for the the purpose of making embankments or filling up ground depressions lead upto 50m and lift upto 1.50m
Providing and laying in foundations and plinth cement oncrete 1:4:8 ( 1 Cement: 4 coarse sand : 8 graded stone aggregate 40mm nominal size) excluding ost of centering and shuttering
Re-flling of excavated earthwork in foundations and plinths etc in 15cm layers inluding ramming and watering et. Complete.
Reinforcement cement concrete work in side walls (any thickness) including attached pillasters,buttresses,plinth and string course,fillets etc from top of foundation upto floor two level including finishing and plastering the exposed surface with cement mortar 1:3( 1 cement:3 fine sand) of thickness not exceeeding 6mm to give a smooth and even surface excluding cost of centering, shuttering and reinforcement in:- a) M20(1 cement: 1.5 coarse sand: 3 stone aggregate 20mm nominal size)
(a) Mild Steel
Centering & Shuttering work including strutting, propping etc and removal of formwork for:- b) Walls ( any thickness) including attached pilasters, buttresses, plinth and string courses etc
12mm cement plaster 1:3 ( 1 Cement: 3 fine sand)
M/S Himalayan Trader
M/S Seven Star Trading House
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1385.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .