| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.2 LAccepted-AOC | ₹41.2 L Quoted ₹42.7 L | L1 | Accepted-AOC Award of Contract |
| 2 | L2₹43.1 L+₹36,095 (0.84%)Rejected-Finance C O M KHARKARANG LUMJINGSUK BLOCK A MADANRTING SHILLONG 793021 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793021 | ₹43.1 L+₹36,095 (0.84%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹44.9 L+₹2.2 L (5.08%)Rejected-Finance C O GIVEN GOD NONGTDAU ARBUTHNOT ROAD NONGRIMMAW LAITUMKHRAH SHILLONG PIN 793011 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793011 | ₹44.9 L+₹2.2 L (5.08%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹45.9 L+₹3.2 L (7.49%)Rejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | ₹45.9 L+₹3.2 L (7.49%) | L4 | Rejected-Finance Being L4 |
| 5 | L5₹46.0 L+₹3.3 L (7.62%)Rejected-Finance 34 KAISER GANJ MANDI DIST MEERUT UP 250002 | MEERUT | UTTAR PRADESH | 250002 | ₹46.0 L+₹3.3 L (7.62%) | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | M/s Gupta Construction L5 | M/S DEEDAR ENTERPRISE L4 | Bhuiya Construction L2 | CAPITAL ENTERPRISE L1 | M/s J. C. CONSTRUCTION L3 | MAHINDER ELECTRICALS L7 | M S Umesh and Co L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as directed. | 30 | Cubic Meter | 800 ₹24,000 Lowest | 1,000 ₹30,000 | 2,500 ₹75,000 | 2,500 ₹75,000 | 1,320 ₹39,600 | 1,190 ₹35,700 | 1,200 ₹36,000 |
| 2.00 | Demolition of cement Concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as directed. | 25 | Cubic Meter | 1,200 ₹30,000 | 1,240 ₹31,000 | 1,800 ₹45,000 | 1,800 ₹45,000 | 900 ₹22,500 Lowest | 1,120 ₹28,000 | 1,200 ₹30,000 |
| 3.00 | Demolition of reinforced cement concrete of any description and in any position complete all as specified. | 12 | Cubic Meter | 1,320 ₹15,840 | 1,130 ₹13,560 Lowest | 2,500 ₹30,000 | 1,860 ₹22,320 | 1,190 ₹14,280 | 1,290 ₹15,480 | 1,200 ₹14,400 |
| 4.00Dismantling of PVC(SWR) drain pipe alongwith fittings and acessories and taking out from walls, floors or from trenches, if required complete all as specified and directed for following sizes :- | ||||||||||
| 5.00 | 75mm dia | 250 | Running Meter | 123 ₹30,750 | 130 ₹32,500 | 100 ₹25,000 | 20 ₹5,000 Lowest | 125 ₹31,250 | 99 ₹24,750 | 125 ₹31,250 |
| 6.00 | 110 mm dia | 300 | Running Meter | 170 ₹51,000 | 150 ₹45,000 | 20 ₹6,000 Lowest | 30 ₹9,000 | 150 ₹45,000 | 128 ₹38,400 | 150 ₹45,000 |
| 7.00 | Dismantling of cast iron(sand cast)soil, waste and vent pipe upto 100mm bore alongwith fittings and accessories jointed in cement mortar and taking out from walls, floors or from trenches, if required dincluding removing vegetation growth around pipes as required, making good surface to match with existing including necessary scaffolding complete all as specified. | 300 | Running Meter | 125 ₹37,500 | 120 ₹36,000 | 25 ₹7,500 Lowest | 200 ₹60,000 | 120 ₹36,000 | 90 ₹27,000 | 120 ₹36,000 |
| 8.00 | Demolition and breaking up drain pipes(salt glazed stone ware, AC or reinforced concrete) of size 150mm dia set in cement mortar including PCC bedding and haunching etc complete all as specified. | 200 | Running Meter | 126 ₹25,200 | 120 ₹24,000 Lowest | 250 ₹50,000 | 130 ₹26,000 | 120 ₹24,000 Lowest | 190 ₹38,000 | 120 ₹24,000 Lowest |
| 9.00 | Demolition and breaking up drain pipes(salt glazed stone ware, AC or reinforced concrete) of size 200mm dia set in cement mortar including PCC bedding and haunching etc complete all as specified. | 100 | Running Meter | 126 ₹12,600 | 120 ₹12,000 | 90 ₹9,000 Lowest | 120 ₹12,000 | 120 ₹12,000 | 290 ₹29,000 | 120 ₹12,000 |
| 10.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding(but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified. | 230 | Square Meter | 70 ₹16,100 Lowest | 98 ₹22,540 | 90 ₹20,700 | 150 ₹34,500 | 70 ₹16,100 Lowest | 95 ₹21,850 | 70 ₹16,100 Lowest |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
16 Jun 2026, 6:00 pmClosed
GE (I) (AF) Shillong
GE (I) (AF) Shillong Elephant Falls Camp PO Nonglyer Shillong-793009
REPAIR AND CLEANING TO SEWAGE LINES, CLEANING OF SEPTIC TANKS, MANHOLES, SOAKAGE WELLS, DRAINS AND VARIOUS ALLIED WORKS AT AF STN LAITKOR PEAK UNDER GE (I) AF SHILLONG
2026_MES_767886_1
8044/26/E8
Open Tender
Civil Works - Water Works
Item Rate
180 days
GE (I) (AF) Shillong
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (I) (AF) Shillong
₹80,000
Yes
27 Jul 2026
26 May 2026
18 Jun 2026
26 May 2026
16 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as directed. | 30 | Cubic Meter | - | - |
| 2 | Demolition of cement Concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as directed. | 25 | Cubic Meter | - | - |
| 3 | Demolition of reinforced cement concrete of any description and in any position complete all as specified. | 12 | Cubic Meter | - | - |
| 4 | Dismantling of PVC(SWR) drain pipe alongwith fittings and acessories and taking out from walls, floors or from trenches, if required complete all as specified and directed for following sizes :- | - | - | - | - |
| 5 | 75mm dia | 250 | Running Meter | - | - |
| 6 | 110 mm dia | 300 | Running Meter | - | - |
| 7 | Dismantling of cast iron(sand cast)soil, waste and vent pipe upto 100mm bore alongwith fittings and accessories jointed in cement mortar and taking out from walls, floors or from trenches, if required dincluding removing vegetation growth around pipes as required, making good surface to match with existing including necessary scaffolding complete all as specified. | 300 | Running Meter | - | - |
| 8 | Demolition and breaking up drain pipes(salt glazed stone ware, AC or reinforced concrete) of size 150mm dia set in cement mortar including PCC bedding and haunching etc complete all as specified. | 200 | Running Meter | - | - |
| 9 | Demolition and breaking up drain pipes(salt glazed stone ware, AC or reinforced concrete) of size 200mm dia set in cement mortar including PCC bedding and haunching etc complete all as specified. | 100 | Running Meter | - | - |
| 10 | Dismantling floor, hearth or wall tiling including cement mortar bedding(but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified. | 230 | Square Meter | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_859930.xls
BOQ • 0.37 MB
Tender8044.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .