| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.7 LAccepted-AOC ASTBAL MOHALLA BANASAR BAGH ROAD PATIALA GATE SANGRUR 148001 | SANGRUR | SANGRUR | PUNJAB | 148001 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹31.4 L+₹1.4 L (4.66%)Rejected-AOC 154 155 SUBATHU DISTT SOLAN 173206 | SOLAN | SOLAN | HIMACHAL PRADESH | 173206 | L2 | Rejected-AOC Other than lowest bidder | |
| 3 | L3₹33.1 L+₹3.1 L (10.4%)Rejected-AOC | L3 | Rejected-AOC Other than lowest bidder | |
| 4 | L4₹34.2 L+₹4.2 L (13.9%)Rejected-AOC | L4 | Rejected-AOC Other than lowest bidder | |
| 5 | L5₹36.2 L+₹6.2 L (20.6%)Rejected-AOC | L5 | Rejected-AOC Other than lowest bidder |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
25 Mar 2023, 6:00 pmClosed
Rahul Meena, IDSE, EE, Garrison Engineer
GARRISON ENGINEER KASAULI, DISTT SOLAN (HP) PIN 173204 PH 01792273107
REPAIR/ MAINT OF DRAIN, CULVERTS AND CONNECTED SEWAGE PIPE LINE ETC OF 14 GTC SUBATHU UNDER GE KASAULI
2023_MES_582748_1
GEK-86/2022-23
Open Tender
Civil Works
Item Rate
180 days
Subathu under GE Kasauli
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE KASAULI
₹90,000
Yes
17 Apr 2023
24 Feb 2023
1 Apr 2023
24 Feb 2023
25 Mar 2023
11 Mar 2023
Amount
Schedule 'A' Section - I
Demolition of cement concrete (un- reinforced) in ground floor and paving n.exc. 15 cm thick below or above ground level complete all as specified .
PCC 1:3:6 type C-2 (using 40 mm graded stone aggregate) as in surface channels/drains including necessary formwork complete all as specified.
Extra for forming fair finished drain or channel 30 cm inner girth in forms, moulds/stopped ends etc complete all as specified.
Providing , Cement Concrete Type B1 1:2:4 (20 mm graded aggregate )in lintels upto 1.5m clear span, cills, steps; seismic and other similar bands, plinth courses, string courses, lacing courses, parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates, kerbs not provided for in Item 04028, water troughs and the like including weathering, slightly rounded or chamfered angles and throating, as directed.
Excavation in trenches n.exc 1.50m wide and not exceeding 1.50m depth for foundation, etc or not exceeding 10 Sqm on plan and not exceeding 1.5m in depth for shapts, cesspits, manholes, peir holes, etc. and getting out out in Hard /dense soil complete all as specified and as directed by Engr-In-Charge.
Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for complete all as specified and directed.
Demolition and breaking up drain pipes 150 mm dia (Salt glazed ware,AC or Reinforced concrete) set in cement morter complete all as specified and directed.
Demolition and breaking up drain pipes 200 mm dia (Salt glazed ware,AC or Reinforced concrete) set in cement morter complete all as specified and directed.
Material and labour for 150mm bore sail -glazed stoneware drain pipess laid in trenches and jointed as specified and directed by Engr-in- Charge.
Material and labour for 200mm bore sail -glazed stoneware drain pipess laid in trenches and jointed as specified and directed by Engr-in- Charge.
M&L for concrete bed to drain pipes 150mm bore including packing under and haunching against the sides of pipes after they are laid and tested in cement concrete 1:3:6 type C2 using 40mm graded stone aggregate including demolition of damaged concrete complete all as specified and as directed by Engr- in-Charge.
M&L for concrete bed to drain pipes 200mm bore including packing under and haunching against the sides of pipes after they are laid and tested in cement concrete 1:3:6 type C2 using 40mm graded stone aggregate including demolition of damaged concrete complete all as specified and as directed by Engr- in-Charge.
M & L for PCC 1:4:8 type D-2 Using 40 mm graded stone aggregate as in foundations , filling and mass concret complete all as specified.
Demolition of brickwork built in cement or cement lime mortar complete all as specified and as directed by Engr- in-Charge.
M&L Brick work with subclass ‘B’ bricks, straight or curved on plan exc 6m mean radius, built in cement Mortar 1:4 as in manholes complete all as specified and as directed by Engr- in-Charge.
Rendering 15 mm thick on other than fair faces of brick work or concrete surfaces of wall in cement mortar 1:4 for finished even and smooth (without using extra cement) complete all as specified and as directed by Engr- in-Charge.
M&L for extra for forming fair finished drain or channel 30 cm inner girth in cement concrete using extra cement including forms mould stopped ends complete all as specified and as directed by Engr- in-Charge.
M&L for cement concrete 1:2:4 type B-1 using 20mm graded stone aggregate in surface channels, drains and coping including form work complete all as specified and as directed by Engr- in-Charge.
M & L for cutting into exising manholes for connecting new drains, making good to pipe & rendering, cutting out existing benching for & forming branch channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B1, smooth finished & reforming benching as required for internal dia of pipe 150mm. complete all as specified and as directed by Engr- in-Charge.
Material and labour for Precast cement concrete (1:2:4) type B-1 using 20mm graded crushed stone aggregate as in cover slabs of manholes, gully traps etc set in cement mortar (1:4) complete all as specified and directed.
Returning, filling in excavated approved soil spreading, levelling, watering and well ramming in layer n exc 25mm each complete all as specified and as directed by Engr- in-Charge.
Removing of excavation material n exc 50 mtr and deposited where directed at a level n exc 1.50 mtr above the starting point complete all as specified and as directed by Engr- in-Charge.
Dewatering of septic tank and soakage well any size and cleaning by taking out mud/sludge from septic tanks and soakage wellof any depth, in foul conditions and confined places, getting out and removing the sludge to a distance exc 500 m and n.exc 5000 m and deposited where directed in and including borrow pits and covering the borrow pits with 10 cms thick layer of soil complete all as specified and directed. Note for item No 23.00 : Net contents of sludge shall be measured at the time of removal and paid. Quoted rate of tenderer is deemed to be inclusive of dewatering as required and nothing extra shall be admissible to the contractor on this account.
Amount of credit of Rs. 30900.00 for retrived old material as mentioned in Schedule 'A' section-II of tender document in pdf form, will be deducted offline while acceptence of tender.
M/s Parmod Kumar
Sagar Builders
MS GURENDER SINGH
R. P. Suppliers and Construction Co.
NSK TRADER
AUKTA ENERGY PRIVATE LIMITED
Durga Construction
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .