Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24,076Admitted-Finance TANGRALI MALKANA DISTT BATHINDA | BATHINDA | PUNJAB | 151001 | ₹24,076 | L1 | Admitted-Finance |
| 2 | L2₹24,211Admitted-Finance BATHINDA | ₹24,211 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SUKHNAIB SINGH CONTRACTOR L1 | GURNAIB SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods. | 1 | Cum | 20 ₹20 | 30 ₹30 |
| 2.00 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods. | 1 | Cum | 20 ₹20 | 30 ₹30 |
| 3.00 | Dressing of earth work (i) New work or remodeling work. | 1 | Sq.Mtr | 15 ₹15 | 20 ₹20 |
| 4.00 | (6.18 (a)) Dag belling single kassi stroke minimum 7.5 cm depth. | 1 | Km | 1 ₹1 | 1 ₹1 |
| 5.00 | LINING Dressing bed and preparation of sub grade for lining. | 1 | Sq.Mtr | 850 ₹850 | 700 ₹700 |
| 6.00 | Dismantling brick work tile, masonry or tile lining:- (b) In cement | 1 | cum | 20 ₹20 | 20 ₹20 |
| 7.00 | BRICK WORK First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | 1 | Cum | 800 ₹800 | 900 ₹900 |
| 8.00 | PLASTERING & POINTING 10mm thick Cement Plaster 1:4 for Side Walls | 1 | Sq.Mtr | 7,250 ₹7,250 | 7,450 ₹7,450 |
| 9.00 | PLASTERING & POINTING 10mm thick cement plaster 1 : 4 on floors & Top | 1 | Sq.Mtr | 180 ₹180 | 210 ₹210 |
| 10.00 | CONCRETE Supplying & laying dry brick bats | 1 | Cum | 150 ₹150 | 175 ₹175 |
Updated dates
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
25 May 2026, 10:00 amClosed
Executive Engineer
Executive Engineer bathinda canal and GW division bathinda
Estimate for Relining/Lining of watercourse of Outlet RD 6607/TL Katar Singh Wala Sub Minor
2026_WR_166593_5
07/22A/2026-27
Open Tender
Civil Works - Canal
Bathinda
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
₹2.5 L
Yes
29 May 2026
21 Apr 2026
25 May 2026
21 Apr 2026
25 May 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Earth work excavation in ordinary soil, exclusive of compensation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods. | - | Cum | - | - | |
Earth work excavation in ordinary soil, exclusive of compensation of earth:- (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods. | - | Cum | - | - | |
Dressing of earth work (i) New work or remodeling work. | - | Sq.Mtr | - | - | |
(6.18 (a)) Dag belling single kassi stroke minimum 7.5 cm depth. | - | Km | - | - | |
LINING Dressing bed and preparation of sub grade for lining. | - | Sq.Mtr | - | - | |
Dismantling brick work tile, masonry or tile lining:- (b) In cement | - | cum | - | - | |
BRICK WORK First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | - | Cum | - | - | |
PLASTERING & POINTING 10mm thick Cement Plaster 1:4 for Side Walls | - | Sq.Mtr | - | - | |
PLASTERING & POINTING 10mm thick cement plaster 1 : 4 on floors & Top | - | Sq.Mtr | - | - | |
CONCRETE Supplying & laying dry brick bats | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_338143.xls
BOQ • 0.28 MB
TB05.xls
Additional Documents • 0.03 MB
Download all tender documents and submit your bid