Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 CrAccepted-AOC UNIT 4A 4TH FLOOR MAYUR GARDEN OPP OF RAJIV BHAWAN ABC BUS STOP BHANGAGARH G S ROAD GUWAHATI KAMRUP M 781005 | KAMRUP METRO | ASSAM | 781005 | ₹6.4 Cr | L1 | Accepted-AOC AWARDED |
| 2 | L2₹6.4 CrRejected-AOC HOUSE NO 16 WARD NO 4 JORHAT ASSAM | JORHAT | ASSAM | 785001 | ₹6.4 Cr | L2 | Rejected-AOC Not Qualified for AOC |
| Sl No | Description | Qty | Unit | D KUMAR AND COMPANY L1 | M/S STAR CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Supply of geo textile tube (Mega Container) with the minimum properties as mentioned below: -
o Polymer: PP of 400 GSM or above
o Tube Circumference: 10m + 5%
o Fill Port (diameter): 30 to 45 cm
o Tensile Strength (MD): ≥ 100 kN/m
o Tensile Strength (CD): ≥ 100 kN/m
o Elongation – MD: ≤ 25%
o AOS: ≤ 0.180 mm
o Permittivity: ≥ 0.40 S-1
o Length: 25 m | 163 | Per Tube | 1,08,150.11 ₹1,76,28,467.93 | 1,08,222.11 ₹1,76,40,203.93 |
| 2.00 | FilIing of geo-tubes (25 m Iong and 10m circumference) with sand/silt of volume 176 cum by using mud pump not below the fiII height of 1.60m as per drawing and technical specifications, binding the tube with 9mm nylon rope to jati bamboo pegs of length 2m placed @ 5m c/c along both sides of the tube to l‹eep the tube in position during filling, as specified and directed including all Ioading, unloading and handling charges and local carriage upto a distance of 250M, pumping slurry using mud pump from a distance upto 250 m, etc. including setting up of the tube laying platform, complete as directed. | 163 | Per Tube | 39,784.7 ₹64,84,906.1 | 39,784.7 ₹64,84,906.1 |
| 3.00 | Earth work in embankment by Mechanical means by truck carriage with locally available ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 4 cm cube, dressing as per design section and compaction in layers not exceeding 30 cm in thickness and core cutter soil test at every layer and every 500 m distance, etc. complete as directed.
A. Compaction with three wheel static roller of 80-100 kN capacity
For beyond initial 1 Km & up to 10.00 Km & for all lifts
Distance = 4 km | 1,04,082 | Cum. | 382.05 ₹3,97,64,528.1 | 382.05 ₹3,97,64,528.1 |
Tender Value
₹6.4 Cr
EMD Value
₹12.8 L
Closing Date
24 Oct 2025, 2:00 pmClosed
Chief Engineer, WRD, Assam
O/O Chief Engineer Water Resources Department, Basistha, Guwahati 29
Construction of New Embankment from Jamunamukh PWD Bridge to Atigaon, Kopillikan to Premajan including Dowel Bund from Atigaon to Kopillikan, Premajan to Gosaigaon on the left bank of river Kopilli.
2025_DoWR_47489_2
NAGAON/2025-26/RIDF/I
Open Tender
Civil Works
365 days
Nagaon
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹12.8 L
Yes
21 Feb 2026
10 Oct 2025
24 Oct 2025
10 Oct 2025
24 Oct 2025
16 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
gosaigaon_bid.pdf
Tender Documents • 0.62 MB
BOQ_76401.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid