| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Finance | ₹4.1 L | L1 | Admitted-Finance |
| 2 | L2₹4.1 L+₹6,165.95 (1.52%)Admitted-Finance COLLINPUR SOUTH ANDAMAN | ₹4.1 L+₹6,165.95 (1.52%) | L2 | Admitted-Finance |
| 3 | L3₹5.2 L+₹1.2 L (28.9%)Admitted-Finance | ₹5.2 L+₹1.2 L (28.9%) | L3 | Admitted-Finance |
| 4 | L4₹6.7 L+₹2.7 L (66.0%)Admitted-Finance | ₹6.7 L+₹2.7 L (66.0%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAKESH SAHA L2 | SUBHASH CHANDRA MONDAL L3 | KANTI BALA L1 | SHUVAM CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil . Column
Plinth Beam | 9.15 | Cum | 250 ₹2,287.5 Lowest | 400 ₹3,660 | 250 ₹2,287.5 Lowest | 600 ₹5,490 |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift. 20 % of earth cutting | 1.83 | Cum | 350 ₹640.5 | 250 ₹457.5 | 200 ₹366 Lowest | 400 ₹732 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.2 | Cum | 12,000 ₹26,400 | 12,000 ₹26,400 | 10,000 ₹22,000 Lowest | 15,000 ₹33,000 |
| 5.00 | Providing and fixing up to floor five level precast cement concrete hollow block, including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering shuttering complete. 1:1.5:3 (1 Cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.1 | Cum | 13,000 ₹1,05,300 Lowest | 17,500 ₹1,41,750 | 14,000 ₹1,13,400 | 20,000 ₹1,62,000 |
| 6.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Column foundation
Short column | 3.74 | Cum | 13,000 ₹48,620 Lowest | 17,000 ₹63,580 | 14,000 ₹52,360 | 20,000 ₹74,800 |
| 7.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Column,Plinth Beam, Tie Beam, Cornice | 1.06 | Cum | 13,000 ₹13,780 Lowest | 16,000 ₹16,960 | 14,000 ₹14,840 | 17,000 ₹18,020 |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns. Bed, footing, Pedstral, Short Column | 31.16 | Sqm | 350 ₹10,906 Lowest | 500 ₹15,580 | 350 ₹10,906 Lowest | 850 ₹26,486 |
| 8.10 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 29.25 | Sqm | 350 ₹10,237.5 Lowest | 700 ₹20,475 | 350 ₹10,237.5 Lowest | 850 ₹24,862.5 |
| 8.30 | Columns, Pillars, Piers, Abutments, Posts and Struts | 22.8 | Sqm | 400 ₹9,120 | 850 ₹19,380 | 350 ₹7,980 Lowest | 850 ₹19,380 |
| 9.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. hermo-Mechanically Treated bars of grade Fe-500D or more
Jali 10mm Q @ 15cm C/c,Column 12mmQ 4Nos,Stirrups for Column 8mmQ 150mm C/c,Plinth Bean 10mm Q 04 Nos,Stirrups for Column 8mmQ 150mm C/c,Stirrups for Column 8mmQ 150mm C/c. | 643.15 | kg | 110 ₹70,746.5 | 135 ₹86,825.25 | 107 ₹68,817.05 Lowest | 180 ₹1,15,767 |
Tender Value
Refer Docs
EMD Value
₹15,136
Closing Date
18 Jun 2026, 11:00 amClosed
Divisional Forest Officer, Baratang
Divisional Forest Office, Baratang
Construction of Compound wall of the length 45.0 mtr. x 1.2 mtr. height around forest Nursery Camp at Lorojig under Adajig Range, Baratang Forest Division
2026_DFOBT_23174_1
G/236-BT/Vol-III/416
Open Tender
Construction Works
Works
90 days
Lorojig, Baratang
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,136
In the Chamber of the DFO, (BT)
13 Aug 2026
27 May 2026
18 Jun 2026
27 May 2026
18 Jun 2026
27 May 2026
5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil . Column
Plinth Beam | - | Cum | 100 | - |
| - | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift. 20 % of earth cutting | - | Cum | 100 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | Cum | 10 | - |
| - | Providing and fixing up to floor five level precast cement concrete hollow block, including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering shuttering complete. 1:1.5:3 (1 Cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | Cum | 10 | ₹9.99 |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Column foundation
Short column | - | Cum | 10 | - |
| - | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Column,Plinth Beam, Tie Beam, Cornice | - | Cum | 10 | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns. Bed, footing, Pedstral, Short Column | - | Sqm | 10 | - |
| 8.1 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | Sqm | 10 | - |
| 8.3 | Columns, Pillars, Piers, Abutments, Posts and Struts | - | Sqm | 10 | - |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. hermo-Mechanically Treated bars of grade Fe-500D or more
Jali 10mm Q @ 15cm C/c,Column 12mmQ 4Nos,Stirrups for Column 8mmQ 150mm C/c,Plinth Bean 10mm Q 04 Nos,Stirrups for Column 8mmQ 150mm C/c,Stirrups for Column 8mmQ 150mm C/c. | 1 | kg | 10 | ₹9.99 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.79 MB
BOQ_24569.xls
BOQ • 0.35 MB
Corrigendum23194.pdf
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .