Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.9 LAdmitted-Finance BHANDARI NIWAS BHARAT NAGAR TEH DISTT PATHANKOT PIN 145023 | PATHANKOT | PATHANKOT | PUNJAB | 145023 | ₹45.9 L | L1 | Admitted-Finance |
| 2 | L2₹51.3 L+₹5.4 L (11.8%)Admitted-Finance | ₹51.3 L+₹5.4 L (11.8%) | L2 | Admitted-Finance |
| 3 | L3₹51.7 L+₹5.8 L (12.7%)Admitted-Finance 99 MODEL TOWN PATHANKOT 145001 | PATHANKOT | PATHANKOT | PUNJAB | 145001 | ₹51.7 L+₹5.8 L (12.7%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not approved for opening of financial bid being two class below eligible as per Note No 1 of Appx A to NIT |
| 5 | Rejected-Technical BX 167 4 ISHWAR NAGAR PATHANKOT PUNJAB 145001 UDYAM PB 16 0001334 03AALFR1593C1ZE B R | PATHANKOT | PUNJAB | 145001 | - | - | Rejected-Technical Not approved for opening of financial bid being two class below eligible as per Note No 1 of Appx A to NIT |
| Sl No | Description | Qty | Unit | pardeep singh marwaha L2 | satpal and brothers L3 | M/s GIrdhari Lal Rakesh Kumar L1 |
|---|---|---|---|---|---|---|
| 1.00 | Demolition of brickwork or stone/boulder masonry built in cement mortar including all quoins, arches, pillars etc., but excluding ashlar facing, dressed stone work and precast concrete articles, complete all as specified & directed. | 18 | Cum | 100 ₹1,800 | 111 ₹1,998 | 11 ₹198 Lowest |
| 2.00 | Demolition of cement concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified & directed. | 14.4 | Cum | 100 ₹1,440 | 111 ₹1,598.4 | 11 ₹158.4 Lowest |
| 3.00 | Demolition of cement concrete (unreinforced) Roof, Floors (other than Ground floors), Beams, staircase,landing,chajjas and similar suspended work complete all as specified & directed. | 1 | Cum | 100 ₹100 | 111 ₹111 | 11 ₹11 Lowest |
| 4.00 | Demolition of cement concrete (Re-inforced) of any description and in any position not otherwise specifically provided for complete all as specified & directed. | 2.3 | Cum | 100 ₹230 | 111 ₹255.3 | 11 ₹25.3 Lowest |
| 5.00 | M & L for Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust etc including brushing with neat cement slurry with 3.0 Kg of cement per Sqm complete all as specified & directed. | 100 | Sqm | 100 ₹10,000 | 11 ₹1,100 | 5.5 ₹550 Lowest |
| 6.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), rubbish off the debris out of MOD premises complete all as specified and directed | 195.6 | Sqm | 10 ₹1,956 Lowest | 11 ₹2,151.6 | 11 ₹2,151.6 |
| 7.00 | Taking down cement plaster/wall tiles including backing etc from brick/stone walls / concrete surfaces including raking out joints, hacking for key , scrubbing down with water etc complete all as specified and directed | 200 | Sqm | 10 ₹2,000 Lowest | 11 ₹2,200 | 11 ₹2,200 |
| 8.00 | Taking down chowkats or frames including shutters (without taking off shutters from the frame) not exc. 1.5 Sqm each, complete all as specified & directed. | 15 | Each | 44 ₹660 | 111 ₹1,665 | 11 ₹165 Lowest |
| 9.00 | Taking down chowkats or frames including shutters (without taking off shutters from the frame) exc. 1.5 Sqm but n exc 4.0 sqm each, complete all as specified & directed. | 10 | Each | 44 ₹440 | 111 ₹1,110 | 11 ₹110 Lowest |
| 10.00 | Taking down shutters of any description exc. 1 sqm and not exc. 2 Sqm each, complete all as specified & directed. | 50 | Leaf | 44 ₹2,200 | 111 ₹5,550 | 11 ₹550 Lowest |
Tender Value
₹55 L
EMD Value
₹1.1 L
Closing Date
7 Aug 2026, 6:00 pmClosed
SHRI AK MISHRA, IDSE, CWE
HQ CWE MAMUN PIN 145001
COMPREHENSIVE MAINT FOR MD AND OTM ACCN OF BASANTAR CHAIN SINGH ENCLAVE CBS GHAROTA AND CERTAIN OTHER UNITS UNDER AGE BR I OF GE S MAMUN
2026_MES_777853_1
CWE/M-TOKEN20/2026-27
Open Tender
Civil Works
Item Rate
180 days
MAMUN
As per tender documents
9 documents required · 9 mandatory
₹1,000
Yes
GE SOUTH MAMUN
₹1.1 L
Yes
17 Sept 2026
10 Jul 2026
14 Aug 2026
10 Jul 2026
7 Aug 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brickwork or stone/boulder masonry built in cement mortar including all quoins, arches, pillars etc., but excluding ashlar facing, dressed stone work and precast concrete articles, complete all as specified & directed. | 18 | Cum | - | - |
| 2 | Demolition of cement concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified & directed. | 14.4 | Cum | - | - |
| 3 | Demolition of cement concrete (unreinforced) Roof, Floors (other than Ground floors), Beams, staircase,landing,chajjas and similar suspended work complete all as specified & directed. | 1 | Cum | - | - |
| 4 | Demolition of cement concrete (Re-inforced) of any description and in any position not otherwise specifically provided for complete all as specified & directed. | 2.3 | Cum | - | - |
| 5 | M & L for Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust etc including brushing with neat cement slurry with 3.0 Kg of cement per Sqm complete all as specified & directed. | 100 | Sqm | - | - |
| 6 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), rubbish off the debris out of MOD premises complete all as specified and directed | 195.6 | Sqm | - | - |
| 7 | Taking down cement plaster/wall tiles including backing etc from brick/stone walls / concrete surfaces including raking out joints, hacking for key , scrubbing down with water etc complete all as specified and directed | 200 | Sqm | - | - |
| 8 | Taking down chowkats or frames including shutters (without taking off shutters from the frame) not exc. 1.5 Sqm each, complete all as specified & directed. | 15 | Each | - | - |
| 9 | Taking down chowkats or frames including shutters (without taking off shutters from the frame) exc. 1.5 Sqm but n exc 4.0 sqm each, complete all as specified & directed. | 10 | Each | - | - |
| 10 | Taking down shutters of any description exc. 1 sqm and not exc. 2 Sqm each, complete all as specified & directed. | 50 | Leaf | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_871174.xls
BOQ • 2.31 MB
TENDER20.pdf
Tender Documents • 1.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .