Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.8 LAdmitted-Finance | -33.69% | ₹25.8 L | L1 | Admitted-Finance |
| 2 | L2₹26.2 LAdmitted-Finance | -32.71% | ₹26.2 L | L2 | Admitted-Finance |
| 3 | L3₹26.8 LAdmitted-Finance | -31.07% | ₹26.8 L | L3 | Admitted-Finance |
| 4 | L4₹27.2 LAdmitted-Finance | -30.05% | ₹27.2 L | L4 | Admitted-Finance |
| 5 | L5₹30.1 LAdmitted-Finance | -22.63% | ₹30.1 L | L5 | Admitted-Finance |
Tender Value
₹38.9 L
EMD Value
₹77,766
Closing Date
3 Apr 2026, 3:00 pmClosed
EE/SD-2/DDA
EE/SD-2/DDA/SEED BED PARK SHAKARPUR DELHI
Providing and Fixing G.I. chain link fabric fencing from Club House to Pump House around Nursery, Around Practice Cricket Pitches and Nursery Near Hockey Ground at Yamuna Sports Complex.
2026_DDA_903749_1
38/EE/Sports Division - 2/DDA/2025-26
Open Tender
Civil Works
60 days
EE/SD-2/DDA/SEED BED PARK SHAKARPUR DELHI
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹77,766
10 Apr 2026
25 Mar 2026
4 Apr 2026
25 Mar 2026
3 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. All kinds of soil | |||||
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-lll) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | |||||
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | |||||
| 4Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns | |||||
| 5Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes | |||||
| 6Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | |||||
| 7 | Providing Mild steel round bar of 8mm dia including straightening, cutting and placing in position all complete as per direction of Engineer-in-Charge. | - | kg | 87.55 | - |
| 8Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in charge. (a) Made of G.I. wire of dia 4 mm | |||||
| 9Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | |||||
| 86Less For GST correction factor on DSR items @0.973 = | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.73 MB
BOQ_949926.xls
BOQ • 0.30 MB
38.pdf
Tender Documents • 1.85 MB
Download all tender documents and submit your bid