Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹99,866.19Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹99,916.14+₹49.96 (0.05%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
EMD Value
₹3,000
Closing Date
22 Jul 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O PASSENGER SHED NEAR MIDDLE SCHOOL PANZMULLA BLOCK KPORA
2026_RDPR_316267_16
ENIT64of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹3,000
26 Jul 2026
16 Jul 2026
23 Jul 2026
16 Jul 2026
22 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Site Clearence including removing of unhygenic material, bricks,vegetation and inequalities , roots, saplings etc | 1 | NO | - | - |
| 3 | Earth work in excavation by manual means in trenches for foundations drains , pipes , cablesetc. (not exceeding 1.5 m in width ) and for shafts ,wells , cesspits and the like not exceeding 58 sqm on plan depth up to 1.5 m including disposal ofexcavated earth up to 1 m from cutting edge disposal earth is to be leveled and neatly dressed in all kinds of soil. | 1.53 | cum | - | - |
| 4 | Providing and laying stone soling hand packed in foundation complete with all costs and carriages.( incld plum ) | 1.6 | cum | - | - |
| 5 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:2:4) and by using 20 mm down aggregates | 2.55 | CUM | - | - |
| 6 | Centering & shuttering including strutting & propping etc in foundations footings, bases of columns etc incl. removal of forms complete job. | 7.8 | SQM | - | - |
| 7 | Structural steel work in BUILTUP section fixed without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. In tees, R.S. joists, angles, flats and channels | 448 | KG | 1 | ₹447.55 |
| 8 | Providing corrugated coloured profile G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required, 0.400 mm thick with zinc coating not less | 13 | SQM | 852 | ₹11,076 |
| 9 | Carriage of materials by mechanical transport
Sand & Bajri at an average lead of 20kms | 1 | cum | - | - |
| 10 | Add photograph & signbaord charges | 1 | Job | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_1030882.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .