Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.9 LAccepted-AOC FLAT NO 7 MHAMBRE BLDG DR FRANCISCO LUIS GOMES ROAD VASCO DA GAMA GOA 403 802 | SOUTH GOA | GOA | 403802 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹26.0 L+₹4,800 (0.19%)Rejected-Finance | L2 | Rejected-Finance HIGHER BIDDER | |
| 3 | L3₹29.9 L+₹4.0 L (15.4%)Rejected-Finance C2 PAIXOMONTIRO APTS BEHIND NSD ALTO DABOLIM VASCO DA GAMA GOA 403 801 | SOUTH GOA | GOA | 403801 | L3 | Rejected-Finance HIGHER BIDDER | |
| 4 | L4₹32.0 L+₹6.0 L (23.3%)Rejected-Finance 601 6TH FLOOR MANGOOR VALLEY NEAR GURUDWARA MANGOOR HILLL VASCO DA GAMA GOA 403 802 | SOUTH GOA | GOA | 403802 | L4 | Rejected-Finance HIGHER BIDDER | |
| 5 | L5₹33.2 L+₹7.3 L (28.3%)Rejected-Finance H NO 767 NEAR OLD POST OFFICE NEW VADDEM VASCO DA GAMA GOA 403 802 | SOUTH GOA | GOA | 403802 | L5 | Rejected-Finance HIGHER BIDDER |
Tender Value
₹47 L
EMD Value
₹94,000
Closing Date
6 Apr 2023, 6:00 pmClosed
SHRI BIJENDRA SHARMA IDSE EE
GARRISON ENGINEER (NW) VASCO Opposite KV No.2, School, Shantinagar, Vasco-Da-Gama, Goa-403802
8502/23/E8
2023_MES_584454_1
8502/23/E8
Open Tender
Civil Works
Item Rate
365 days
VASCO
Class D Category a i
9 documents required · 9 mandatory
₹500
GE NW VASCO
₹94,000
Yes
13 May 2023
4 Mar 2023
8 Apr 2023
4 Mar 2023
6 Apr 2023
24 Mar 2023
6 Mar 2023 - 20 Mar 2023
Amount
M&L for removing old paint by removers or burning off by blow lamps and cleaning with scrapers, any number of coats, any width or girth complete all as specified and as directed.
M&L for priming paint, for brick, stone, concrete, asbestos cement or plastered surface complete all as specified and as directed.
M & L for preperation of new painted bituminous / concrete, flexible or rigid surfaces over 10 cm width and applying two coats of runway marking paint water based (white/golden yellow) to lines, dashes arrows, letters etc with necessary painting rollers, all as specified and directed.
M & L for water borne Airfield marking ready mixed, single component paint TT-P-1952 type III with high build acrylic binder of minimum wet film thickness of 16 mils (0.016 inch) of any colour including TTP-1952 Type-III glass beads (Airport beads) made from virgin glass with high index of refraction (1.9 IOR) and yield should be 550Mcd / m / lux on yellow/ black marking and the minimum ratio of glass beads to binder is 1.198 Kg / Litre complete all as specified by the manufacturer catalog and directed by Engineer-in-Charge. Notes for Sr No. 3.00 & 4.00 (a) Painting will be carried out by using painting machine (b) Conditions for approval and procurement of materials shall be read in conjunction with special conditions of tender documents elaborated in paras 4, 5 & 6 and further subsequent sub paras
M & L for preperation of old painted bituminous / concrete, flexible or rigid surfaces over 10 cm width and applying one coat of runway marking paint water based (white/golden yellow) to lines, dashes arrows, letters etc with necessary painting rollers, all as specified and as directed. Notes:- (a) Painting will be carried out twice in a year (5-6 months interval) or and when required basis. (b) Runway full center line painting will be regularly carried out by monthly or as and when required basis as per relevent schedule given below. (c) Painting will be carried out by using painting machine. (d) Conditions for approval and procurement of materials shall be read in conjunction with special conditions of tender documents elaborated in paras 4, 5 & 6 and further subsequent sub paras.
All as per item No. 5.00 above, second time painting for the same location above for centre line touch down area only, 14 days gap after first time painting or as and when required basis.
All as per item No. 5.00 above, third time painting for the same location above for full centre line only, 14 days gap after second time painting or as and when required basis.
All as per item No. 5.00 above, fourth time painting for the same location above for centre line touch down area only, 14 days gap after third time painting or as and when required basis.
All as per item No. 5.00 above, fifth time painting for the same location above for full centre line only, 14 days after fourth time painting or as and when required basis.
All as per item No. 5.00 above, sixth time painting for the same location above for centre line touch down area only, 14 days gap after fifthtime painting or as and when required basis.
All as per item No. 5.00 above, seventh time painting for the same location above for centre line only, 14 days gap after sixth time painting or as and when required basis.
All as per item No. 5.00 above, eighth time painting for the same location above for centre line touch down area only, 14 days gap after seventh time painting or as and when required basis.
All as per item No. 5.00 above, nineth time painting for the same location above for full centre line only, 14 days after eighth time painting or as and when required basis.
All as per item No. 5.00 above, tenth time painting for the same location above for centre line touch down area only, 14 days after nineth time painting or as and when required basis.
All as per item No. 5.00 above, eleventh time painting for the same location above for full centre line only, 14 days after tenth time painting or as and when required basis.
All as per item No. 5.00 above, twelveth time painting for the same location above for centre line touch down area only, 14 days after eleventh time painting or as and when required basis.
M & L for preperation of old painted bituminous / concrete, flexible or rigid surfaces over 10 cm width and applying one coat of runway marking paint water based (white/golden yellow) to lines, dashes arrows, letters etc with necessary painting rollers, all as specified and as directed. Notes:- (a) Painting will be carried out twice in a year (5-6 months interval) or and when required basis. (b) Runway full center line painting will be regularly carried out by monthly or as and when required basis as per relevent schedule given below. (c) Painting will be carried out by using painting machine. (d) Conditions for approval and procurement of materials shall be read in conjunction with special conditions of tender documents elaborated in paras 4, 5 & 6 and further subsequent sub paras.
All as per item No. 17.00 above, first time painting for the same location above for centre line touch down area only, 14 days gap after above work painting or as and when required basis.
All as per item No. 17.00 above, second time painting for the same location above for full centre line only, 14 days gap after first time painting or as and when required basis.
All as per item No. 17.00 above, third time painting for the same location above for centre line touch down area only, 14 days gap after second time painting or as and when required basis.
All as per item No. 17.00 above, fourth time painting for the same location above for full centre line only, 14 days gap after third time painting or as and when required basis.
All as per item No. 17.00 above, fifth time painting for the same location above for centre line touch down area only, 14 days gap after fourth time painting or as and when required basis.
All as per item No. 17.00 above, sixth time painting for the same location above for full centre line only, 14 days gap after fifth time painting or as and when required basis.
All as per item No. 17.00 above, seventh time painting for the same location above for centre line touch down area only, 14 days gap after sixth time painting or as and when required basis.
All as per item No. 17.00 above, eightth time painting for the same location above for full centre line only, 14 days gap after seventh time painting or as and when required basis.
All as per item No. 17.00 above, nineth time painting for the same location above for centre line touch down area only, 14 days gap after eightth time painting or as and when required basis.
All as per item No. 17.00 above, tenth time painting for the same location above for centre line only, 14 days gap after nineth time painting or as and when required basis.
Preparation of old painted concrete flexible or rigid surface exc 10 cm width and applying one coat of synthetic enamel paint (First quality) including side black strip 1 inch wide on both sides where required all as specified and as directed
M/S. NAVEEN ENGINEERING & CO
M/S P S BABU
SHIVANI ENTERPRISES
M/S DUBAL CONSTRUCTION
SHRIKALP ENGINEERS AND CONTRACTORS
M/s VEEJEE ENTERPRISES
M/S KVG CONSTRUCTIONS
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .