Tender Value
Refer Docs
EMD Value
₹58,000
Closing Date
20 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI COLLECTORATE MADURAI -625020
Deepening and Improvements to the Ooranies_ 4 nos. in AGAMT-II-2021-22 Village panchayats of Madurai West Block in Madurai District in Package no.MW_01
2022_RDTN_239994_1
568/2022/D7Mwest01/24.06.22
Open Tender
Civil Works
Item Rate
180 days
Madurai west
REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹58,000
1 Aug 2022
7 Jul 2022
20 Jul 2022
7 Jul 2022
20 Jul 2022
8 Jul 2022
Amount
Earth work excavation in all soils except hard rock for the formation of bund with lead of 0-100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc.complete.
Earth work excavation in all soils such as red earth, hard stiff clay, stiff black cotton, hard red earth,shales, murrams, gravel except hard rock as per SS 20B
Supplying filling with filling M-Sand in layers not more than 15cm thick, well rammed, wattered and compacted etc, complete
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing, laying, curing etc.complete.
Supplying and erection,centering of sides and soffits including necessary supports and structing for plain surfaces such as RCC slab, lintel, beam, column, sunshade etc.complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply and fixing of 75mm PVC Pipe for Wheep Holes
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete
Rough Stone dry packing using revetment stone inculding cost and conveyance all materials to site and labour charges etc complete
Provision for Name board from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete ( Use SS letter )
Earth work excavation in all soils except hard rock for the formation of bund with lead of 0-100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc.complete.
Earth work excavation in all soils such as red earth, hard stiff clay, stiff black cotton, hard red earth,shales, murrams, gravel except hard rock as per SS 20B
Supplying filling with filling M-Sand in layers not more than 15cm thick, well rammed, wattered and compacted etc, complete
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing, laying, curing etc.complete.
Supplying and erection,centering of sides and soffits including necessary supports and structing for plain surfaces such as RCC slab, lintel, beam, column, sunshade etc.complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply and fixing of 75mm PVC Pipe for Wheep Holes
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete
Rough Stone dry packing using revetment stone inculding cost and conveyance all materials to site and labour charges etc complete
Provision for Name board from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete ( Use SS letter )
Earth work excavation in all soils except hard rock for the formation of bund with lead of 0-100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc.complete.
Earth work excavation in all soils such as red earth, hard stiff clay, stiff black cotton, hard red earth,shales, murrams, gravel except hard rock as per SS 20B
Supplying filling with filling M-Sand in layers not more than 15cm thick, well rammed, wattered and compacted etc, complete
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing, laying, curing etc.complete.
Supplying and erection,centering of sides and soffits including necessary supports and structing for plain surfaces such as RCC slab, lintel, beam, column, sunshade etc.complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply and fixing of 75mm PVC Pipe for Wheep Holes
Rough Stone dry packing using revetment stone inculding cost and conveyance all materials to site and labour charges etc complete
Provision for Name board from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete ( Use SS letter )
Earth work excavation in all soils except hard rock for the formation of bund with lead of 0-100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc.complete.
Earth work excavation in all soils such as red earth, hard stiff clay, stiff black cotton, hard red earth,shales, murrams, gravel except hard rock as per SS 20B
Supplying filling with filling M-Sand in layers not more than 15cm thick, well rammed, wattered and compacted etc, complete
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and labour charges for mixing, laying, curing etc.complete.
Supplying and erection,centering of sides and soffits including necessary supports and structing for plain surfaces such as RCC slab, lintel, beam, column, sunshade etc.complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply and fixing of 75mm PVC Pipe for Wheep Holes
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete
Rough Stone dry packing using revetment stone inculding cost and conveyance all materials to site and labour charges etc complete
Provision for Name board from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete ( Use SS letter )
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
BALAMURUGAN B
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .