| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC 223 4TH STREET SIVANANDHAPURAM SARAVANAMPATTI PO COIMBATORE 641 035 | COIMBATORE | TAMIL NADU | 641035 | ₹15.6 L | L1 | Accepted-AOC evaluated l1 bidder |
| Sl No | Description | Qty | Unit | ssk builders L1 |
|---|---|---|---|---|
| 1.00 | Clearing Scrub jungles with uprooting, disposed from the site as per the direction of site engineer including cost of all labour, lead, lift, etc., complete. | 70 | sqm | 5 ₹350 |
| 2.00 | Dismantling of Brick Masontry in Cement Morter Walls, Clearing away and carefully stacking materials usefull for re use for any thickness of walls including cost of T&Ps, Labour, lead, lift etc., complete. | 6 | cum | 250 ₹1,500 |
| 3.00 | Dismantling of RCC, Clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete. | 2 | cum | 300 ₹600 |
| 4.00 | Dismantling of PCC, Clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete. | 1 | cum | 200 ₹200 |
| 5.00 | Dismantling of Doors & Windows including removal of frames, hinges & fastenings, carefully stacking materials usefull for re use including cost of T&Ps, Labour, lead, lift etc., complete. | 6 | sqm | 200 ₹1,200 |
| 6.00 | Supplying, fabrication & erection of various sizes of I or H Channel for supporting the RCC Roof slab including cutting, cost of material, labour, lead, lift, etc., complete. | 310 | Kg | 140 ₹43,400 |
| 7.00 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders. | 23 | cum | 200 ₹4,600 |
| 8.00 | Earth work excavating and depositing on bank with initial lead of 10m and Initial lift of 2m in Soft Disintegrated rock, laterite, soft rock or kankar, not requireing blasting. | 8 | cum | 200 ₹1,600 |
| 9.00 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in medium rock and dense medium rock, not requiring blasting. | 4 | cum | 250 ₹1,000 |
| 10.00 | Removing hard rock by wedging, chiselling and trimming to proper shape where blasting is prohitibed | 2 | cum | 300 ₹600 |
Tender Value
Refer Docs
EMD Value
₹15,700
Closing Date
24 Feb 2026, 2:00 pmClosed
SE/TIRUPPUR EDC
O/o The Superintending Engineer/Tirupur EDC/, TNPDCL, Civil Section, 208/650, KRBS Towers, IIIrd Floor, Perumanallur Road, Tiruppur-02
EXTENSION OF EXISTING CONTROL ROOM BUILDING FOR UP GRADATION OF EXISTING 30V DC CONTROL SYSTEM INTO 110V DC SYSTEM AT VELAMPALAYAM 33/11 KV SUBSTATION
2026_EB_660135_1
WOT-CIVIL-12-2025-2026
Open Tender
Civil Works
150 days
VELAMPALAYAM
PLEASE REFER TENDER SPECIFICATION
2 documents required · 2 mandatory
₹0
₹15,700
Yes
13 Mar 2026
18 Feb 2026
25 Feb 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
Clearing Scrub jungles with uprooting, disposed from the site as per the direction of site engineer including cost of all labour, lead, lift, etc., complete.
Dismantling of Brick Masontry in Cement Morter Walls, Clearing away and carefully stacking materials usefull for re use for any thickness of walls including cost of T&Ps, Labour, lead, lift etc., complete.
Dismantling of RCC, Clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete.
Dismantling of PCC, Clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete.
Dismantling of Doors & Windows including removal of frames, hinges & fastenings, carefully stacking materials usefull for re use including cost of T&Ps, Labour, lead, lift etc., complete.
Supplying, fabrication & erection of various sizes of I or H Channel for supporting the RCC Roof slab including cutting, cost of material, labour, lead, lift, etc., complete.
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders.
Earth work excavating and depositing on bank with initial lead of 10m and Initial lift of 2m in Soft Disintegrated rock, laterite, soft rock or kankar, not requireing blasting.
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in medium rock and dense medium rock, not requiring blasting.
Removing hard rock by wedging, chiselling and trimming to proper shape where blasting is prohitibed
Providing anti termite treatment in 4 stages I) immediate after earth work excavation and before laying foundation concrete II) after refilling for sides of foundation III) Before laying of flooring concrete IV) outside of basement upto 1.0m alround the buildingusing termite 250ml for 5lit of water etc, complete.
Supplying and filling with M.Sand for foundation, Basement,etc., including cost of material, labour, lead, lift, consolidation, etc., complete.
PCC 1:3:6 using 20mm HBG metal for foundation, basement including cost of all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. (For Raft Concrete)
RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. (For Column Concrete-Upto Ground Level)
RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. (For Column Concrete-Upto Ground Floor Roof Top Level)
RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. (For Column Concrete-Upto First Floor Roof Top Level)
RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. (For Grade Beam & Plinth Beam Concrete)
RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. (For Sill Beam Concrete)
RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. (For Lintel Beam Concrete)
RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement [For 60cm projection = 100 mm tk at wall and 75mm tk at free end and For 100cm projection = 150 mm tk at wall and 100 mm tk at free end] (For Sunshade/Loft Concrete)
RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. (For Roof Beam Concrete)
RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. (For Roof Slab Concrete 125mm Tk)
RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. (For RCC Precast Slab)
Labour Chrages for transportation of RCC precast slab from casting yard to curing tank, further to cable duct location, laying to proper alignment,etc., including cost all labour, T&P, lead, lift, etc., complete.
Brick work in CM 1:5 using II class champer burnt bricks for super & substructure, partition wall, including cost of all materials, labour charges, lead, lift, etc., complete.
Supply, fabrication, fixing of GI angles of 50x50x6mm horizontally @ 50cm c/c to the required length for supporting the cable in the cable duct in correct position including labour, cutting, etc., complete.
Refilling with excavated earth other than sand in foundation, basement and sides of masonry, consolidation as per std.specn.with water including all labour, T&P, lead , lift, etc., complete.
Providing & placing of steel reinforcement for All RCC works including cost of steel rod, binding wire, other materials, labour, T&P, lead, lift, etc., complete.
Plastering with CM 1:5, 12mm thick in sub/super structure including cost of all materials, labour, lead, lift, etc., complete.
Plastering with CM 1:3, 12mm thick for ceiling including cost of all materials, labour, lead, lift, etc., complete.
Flooring with PCC 1:2:4 using 12-20mm HBG metal for basement, control room cable duct including cost of all materials, labour, lead, lift, etc. complete.
Providing weathering course with PCC 1:2:4 using 6-10 mm HBGS of a average thickness of 7.5 cm with water proofing compound and finishing the top with solar reflective tiles over cement mortar 1:3 mix bed, 20mm tk including cost of all materials, pointing, labour, curing, finishing with proper slope, lead, lift, etc., complete.
Providing PVC down fall pipe using 110mm dia 4 Kg/sqcm PVC pipe and pvc clamp line supreme, etc, including fixing PVC washer type door bend & shoe, in correct position and connecting from the roof slab including cost of all materials, labour, transport, lead, lift, etc., complete.
Providing two coats of wall putty of approved quality over the plastered surface including removal of all loosly adhering materials from the wall surface with the help of emery stone, putty blade or wire brush and making the surface in just wet condition as per the specification and approved by the site engineer including cost of all materials, labour, lead, lift, etc., complete.
Painting with two coats of interior emulsion of approved quality and colour over a priming coat for interior wall surfaces including cost of all materials, labour, lead, lift, T&P, etc. complete.
Painting with two coats of exterior emulsion of approved quality and colour over a priming coat for exterior wall surfaces including cost of all materials, labour, lead, lift, T&P, etc. complete.
Flooring with Vitrified tiles 600x600mm of approved Quality, design & colour (Johnson or equivalent make) laid in cement mortar 1:3 -20mm thick including pointing with same coloured cement using 0.4kg/Sqm, finishing the joints, including cost of all materials, labour, lead, lift, etc., complete.
Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should Nost allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting Nosise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames.The window should be got approved from the Executive Engineer before use on work cost of all materials , lead, lift , etc. complete, as per standard specification
Wiring with 2x1.5 sq.mm PVC unsheathed multistrand copper cable of 1100 V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in flush with wall and covering with 3mm thick hylum sheet with steel switch box with continuous earth wire connection 14 SWG TC wire and making good the damaged portion of masonry for PVC concealed light point / fan point (for electronic regulator).
Wring with 2x1.50 Sq.mm PVC unsheathed multistrand copper cables of 1100 V Grade in Suitable PVC regid pipe concealed in wall and ceiling with PVC accessories in flush with wall using suitable steel switch box with 3mm tick hylum sheet covers for 5 A 3 pin non inter locking CS plug including pin top with continuous earth wire connection using 14 SWG TC wire and making good the damaged portion of masonry of PVC concealed plug point.
Wring with 2x4 Sq.mm PVC unsheathed multistrand copper cables of 1100 V Grade in Suitable PVC regid pipe concealed in wall and ceiling with PVC accessories in flush with wall using suitable TW switch box with 3mm tick hylum sheet covers for 15 A 3 pin non inter locking CS plug including pin top with continuous earth wire connection using 14 SWG TC wire and making good the damaged portion of masonry of PVC concealed power plug point.
Supply and fixing of 4' 18W LED 3000k flu.type fitting complete on wall/ceiling with tubes and PVC unsheathed Copper leads from terminal to the fitting.
Supply and fixing of 4' 18W Twin type mirror optic suspension type fitting (phillips/crompton/wipro) with louvers cover complete on wall/ceiling with coduit pipe suspension and PVC unsheathed Copper leads from terminal to the fitting with LED fittings.
Supply and fixing of Bulk head fiting with 9W LED bulb (phillips/crompton/bajaj) with guard on wall/ceiling with PVC unsheathed Copper leads from terminal to the fitting.
Supply and fixing of 30W LED street light fitting with LED of make Philips/Havells/Equivalent with 25mm dia GI pipe with 1 No GI bend on wall with PVC unsheathed Copper leads from terminal to the fitting with MS clamp
Supplying and fixing of 1400mm sweep AC ceiling fan with regulator with 300 mm down rod on the exisitng clamps of crompton/rally/orient including cost of all materials lead, lift etc., complete.
Supply and fixing of Horizontal type 4 way triple pole neutral MCB distribution board in sheet steel enclosure with 40A 4 pole MCB isolater as incoming and 12 Nos. 6 A to 32 A SP MCB as outgoing in flush with wall and making good of the concealed portion with earth connection. The MCBDB and MCB's should be with the ISI mark
SGST & CGST (If applicable quote the value or enter '0')
IGST (If applicable quote the value or enter '0')
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
SPEC12.pdf
Tender Documents • 0.96 MB
BOQ_792065.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid