| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.9 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹27.0 L+₹1.0 L (3.95%)Rejected-Finance | L2 | Rejected-Finance OTHER THAN LOWEST | |
| 3 | L3₹46.8 L+₹20.8 L (80.4%)Rejected-Finance PLOT NO 77 SATYANAGAR SATYANAGAR BHUBANESWAR KHURDA KHORDHA ODISHA 751007 | KHORDHA | ODISHA | 751007 | L3 | Rejected-Finance OTHER THAN LOWEST | |
| 4 | L4₹97.9 L+₹72.0 L (277.7%)Rejected-Finance | L4 | Rejected-Finance OTHER THAN LOWEST | |
| 5 | Rejected-Technical 86 INDUSTRIAL AREA PHASE 1 PANCHKULA HARYANA 134109 | PANCHKULA | HARYANA | 134109 | - | Rejected-Technical NOT MEETING ELIGIBILITY CRITERIA |
Tender Value
₹31.4 L
EMD Value
₹62,800
Closing Date
5 Sept 2022, 6:00 pmClosed
COMMANDER WORKS ENGINEER, DINJAN
COMMANDER WORKS ENGINEER, DINJAN
TOPOGRAPHICAL SURVEY AND SOIL INVESTIGATION AT LEKHABALI MIL STATION UNDER GE 872 EWS
2022_MES_544361_1
84111E8
Open Tender
Survey
Item Rate
120 days
GE 872 EWS
AS PER TENDER
6 documents required · 6 mandatory
₹500
Yes
GE 872 EWS
₹62,800
Yes
7 Oct 2022
10 Aug 2022
7 Sept 2022
10 Aug 2022
5 Sept 2022
24 Aug 2022
10 Aug 2022 - 20 Aug 2022
Amount
Mobilization / Transportation, erection and dismantling of all required equipment at proposed site including deployment of shifted and suitable personnel for effective soil investigation as directed for completion of work and complete all as specified and directed.
Carrying out soil Investigation as per relevant IS for the work as mentioned below, complete all as specified and directed including the following: - (a) Boring 150mm dia hole at various locations as shown at Site by Engineer-in-Charge in any kind of soil but excluding rock, collection of undisturbed samples at every 1.00m depth, Collection of disturbed samples at suitable depth as required at site. Conducting standard penetration test as per relevant IS at an interval of 1.50m. (i) Up to a depth of 15.00m - 34 Nos for Runway etc. (b) Carrying out the following laboratory/field tests on the soil samples as brought out above as per IS Codes:- 34 Nos (i) Soil classification as per IS 1498 (1970) (ii) Specific gravity of the soil. (iii) Liquid limits, plastic limit, plasticity index (IS 2720 : Part V 1975) (iv) Gradation (Particle size distribution) as per IS 2720 : Part 4 (v) Permeability (IS 2720 Part 36/ Part 17) as applicable. 01 test per soil type and minimum 03 tests are to be done even if soil is uniform. Test to be done at a depth of 1 -2 meter (vi) Water table level in each bore hole with date of measurement (vii) Stratification of soil for entire depth of bore log including ground water table location and other properties. Evaluation of shear parameters of undisturbed soil samples by adopting direct shear test. (viii) Natural moisture content (NMC), Void Ratio and Porosity, Tri- Axial and direct shear test and unconfined compression test of undisturbed samples and Bulk, submerged and Dry Density of the soil. (ix) pH value-pH value, one per soil type to be ascertained as per IS:2720 part 26. (ix) pH value-pH value, one per soil type to be ascertained as per IS:2720 part 26. (x) Free Swelling Index (IS 2720 Pt 40) (xi) Atterberg limits (IS 2720 Pt 5) (xii) Moisture density relationships (IS-2720 Pt 7 & 8). (xiii) Swelling Pressure test. (xiv) Organic Matter (IS-2720 Pt 22) (xv) Consolidation Test (IS 2720 Pt 15) (xvi) Evaluation of soaked CBR value at 19 Nos of borehole location (as per IS 2720 Part XVI 1965) and subsequent estimation of ‘K’ as per Table 2 of IRC 58:2015 on the basis of evaluation of soaked CBR value.
Carrying plate load test as per IS 1888-1987 for K value for runway, taxi track and other allied pavement areas as per location shown in the site plan.
Topographical survey by digital total station at grid interval 2 m x 2 m interval with contour interval 0.50 m and submission of the same in 4 hardcopy and soft copy with showing all details of site as directed by Engr-in-Charge and per E-in-C’s Br letter No 95610/Policy/107/E2 (Plg) (Pav) dt 27 Feb 2015.
Carrying out planning of detailed drainage scheme(surface drain & sub surface drain) and calculation of earthwork required for the runway, link taxi track, dispersal, hardstanding etc and submission of the same in 4 hardcopies and softcopy with showing all details of site as directed by Engr-in-Charge. Note :Technical Parameters required to be incorporated while planning the drainage scheme and earthwork calculation for runway and its connected structures/parts are as under:- (i) The level of runway at one end is the existing pavement /landing surface. (ii) Dimensions of runway, taxi track, dispersal, hardstanding as specified. (iii) Longitudinal slope : to be planned not exceeding 1% as per para 5.1.4 of ICAO Aerodrome Design Manual. (iv) Transverse slope : to be planned not exceeding 1.5% as per para 5.1.12 of ICAO Aerodrome Design Manual. (v) Slope of earthern shoulders : to be planned as 2.50% as per para 5.2.9 of ICAO Aerodrome Design Manual. (vi) Pavement cross section as under: (a) PQC : 225 mm (b) DLC : 150 mm (c) WMM : 150 mm (in one layer) (d) GSB Grade V: 300 mm (In two layers of 150 mm each). (vii) Sub surface drainage to be designed as per IRC SP 42:2014
Compilation of Complete Report (SSI, Topographical, Earthwork Calculation and Surface and Sub-surface drainage scheme) as per relevant IS/IRC and recommendation/suggestion for soil stabilization /improvement of subgrade for runway and other allied pavements. Submission of all report booklets ,08 (Eight) copies with CD 03 (Three) copies duly indicating the findings and recommendations as per above.
General Notes for all items of BOQ- 1. Following points to be included in the SSI report (not comprehensive, appropriate data/information may be added as per requirement:- (a) Introduction (b) Objection of the geotechnical investigations (c) Details of the proposed structures (d) Site conditions. (e) Field investigations (f) Laboratory test results (g) Soil Profile (h) Allowable bearing capacity-based on SPT ‘N’ values, ‘c-Ø’ value and permissible settlement with sample calculations.Complete calculations will be submitted in soft copy in the same CD containing the SSI Report. (j) Liquefaction analysis with calculations. (k) Foundation alternatives duly tabulated building wise. (l) Clear recommendations duly vetted by IIT/NIT/Govt Engg College. A table showing building name, BH No, depth & coordinates of the BH corrected SPT ‘N’ values and the recommended SBC and clear recommendation for depth and type of foundation including any soil improvement matching with the site plan should form part of the recommendations foundation including any required Soil improvement matching with the site plan should form part of the recommendations. (m) Annexure including bore logs, c- Ø and indicated for BHs, Likelihood of water-logging at site must also be checked. (n) Planning of detailed drainage scheme(surface drain & sub surface drain) and calculation of earthwork required for the runway, link taxi track, dispersal, hardstanding etc 2. If the soil/water has high (more than permissible) contents of sulphate, chlorides or any other deleterious material, the same should be brought out and appropriate recommendation be offered. The required chemical analysis needs to be undertaken for the same. 3. All relevant IS code on the subject should be followed and mentioned at appropriate places. 4. Signed copy to be fwd pl.
Soigne Engineering Consultants
SWAYIN ENGINEERING ASSOCIATES PVT LTD
M/s APS Corporation Pvt. Ltd.
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .