Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹2.5 L+₹5,677.50 (2.31%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | L3₹2.6 L+₹9,255 (3.76%)Accepted-Finance | L3 | Accepted-Finance ok | |
| 4 | L4₹2.5 L+₹5,805 (2.36%)Accepted-Finance | L4 | Accepted-Finance ok |
Tender Value
₹2.8 L
EMD Value
₹6,995
Closing Date
10 Aug 2021, 5:00 pmClosed
Commissioner
Commissioner MC Solan
Channelization of Nallah from Kalsi house to Sanjay house in Ward No13
2021_UDDHP_50487_1
1227-29, 22.07.2021
Open Tender
Civil Works
Item Rate
60 days
Commissioner MC Solan
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Commissioner MC Solan
₹6,995
2 Sept 2021
31 Jul 2021
11 Aug 2021
31 Jul 2021
10 Aug 2021
31 Jul 2021
Amount
Earth work in surface excavation not exceeding 30 cm in (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.Ordinary rock
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand)
Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars
Chaman Lal Govt Cont.
BHUPENDER SINGH THAKUR
Bhupender Jaswal Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .