| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹1.9 L (1.40%)Admitted-Finance | ₹1.4 Cr+₹1.9 L (1.40%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R.BABU L2 | V.YOGANATHAN L1 |
|---|---|---|---|---|---|
| 1.00Dismantling | |||||
| 2.00 | Dismantling the existing Brick Masonry in Cement mortar in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete. | 49.5 | cum | 225 ₹11,137.5 | 220 ₹10,890 Lowest |
| 3.00 | Dismantling the existing Plain Cement Concrete in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete. | 87.7 | cum | 385 ₹33,764.5 | 380 ₹33,326 Lowest |
| 4.00Construction of Bridge | |||||
| 5.00 | Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring strutting, walling and forming protective bunds whereever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL AND FLEXIBLE APRONS. | 245.36 | cum | 156.6 ₹38,423.38 Lowest | 156.6 ₹38,423.38 Lowest |
| 6.00 | Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RAFT. | 1,045.75 | cum | 366.1 ₹3,82,849.08 Lowest | 366.1 ₹3,82,849.08 Lowest |
| 7.00 | Vibrated reinforced cement concrete M-30 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for CUT OFF WALLS BELOW SILL LEVEL. | 113.35 | cum | 9,402.73 ₹10,65,799.45 Lowest | 9,402.73 ₹10,65,799.45 Lowest |
| 8.00 | Vibrated reinforced cement concrete M-30 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for RAFT BELOW SILL LEVEL. | 186.48 | cum | 7,733.88 ₹14,42,213.94 Lowest | 7,733.88 ₹14,42,213.94 Lowest |
| 9.00 | Filling in side the raft with quarry dust including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete for filling inside the raft. | 714.84 | cum | 673.48 ₹4,81,430.44 Lowest | 673.48 ₹4,81,430.44 Lowest |
| 10.00 | Vibrated Cement Concrete of grade M10, Nominal Mix1:3:6, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for Levelling Course. | 31.08 | cum | 5,006.41 ₹1,55,599.22 Lowest | 5,006.41 ₹1,55,599.22 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
30 Mar 2022, 3:00 pmClosed
0/0 The Project Director DRDA , Kancheepuram
DRDA , Kancheepuram
Reconstruction of Bridge at Sirupinayur Vadapathi road in Uthiramerur Block of Kanchipuram District under NABARD RIDF XXVII(2021-22) Tranche having PKG No. TNKPM 01/2021-22
2022_RDTN_224531_1
R.C. No. DIPR/751/Tender/2022 dated.25.02.2022
Open Tender
Civil Works - Bridges
Item Wise
365 days
Uthiramerur Panchayat Union
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.4 L
DRDA , Kancheepuram
12 Apr 2022
8 Mar 2022
30 Mar 2022
8 Mar 2022
30 Mar 2022
8 Mar 2022
15 Mar 2022
Amount
Dismantling
Dismantling the existing Brick Masonry in Cement mortar in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Dismantling the existing Plain Cement Concrete in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Construction of Bridge
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring strutting, walling and forming protective bunds whereever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL AND FLEXIBLE APRONS.
Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RAFT.
Vibrated reinforced cement concrete M-30 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for CUT OFF WALLS BELOW SILL LEVEL.
Vibrated reinforced cement concrete M-30 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for RAFT BELOW SILL LEVEL.
Filling in side the raft with quarry dust including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete for filling inside the raft.
Vibrated Cement Concrete of grade M10, Nominal Mix1:3:6, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for Levelling Course.
Vibrated Cement Concrete of grade M20 using 20mm & 12mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, WINGS, AND PIERS ABOVE SILL LEVEL.
Vibrated reinforced cement concrete M-25 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS, -
Providing and fixing seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the bckfil IN THE AUTMENTS AND WINGS, -
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site, labour charges for fixing the same in the corrct position and all other incidental charges et., complete.
Vibrated reinforced cement concrete M-30 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cost ofcement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DECK SLAB.
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MoRT&H's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.
Filling behind Abutmants and wings with clean gritty gravel including cost and conveyance of gravel to worksite,laying,handling charges and filling in layers,tamping under optimum moisture content to get the maximum density including watering,with all leads for water and all other incidental charges etc,complete for filling behind the abutment and wings and for rigid aprons.-
Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutment and pier as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete.1 set
Supply and fabrication of Fe-415 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings,including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade-1 MT
Providing surface reinforcement for PCC ABUTMENT & PIER using Fe-415 steel involved, in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete Fe-500 grade-1 MT.
Vibrated Cement Concrete M-15 Grade, Nominal Mix, 1:2:4, using 40mm ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork,lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB.
Vibrated Reinforced Cement Concrete M-30, Grade, Design Mix, using 20mm ISS graded hard granite broken metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, curing concrete, working at heights,hire charges for tools and plants, including all other incidental chages etc., complete for APPROACH SLAB.
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for ixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab.
Vibrated reinforced Concrete M-30, Grade, Design Mix, using 20mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for RCC HAND RAILS AND POSTS OVER DECK SLAB.
Vibrated Cement Concrete M-20, Grade, Nominal Mix 1:1.5:3 , using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specification for CC PARAPET OVER APPROACHES.
Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.
Granite rough stone dry packing for the specified thickness for apron using good size granite rough stone, properly wedged with quarry spalls including cost and conveyance of all materials to site labour charges for packing the same in position and all other incidental charges etc, complete for FLEXIBLE APRON.
Retaining walls
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RETAINING WALLS.
Vibrated Cement Concrete of Grade M-20, Nomional Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for FOOTINGS OF RETAINING WALLS.
Vibrated Cement Concrete of grade M20 Nominal Mix. 1:1.5:3, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for STEM OF RETAINING WALLS-
Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN THE ABUTMENTS AND WINGS.
Approach Road
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Eath with a lead of 2km for filling.
97% COMPACTION
100% COMPACTION
Providing and Laying Granular Sub base as per table No 400-1/400-2 and Grading V of MORTH Revision IV with and any other Granular material or a combination those of for 150 mm thick to give a CBR of 20 on prepared sub grade in accordance with the requirements of the specifications For Sand, Gravel & 6 mm Aggregate Mix
Providing and laying Wet Mix Macadam Base Course of 125mm thickness or else as specified on the prepared sub-Base with graded stone aggregate and granular materials of quality size and grading placed in layers as specified including mixing in Base mix plant,spreading in nuiform layer in motor grader and compacting with Vibrating Roller of 80 to 100kN static weight and ffine dressing for required grade and cross slope as shown on the drawing,equipment safety measures, testing and incidentals necessary to complete the work as per Technical Specification Clause 406 and as directed by Engineer.
Proivding and laying of Prime coat using Emulsion Bitumen(SS-1) at the rate of 7.00kg/sq.m over the WMM surface preparatory to another construction over it.
Proivding and laying of Tack coat using Emulsion Bitumen (RS-1) at the rate of 2.50kg/sq.m over the promer treated WMM surface preparatory to another construction over it.
Proivding and laying of Open Premix carpet with seal coat over the treated WMM surface preparatory to another construction over it.
Diversion Road
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 2km for formation of Diversion Road.
Providing and Laying Granular Sub base as per table No 400-1/400-2 and Grading V of MORTH Revision IV with and any other Granular material or a combination those of for 150 mm thick to give a CBR of 20 on prepared sub grade in accordance with the requirements of the specifications For Sand, Gravel & 6 mm Aggregate Mix
Providing and laying Wet Mix Macadam Base Course of 125mm thickness or else as specified on the prepared sub-Base with graded stone aggregate and granular materials of quality size and grading placed in layers as specified including mixing in Base mix plant,spreading in nuiform layer in motor grader and compacting with Vibrating Roller of 80 to 100kN static weight and ffine dressing for required grade and cross slope as shown on the drawing,equipment safety measures, testing and incidentals necessary to complete the work as per Technical Specification Clause 406 and as directed by Engineer.
Supply of NP 3 class RCC 1000 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete for culvert.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R.BABU
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.10 MB
PriceBid.pdf
Additional Documents • 3.61 MB
TechinalBid.pdf
Tender Documents • 0.40 MB
BOQ_265482.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .