Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹47 L
EMD Value
₹47,000
Closing Date
15 Jun 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer TEDC Tuticorin
131, 132, Ettayapuram Road, Tuticorin
WC-001/2022-2023 MOORTHEESWARAPURAM FEEDER
2022_EB_232865_3
WC-001/2022-2023 MOORTHEESWARAPURAM FEEDER
Open Tender
Electrical Works
Item Rate
120 days
Tuticorin
Refer tender document
2 documents required · 2 mandatory
₹0
₹47,000
Yes
23 Jun 2022
8 Jun 2022
16 Jun 2022
8 Jun 2022
15 Jun 2022
8 Jun 2022
8 Jun 2022 - 15 Jun 2022
Amount
Excavation of Stay pit 4.5' to 5' depth by using JCB or manual
Excavation of pole pit upto 8 mtr PSC poles by using JCB or manual
Excavation of pole pit upto 9.14 mtr Pole by using JCB or manual
Excavation of RSJ pole pit above 36' by using JCB or manual
Erection of 8 mtr PSC poles by using JCB or maual
Erection of 9 mtr PSC poles by using JCB or maual
Erection of RSJ Rail, fabricated poles above 36'-0' by using JCB or maual
Erection of stay set complete
Fixing of 3.6" "V" cross arms(all types) / channel cross arms/ guarding Cross arms
Erection of Tapping Channel X arm
Erection of metering arrangement
Numbering of poles
Fixing of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Fixing of HT/LT TI Fittings
Fixing of pin Insulators with Pin 11 KV
Fixing of 11 KV strain disc.
Fixing of LT pin Insulator with pin
Fixing of LT shackle
Earthing of pole with pin including burying looping and binding
Paving of Conductor, stringing, binding Jumpering etc., complete with 7/4.09ACSR for both HT/LT lines with LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with7/2.59 mm ACSR for both HT/LT lines with LC work.
Concreting of Poles as per Board standards (2*2*5). The material such as sand, jelly, etc., have to be supplied by contractor including Cement supplied by Contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour Charges for placing Transporting of Sand, jally, from box and water curing etc,. complete as per field Engineer's instructions.
Erection of Single Pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with tubs including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (Except erection of Transformer)
Transport of Materials/ conductors and other materials from road side to site.
Transport of poles/Materials/ conductors and other materials from store to site ( for Hired Vehicle) upto 20KM
Loading/Unloading of poles upto 8 mtr PSC poles
Loading/Unloading of poles upto 9 mtr PSC poles & RCC Square Pole
Loading/Unloading of poles above 36'-0' RSJ pole
Transporting of 8mt poles from road site to pole pit including loading and unloading of poles by using JCB or manual
Transporting of 9.0mt poles & 9.0mt RCC Square Pole from road site to pole pit including loading and unloading of poles by using JCB or manual
Transporting of poles above 36'-0' RSJ polefrom road site to pole pit including loading and unloading of poles by using JCB or manual
Loading or unloading of Transformer upto 200 KVA for each
Transporting of Distribution Transformer up to 20KM
Dismantling of Distribution Transformer upto 200 KVA
Erection of street light switch point arrangement
Erection of D.P. structure with AB switch top channel, cross bracing, HG fuse set, earthing, painting, providing stay and pole concreting as per field Engineer's instructions.
Alteration of Back clamp
Alteration of Stay clamp
Changing of Pin Point to Cut point in LT line
Aluminium painting including labour, materials, lead, lift, etc., for all types of X arm/ Channel/Clamps / Bolt & Nut Etc., for above works
11KV BAY EXTENSION WORKS (1 No Splitup details given from Sl.No:43 to 58)
VCB PLINTH ERECTION WORKS
Earthwork excavating, depositing on bank with an initial lead of 10 m and lift of 2 m in medium rock and dense medium rock not requiring blasting
PCC 1:3:6 using 20 mm HBS jelly including cost of all materials, lead, lift, etc., complete without form work.
PCC 1:3:6 using 20 mm HBS jelly including cost of all materials, lead, lift, etc., complete with form work.
Plastering with CM 1:5, 12 mm thick including cost of all materials, lead, lift, curing etc., complete
Labour charges for painting the plinths Providing two coats of ready mixed Exterior Emulsion painting of approved colour & quality on outer walls over one coat of white cement primer,including cost of all materials, scaffolding charges, labours, lead, lift, etc. complete.- to be done by contractor)
Labour Charges for providing grouting pocket, placing the template for breaker foundation as per the drawing, grouting the foundation bolt as per the instruction of the site engineer including the cost of curing, T&Ps etc., complete
Labour for Erection of 33/22/11 KV breaker with own crane arrangement and connecting link rod, SF6 gas filling and other consumables including support poles cutting, jointing, providing holes and bending of pipes whereever required and as directed by the field engineer
Labour for erection of 11KV/33KV AB switches including the cost of consumables, lubricant, wiring and alignment, checking of operation and commissioning and as directed by the field engineer.
Labour for erection of LAS Distribution type single pole stack 33 KV /11KV including fabrication of base if required
Labour for erection of 33/22/11 KV Measurement Transformer using manual labour or crane own arrangement (one S Ph or 3 Ph unit ) including providing holes wherever required as directed by the field engineer.
Labour for erection of droppers and jumpers including fabrication and any modification of end clamps wherever necessary and as directed by the field engineer.
Labour for erection of Busbar including fabrication and any modification of end clamp wherever necessary and as directed by the field engineer. Using 50mm bus bar of length (without making bends)
Erection of Simplex Panel including alignment and earthing as directed by field engineer
Labour for laying of cable in duct/trunch including the cost of Alu.tag for identification.Upto 8 core
Labour Charges for VCB , CT,AB SWITCH & Panel Erthing works
Labour for providing New Bay Channel extension works including Double coating Aluminium painting of Iron parts
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .