Tender Value
₹9.2 L
EMD Value
₹19,000
Closing Date
7 Jan 2021, 2:00 pmClosed
SE OMC IV, CTPS, PTPP, PARICHHA
OFFICE OF SE OMC IV, CTPS, PTPP, PARICHHA
Routine Maintenance, upkeep and Breakdown maintenance of 400 220 KV Switchyard
2020_RVUNL_538987_1
T-16/OMC-I/EMD-I/CTPS/20-21
Open Limited
Electrical Works
Lump-sum
365 days
PTPP PARICHHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Dy Chief Account Office, CFA and BO, PTPP
₹19,000
20 Jan 2021
17 Dec 2020
8 Jan 2021
17 Dec 2020
7 Jan 2021
18 Dec 2020
Amount
Routine Maintenance & upkeep of 400 /220 KV Switchyard & associated Equipments of 2x250 MW PTEP, Parichha, Jhansi as per scope of work from Sl. No. A to G of Part-I & from Sl. No. A to D of Part-II
Installation of one complete pole of 400/220 KV CB along with associated work
Dismantling of one complete pole of 400/220 KV CB along with associated work
Replacement of interrupter unit of one pole of 400/220 KV CB
Only Dismantling OR only installation of (4)
Only Dismantling OR only installation of one arm of one pole of HCB Isolator of 400/220 KV
Replacement of (6)
Dismantling OR installation of 400 KV Pantograph isolator – one pole
Replacement of (8)
Replacement of trapeze assembly
To provide assistance in overhauling of one pole of 400 KV or 220 KV CB & its other associated works
Replacement of wave trap of one phase
Overhauling or replacement of gear operating mechanism of 220 KV HCB isolator (gang operated) OR one pole of HCB/Pantograph isolator of 400 KV system
Replacement of damaged P.G. clamp or jumper of 400 KV system
Replacement of damaged P.G. clamp or jumper of 220 KV system
Replacement of Male or Female contacts of one pole of 400 KV HCB Isolator
Replacement of Male or Female contacts of one pole of 220 KV HCB Isolator
Erection and Dismantling of Scaffolding in 220/400 KV switchyard per pole.
Installation of one No. H.T. bushing or its gasket or its bushing C.T. in 400/220 KV transformers including all associated works
Same as (19) but for 220 KV side
Installation of Neutral bushing
Replacement of HV or LV turret or Gasket
Replacement of PRV of ICT/ Reactor
Installation of one Radiator bank of ICT / Reactor
Centrifuging of 315 MVA ICT/125 MVAR Reactor for one day
Replacement of one Buchholz relay of ICT/Reactor/ Transformer
Shifting of one centrifuging machine of 10KL/6 KL capacity from transformer yard to switchyard
Shifting of one 10 KL capacity oil tank
Modification of base of LA/CT/CVT of 400 KV or 220 KV system & necessary connection modification of jumper (excluding removal/installation of LA/CT/CVT)
Replacement of 400KV line side dropping conductor with associated work.
Replacement of 220KV line side dropping conductor with associated work.
Replacement & installation of 4 inch or 3 inch aluminum pipe conductor.
Replacement & installation of 400KV or 220 KV side CT/CVT/LA OR ISOLATOR dropping conductor with associated work.
Replacement & installation of 400KV or 220 KV side insulator string with associated hardware.
Replacement of damaged CT/CVT/LA of one pole of 400/220 KV system by new similar equipment.
Shifting of 400KV or 220KV Breaker/bushing/current transformer or CVT from central store to switchyard /Shifting of damaged equipment from 400/220 KV switchyard to any assigned site inside the plant
Tightness of clamp and conductor connection at One Clamp of 400/220 KV C.T.
Tightness of clamp and conductor connection at One clamp of 400 KV CVT
Tightness of clamp and conductor connection at One clamp of 400/220 KV LA
Tightness of clamp and conductor connection at One clamp of 400/220 KV Circuit Breaker
Tightness of clamp and conductor connection at One clamp of 400/220 KV Isolator
Proper cleaning and painting inside and outside fencing of 400 & 220 KV switchyard and transformer yard
Proper cleaning and painting of various electrical equipments in switchyard and transformer yard as per scope of work
Overhauling of dewatering pump installed in 400 KV Switchyard with associated work.
Shifting of new transformer oil filled drums from central store/ any site within plant to transformer yard/ shifting of old transformer oil filled drum from site to CSD store or at the assigned site.
Shifting of empty transformer oil drums from Site to CSD store.
M/S MRP CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .