GEMC-511687798479015
Awarded to RAJAGANAPATHY ENGINEERINGS
₹1.3 Cr
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| ASSISTANCE FOR SAFETY and Mech SERVICES unit rate to be calculated based on semi skilled rate margins | RGE | 9987 | 15 Month | 52,215 | 783,225 |
| MAINTENANCE OF DCP FIRE EXTINGUISHER 9KG | RGE | 9987 | 4,000 Nos | 25.96 | 103,840 |
| SERVICING OF FIRE EXTINGUISHER 25KG AND 75KG | RGE | 9987 | 500 Nos | 100.3 | 50,150 |
| SERVICING OF FIRE EXTINGUISHER 1KG TO 4.5KG | RGE | 9987 | 750 Nos | 23.6 | 17,700 |
| REFILLING OF CO2 GAS 2KG TO 6.8KG | RGE | 9987 | 80 Kg | 118 | 9,440 |
| REFILLING OF FIRE EXTINGUISHER 9KG | RGE | 9987 | 80 Nos | 755.2 | 60,416 |
| DCMP MOCK DRILL ARRANGEMENTS | RGE | 9985 | 3 Nos | 5,900 | 17,700 |
| FOAM POURER TESTING | RGE | 9983 | 150 Nos | 472 | 70,800 |
| HYDROTESTING FIRE HOSE | RGE | 9983 | 200 Nos | 236 | 47,200 |
| SUPPLY OF DRY CHEMICAL POWDER | RGE | 9983 | 200 Kg | 61.36 | 12,272 |
| SUPPLY AND FIXING HOSE,DCP,9KG | RGE | 9987 | 100 Nos | 177 | 17,700 |
| FABRICATION, WELDING AND ERECTION OF STRUCTURAL STEEL | RGE | 9987 | 6 Metric Ton | 60,180 | 361,080 |
| SUPPLY AND INSTALLATION SAFETY CLIP AND Safety Pin | RGE | 8424 | 50 Nos | 41.3 | 2,065 |
| SUPPLY AND INSTALLATION DISCHARGE HOSE FOR 25KG DCP | RGE | 8424 | 17 Nos | 1,121 | 19,057 |
| SUPPLY AND INSTALLATION DISCHARGE HOSE FOR 75KG DCP | RGE | 8424 | 6 Nos | 1,463.2 | 8,779.2 |
| SUPPLY AND INSTALLATION DISCHARGE HOSE FOR 4.5KG CO2 DCP | RGE | 8424 | 15 Nos | 737.5 | 11,062.5 |
| SUPPLY AND INSTALLATION DISCHARGE HORN,4.5KG CO2 DCP | RGE | 9954 | 10 Nos | 336.3 | 3,363 |
| SUPPLY AND INSTALLATION DISCHARGE HORN,2KG CO2 DCP | RGE | 9954 | 5 Nos | 283.2 | 1,416 |
| ULTRASONIC TESTING OF FIRE EXTINGUISHER | RGE | 9954 | 300 Nos | 118 | 35,400 |
| SUPPLY AND INSTALLATION LUMINOUS WIND SOCK | RGE | 9954 | 20 Nos | 1,563.5 | 31,270 |
| SUPPLY AND INSTALLATION CONNECTING HOSE | RGE | 9983 | 12 Nos | 849.6 | 10,195.2 |
| SERVICING OF SPRINKLER NOZZLE | RGE | 9987 | 7,500 Nos | 80.24 | 601,800 |
| SERVICING OF FIRE HOSE | RGE | 9985 | 30 Nos | 495.6 | 14,868 |
| WELDING OF PIPE ALL DIA | RGE | 9954 | 1,500 Inch Dia | 247.8 | 371,700 |
| SUPPLY AND INSTALLATION OF BUTTERFLY VALVE | RGE | 9987 | 10 Nos | 5,487 | 54,870 |
| SUPPLY AND INSTALLATION COUPLING WASHER | RGE | 9987 | 100 Nos | 53.1 | 5,310 |
| CLEANING OF STRAINER 6 INCHES AND ABOVE -PRODUCT LINE | RGE | 9985 | 550 Nos | 1,298 | 713,900 |
| CLEANING OF STRAINER UPTO 6 INCHES - PRODUCT LINE | RGE | 9985 | 300 Nos | 395.3 | 118,590 |
| SUPPLY AND INSTALLATION OF 80MM CI BUTTERFLY VALVE | RGE | 9987 | 10 Nos | 3,835 | 38,350 |
| SUPPLY OF SPARK ARRESTOR | RGE | 9985 | 10 Nos | 3,717 | 37,170 |
| SUPPLY OF FIRE HOSE,15MT | RGE | 5909 | 10 Nos | 8,555 | 85,550 |
| SUPPLY AND INSTALLATION OF SPRINKLER NOZZLES | RGE | 9987 | 50 Nos | 590 | 29,500 |
| SUPPLY AND INSTALLATION FIRE HOSE BOX GLASS | RGE | 9987 | 40 Nos | 141.6 | 5,664 |
| SUPPLY OF JET NOZZLE | RGE | 8424 | 5 Nos | 2,478 | 12,390 |
| SUPPLY AND INSTALLATION OF HOSE BOX | RGE | 9987 | 5 Nos | 8,260 | 41,300 |
| REFILLING OF CLEAN AGENT CYLINDER | RGE | 9988 | 4 Nos | 1,298 | 5,192 |
| SUPPLY AND INSTALLATION OF HYDRANT CAP | RGE | 9987 | 10 Nos | 129.8 | 1,298 |
| CLEANING OF STRAINER UPTO 6 INCHES FOR HYDRANT LINES | RGE | 9985 | 1,100 Nos | 247.8 | 272,580 |
| CLEANING OF STRAINER 6 INCHES AND ABOVE FOR HYDRANT LINES | RGE | 9985 | 700 Nos | 802.4 | 561,680 |
| ADDITIONAL MANPOWER ASSISTANCE | RGE | 9985 | 900 Nos | 1,121 | 1,008,900 |
| HYDROTESTING OF PIPELINE | RGE | 9983 | 500 Inch Meter | 10.62 | 5,310 |
| SUPPLY, APPLICATION AND WRAPPING FOR UNDERGROUND PIPELINE | RGE | 9954 | 40 Square Meter | 259.6 | 10,384 |
| TESTING AND CALIBRATION OF TSV and SRV | RGE | 9954 | 100 Nos | 572.3 | 57,230 |
| TESTING AND SERVICING OF PV VENT,3 INCH | RGE | 9983 | 18 Nos | 4,307 | 77,526 |
| TESTING AND SERVICING OF PV VENT,6 INCH | RGE | 9983 | 22 Nos | 5,487 | 120,714 |
| HIRING OF HYDRA CRANE | RGE | 9966 | 100 Hous | 2,271.5 | 227,150 |
| Pipe Modification Product Drain | RGE | 9987 | 250 KL | 3,363 | 840,750 |
| HIRING OF JCB | RGE | 9966 | 20 Hours | 2,301 | 46,020 |
| SUPPLY AND INSTALLATION OF GLAND ROPE FOR Valves | RGE | 9966 | 20 Kg | 212.4 | 4,248 |
| SUPPLY AND FILLING OF SILICA GEL | RGE | 9954 | 20 Kg | 601.8 | 12,036 |
| HYDROTESTING OF UNLOADING HOSE | RGE | 9983 | 1,200 Nos | 259.6 | 311,520 |
| CLEANING AND GREASING OF GATE VALVE UPTO AND INCLUDING 6 INCHES | RGE | 9985 | 1,400 Nos | 68.44 | 95,816 |
| CLEANING AND GREASING OF GATE VALVE 8 INCH AND ABOVE | RGE | 9985 | 1,100 Nos | 99.12 | 109,032 |
| SERVICING OF GEAR OPERATED VALVES | RGE | 9985 | 120 Nos | 153.4 | 18,408 |
| MAINTENANCE OF SWING LADDER | RGE | 9987 | 288 Nos | 198.24 | 57,093.12 |
| REPAIRING OF SWIVEL JOINT | RGE | 9987 | 20 Nos | 4,543 | 90,860 |
| SUPPLY AND INSTALLATION OF BOLT AND NUTS | RGE | 9954 | 200 Nos | 265.5 | 53,100 |
| SUPPLY AND INSTALLATION OF GASKET SHEET | RGE | 9954 | 200 Kg | 342.2 | 68,440 |
| Supply of Structural Steel Erection Aligment AND Welding | RGE | 9988 | 5 Meetric Ton | 147,500 | 737,500 |
| REFILLING OF SCABA CYLINDER 200BAR AND 300BAR | RGE | 9988 | 2 Nos | 3,186 | 6,372 |
| REFILLING OF CLEAN AGENT CYLINDER | RGE | 9988 | 4 Nos | 2,891 | 11,564 |
| Product Tank Cleaning AG Tank | RGE | 9954 | 12 Nos | 44,840 | 538,080 |
| Removing of Dead Stock AG AND UG Tanks | RGE | 9954 | 600 KL | 6,584.4 | 3,950,640 |
| Product Tank Cleaning UG Tank | RGE | 9954 | 8 Nos | 33,453 | 267,624 |
| SERVICING OF DELUGE VALVE | RGE | 9987 | 28 Nos | 3,422 | 95,816 |