| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.8 CrAccepted-Finance | ₹1.8 Cr | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹1.9 Cr+₹8.8 L (4.82%)Rejected-Finance | ₹1.9 Cr+₹8.8 L (4.82%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹2.0 Cr+₹18.2 L (10.0%)Rejected-Finance 16 PRATAP NAGAR CHARBHUJA RAWATBHATA RAJASTHAN 323307 | RAWATBHATA | CHITTORGARH | RAJASTHAN | 323307 | ₹2.0 Cr+₹18.2 L (10.0%) | L-3 | Rejected-Finance L-3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
16 Aug 2024, 6:00 pmClosed
Chief Engineer, Transmission (NE), Gorakhpur.
Pareshan Bhawan, Mohaddipur, Gorakhpur, (UP) 273008
SUPPLY and WORK OF SHIFTING OF TOWER NO 09 NEAR OF BOUNDARY BETWEEN TOWER NO 08 to 13 AND TO CONNECT TOWER NO 10 TO 13 BY REMOVING TOWER NO 11 AND 12 AT 132 KV HATA FCI DC LINE UNDER ETD I GORAKHPUR
2024_UPTCL_941255_1
Short Term Tender No-03-CE(TNE)/2024-25
Open Tender
Electrical Works
Piece-work
90 days
132 KV Hata-FCI, DC Line Under ETD-I
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
ZAOTransmission North East Gorakhpur
₹2.1 L
2 Sept 2024
26 Jul 2024
17 Aug 2024
26 Jul 2024
16 Aug 2024
26 Jul 2024
SUPPLY PORTION
Fabrication, Galvanising, supply of 220 KV NBMC 'C+3, D+0(2)' tower type KRR MODEL for (suitable for ZEBRA conductor) including stubs,tower extension & stub setting template as per above design . The Tower parts includes HT & MS including nut, bolt, washer, hangers,D-shakles etc.
High Tensile Steel
Mild Steel
Hot dip galvanised Hexagon round hexagon head Transmission tower Bolts Nuts and Washer for above structures as per BOM including step bolt & Spring washers.
CONDUCTOR ACCESSORIES
Supply of Mid span compression joint for Zebra conductor
Supply of Vibration Damper suitable for Zebra conductor
Supply of Repair sleeves suitable for Zebra conductor
TOWER ACCESSORIES
Pipe type earthing inclusive all earthing materials
Phase plate in set of red,yellow,blue colour
Danger plate
Ckt plate for both ckt(set of two)
Number plate
Danger Instruction tape
HARDWARE FITTING& INSULATOR SUITABLE FOR ACSR ZEBRA conductor
Single Tension Fitting suitable for zebra conductor
Polymer Insulator 120 KN
Single pilot suspension fitting suitable for zebra conductor
Disc Insulator 70 KN(Anti fog type) for pilot fitting.
24 Fibre (DWSM) OPGW FIBRE OPTIC CABLE (T/W no. 8 to 13)
Joint box(24 FIBRE) with complete set for OPGW
Supply & installation of hardware set for 24 Fibre opgw (T/W no. 8 to 13)
WORK PORTION
Survey including preparation of profile & schedule of materials, marking of locations (Route Length)
Check survey & final peg marking (Route Length)
Soil investigation for all kind of soil
Cost of excavation of 220 KV NBMC 'C+3,D+0(2)' type tower foundation pits including all earth work, back filling, dewatering by boring and leveling. The excavation has to be done manually.
Setting of stubs including all foundation work but excluding cost of concerning and excavation (rate per location) for following 220 KV towers.
220 kv NMD+0 Zebra
220 kv NMC+3 Zebra
Cost of concerning M:20 for all types of foundation including cost of cement ,coarse sand, stone balast, dewatering, shoring and shuttering, forming, curing but excluding cost of reinforcement bars.
Installation of steel reinforcemant bars in RCC foundation including cost of cutting, bending, binding and placing them in foundatiuon pits etc.
Erection of special structure of 220 KV NBMC,C+3,D+0 (2) type tower and their extensions including all works above ground level & modification of existing NBMC type tower no.08(D+0),13 (D+0) as per line alignment and fitting of danger, number & phase plate,ckt plate etc and fixing& punching for 132kv dc line.
Destringing of all three phase ACSR Zebra conductor at both end of Existing NBMC ( tower no. 8 to 13)'B+0',D+0(2) & 'D+6 '(2) type tower after required holding arrangement of adjacent towers with all cost of back stay, rope, steel ceiling, heavy pegs, special T&Ps etc as per site requirement for completion of work etc. (T/W no. 8 to 13)
Safely Destrining/Dismantling of existing OPGW wire at both end of Existing NBMC 'D' type tower after all necessary holding with all cost of back stay, rope, steel ceiling, heavy pegs, special T&Ps etc required for work&safely transporation of all removed material to upptcl store etc (T/W no. 8 to 13)
Dismentalling of existing tower type i.e NBMC 'B+0,D+6' (2) after cutting/opening of nuts, bolts section by section after cutting of tack welding bolts etc & also proper stacking all tower parts piece by piece in UPPTCLstore after transportation site to related UPPTCL store as per direction of supervising engineer with all cost of men ,T&P required for proper completeion of work.
Stringing conductor of new erected 132KV DC LINE (Tower) after laying,tensioning clamping,jointing etc of ACSR Zebra conductor including hoisting of insultors and fitting of all necessary hardware fittings&accessories on all six phases of 132 kv DC lines with all cost of men, T&P, Tractor, steel ceiling ,cone press machine etc required for proper completion of work. (T/W no. 8 to 13)
Stringing of NEW OPGW wire including fixing of all kinds of hardwares/fittings of all necessary tension fitting clamps of hardwares & accessories of OPGW, checking of end to end connectivity & testing etc of 132kv dc line . (T/W no. 8 to 13)
Splicing&Installation of joint Box (24 Fibre) of OPGW
Pipe type earthing of newly erected towers with all associated material salt&coal and t&p etc for proper completion of work.
Transportation of old & dismentalled tower parts with all hardware fitting ,conductor and conductor accessories,insulator etc from site of 132 kv Hata-FCI-II dc line multi circuit section loc.( 9,10,11 &12) to related UPPTCL store.
Tack welding of all the bolts upto the height of one section or 5 mtr from ground level whichever is higher with three tacks of 10 mm/12mm electrode & applicable of Zinc rich paint on the affacted surface including all cost of materials.
Demolition of existing boundary wall and side track of sainik school campus@3 location during exacavation for foundation work and reconstruction,plaster and painting of boundary wall & side track after comptetion of work with all other associated works as per existing boundry.
M/S SHEKHAR ENGINEERING WORKS
Gupta Construction Co.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .