Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.7 LAccepted-Finance | 1 | Accepted-Finance Accepted | |
| 2 | 2₹28.8 L+₹2.1 L (7.84%)Accepted-Finance | 2 | Accepted-Finance Accepted | |
| 3 | 3₹33.0 L+₹6.4 L (23.8%)Accepted-Finance | 3 | Accepted-Finance Accepted | |
| 4 | 4₹35.4 L+₹8.8 L (33.0%)Accepted-Finance A 336 VIKAS PURI NEW DELHI 18 | 4 | Accepted-Finance Accepted | |
| 5 | 5₹35.6 L+₹9.0 L (33.6%)Accepted-Finance | 5 | Accepted-Finance Accepted |
Tender Value
₹50.0 L
EMD Value
₹1.0 L
Closing Date
3 Mar 2022, 3:00 pmClosed
Executive Engineer, CD-VI
EE CD-VI Bharat Nagar Office Complex Delhi-52
Remodeling of ramp along Right Marginal Embankment (RME) at RD 14350 M on city side to maintain accessibility from colony / village to RME.
2022_IFC_217357_1
EE/CD-VI/ACS-71/2021-22
Open Tender
Civil Works
Works
90 days
Delhi
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.0 L
9 Mar 2022
24 Feb 2022
3 Mar 2022
24 Feb 2022
3 Mar 2022
24 Feb 2022
eTendering System Government of NCT of Delhi Created By: Gagan Gaur Created Date/Time: 09-Mar-2022 02:06 PM Tender Title: A/R and M/O Bunds and Drains. Tender ID: 2022_IFC_217357_1
Tender Inviting Authority: Executive Engineer, Civil Division No.VI, I&FC Department
Name of Work: Remodeling of ramp along Right Marginal Embankment (RME) at RD 14350 M on city side to maintain accessibility from colony / village to RME.
Contract No: EE/CD-VI/ACS-71/2021-22
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Satish Kumar (GSTN-07AATPK5586C1ZB) 5000905.100 -25.000 3750678.825 Thirty Seven Lakh Fifty Thousand Six Hundred and Seventy Eight
2.00 KHATRI CONSTRUCTION COMPANY(GSTN-07AAGPK9181Q1ZW) 5000905.100 -42.510 2875020.342 Twenty Eight Lakh Seventy Five Thousand Twenty
3.00 KAVINDER VEER SINGH(GSTN-07AANFK1413E1Z0) 5000905.100 -28.780 3561644.612 Thirty Five Lakh Sixty One Thousand Six Hundred and Fourty Four
4.00 NARENDER KUMAR(GSTN-07AKSPB1943R1ZK) 5000905.100 -22.510 3875201.362 Thirty Eight Lakh Seventy Five Thousand Two Hundred and One
5.00 M/s Prakash Construction Company(GSTN-07ARNPS4426J1ZA) 5000905.100 -33.987 3301247.484 Thirty Three Lakh One Thousand Two Hundred and Fourty Seven
6.00 RAKESH SHARMA(GSTN-07BGFPS6298N1ZE) 5000905.100 -24.350 3783184.708 Thirty Seven Lakh Eighty Three Thousand One Hundred and Eighty Four
7.00 S P CONSTRUCTION COMPANY(GSTN-07AHBPP9135F1ZB) 5000905.100 -21.880 3906707.064 Thirty Nine Lakh Six Thousand Seven Hundred and Seven
8.00 OM SHIV EARTHMOVERS(GSTN-NA) 5000905.100 -46.690 2665982.509 Twenty Six Lakh Sixty Five Thousand Nine Hundred and Eighty Two
9.00 Bal Kishan(GSTN-NA) 5000905.100 -23.230 3839194.845 Thirty Eight Lakh Thirty Nine Thousand One Hundred and Ninty Four
10.00 V.S.CONSTRUCTION CO.(GSTN-NA) 5000905.100 -29.120 3544641.535 Thirty Five Lakh Fourty Four Thousand Six Hundred and Fourty One
Lowest Amount Quoted BY: OM SHIV EARTHMOVERS(2665982.509)
BOQ Summary Details Tender Title: A/R and M/O Bunds and Drains. Tender ID: 2022_IFC_217357_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 OM SHIV EARTHMOVERS 2665982.509 L1
2 KHATRI CONSTRUCTION COMPANY 2875020.342 L2
3 M/s Prakash Construction Company 3301247.484 L3
4 V.S.CONSTRUCTION CO. 3544641.535 L4
5 KAVINDER VEER SINGH 3561644.612 L5
6 Satish Kumar 3750678.825 L6
7 RAKESH SHARMA 3783184.708 L7
8 Bal Kishan 3839194.845 L8
9 NARENDER KUMAR 3875201.362 L9
10 S P CONSTRUCTION COMPANY 3906707.064 L10
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .