Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.4 LAccepted-AOC | 1 | Accepted-AOC OK | |
| 2 | 2₹17.4 L+₹3,766.20 (0.22%)Rejected-Finance 26 B AVTAR COLONY KARNAL 132001 | KARNAL | KARNAL | HARYANA | 132001 | 2 | Rejected-Finance L2 | |
| 3 | 3₹18.0 L+₹60,270.12 (3.46%)Rejected-Finance 2168 9 SHIV COLONY KARNAL 132001 | KARNAL | KARNAL | HARYANA | 132001 | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | The Jai Shiv Shankar Co-operative Labour and Construction Society limited L2 | The karan Vihar Coop L C Society Ltd L1 | THE PARSHURAM CO-OP L&C SOCIETY LTD. L3 |
|---|---|---|---|---|---|---|
| 1.00 | Recovery of Brick tile recovered during execution of work (Demolishing work), including stagging, complete in all respect. | 8,649 | Each | 3.5 ₹-30,271.5 Lowest | 3.5 ₹-30,271.5 Lowest | 3.5 ₹-30,271.5 Lowest |
| 2.00 | Supply, Erection, Testing and Commissioning of Puffin 18W-20W White Bright LED Panel 2`-0`x2`-0` Light Ceiling Downlight Lamp Kit with LED Driver Surface Mount LED Ceiling Light (Pack of 1) (2 Year Warranty) Complete in all respects as per the satisfaction of the Engineer in charge. Make:- Philips, Bajaj, GE, Wipro, K-Lite, Crompton | 40 | Each | 2,050 ₹82,000 Lowest | 2,100 ₹84,000 | 2,250 ₹90,000 |
Tender Value
₹17.5 L
EMD Value
₹35,000
Closing Date
20 Aug 2025, 5:00 pmClosed
Pardeep Kalyan
Municipal Corporation Karnal
Renovation work of Community Centre in Sector-9, Ward No.9, M.C. Karnal (Only for L/C Societies)
2025_HRY_464946_1
2025C360BE1D 6C62 4C87 A630 3E338E2133B4747ULB
Open Tender
Civil Works
Works
60 days
Karnal
2 documents required · 2 mandatory
₹1,000
₹35,000
Yes
29 Aug 2025
13 Aug 2025
21 Aug 2025
13 Aug 2025
20 Aug 2025
13 Aug 2025
Amount
Recovery of Brick tile recovered during execution of work (Demolishing work), including stagging, complete in all respect.
Supply, Erection, Testing and Commissioning of Puffin 18W-20W White Bright LED Panel 2`-0`x2`-0` Light Ceiling Downlight Lamp Kit with LED Driver Surface Mount LED Ceiling Light (Pack of 1) (2 Year Warranty) Complete in all respects as per the satisfaction of the Engineer in charge. Make:- Philips, Bajaj, GE, Wipro, K-Lite, Crompton
Bidder Name
Amount
The Jai Shiv Shankar Co-operative Labour and Construction Society limited (GSTN-NA) BID ID -1319887
The karan Vihar Coop L C Society Ltd (GSTN-NA) BID ID -1319845
THE PARSHURAM CO-OP L&C SOCIETY LTD. (GSTN-NA) BID ID -1320173
The karan Vihar Coop L C Society Ltd (BID ID -1319845)
THE PARSHURAM CO-OP L&C SOCIETY LTD. (BID ID -1320173)
The Jai Shiv Shankar Co-operative Labour and Construction Society limited (BID ID -1319887)
THE PARSHURAM CO-OP L&C SOCIETY LTD. (BID ID -1320173)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .