| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.8 LAccepted-AOC MANDI DIVISION NO II HP PWD MANDI | L1 | Accepted-AOC AOC | |
| 2 | L2₹44.7 L+₹87,322 (1.99%)Rejected-Finance CHANDRONA TEHSIL NOHRADHAR DISTRICT SIRMOUR H P | L2 | Rejected-Finance L2 | |
| 3 | L3₹44.8 L+₹98,734 (2.25%)Rejected-Finance VILL LARHANA P O JAKHYOL TEH BHORANJ DISTT HAMIRPUR H P | HAMIRPUR | HIMACHAL PRADESH | 174304 | L3 | Rejected-Finance L3 | |
| 4 | L4₹44.9 L+₹1.1 L (2.61%)Rejected-Finance HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175047 | L4 | Rejected-Finance L4 | |
| 5 | L5₹45.7 L+₹1.9 L (4.29%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹53.8 L
EMD Value
₹86,500
Closing Date
21 Oct 2023, 5:00 pmClosed
EXECUTIVEENGINEER
Executive Engineer, Bhoranj Division, HP.PWD., Bhoranj
SH- C-o substructure and approaches of 35mtr Span of foot bridge
2023_PWD_80276_1
7640-47 DATED 10.10.2023
Open Tender
Civil Works
Item Rate
270 days
DIVISIONBHORANJ
Please refer Tender documents.
14 documents required · 14 mandatory
₹2,000
₹86,500
19 Nov 2024
16 Oct 2023
23 Oct 2023
16 Oct 2023
21 Oct 2023
16 Oct 2023
Amount
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material including entire carrriage of material within all leads and lfts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. Depth upto 3 mtrs (50% manually and 50% mechanically)
Depth upto 6 mtrs (50% manually and 50% mechanically)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone agg. 40mm nominal size mech. Mixed,Placed in foundation and compacted by vibration i/c curring for 14 days including entire carrriage of material within all leads and lfts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government.
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications including entire carrriage of material within all leads and lfts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. PCC GRADE M-20
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications including entire carrriage of material within all leads and lfts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government.
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications including entire carrriage of material within all leads and lfts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material including entire carrriage of material within all leads and lfts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government.
Supplying, fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications including entire carrriage of material within all leads and lfts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government.
Supplying, fitting and fixing in position true to line and level forged steel roller bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications including entire carrriage of material within all leads and lfts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government.
Excavation for Structure Earth work in excavation for structure as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material:- Ordinary soil upto 3m depth including entire carrriage of material within all leads and lfts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government.
Providing and laying cement concrete 1:4:8 and curing complete including the cost of framework for plain/reinforced concrete in retaining walls, breast walls, as per drawing and HP. PWD technical specifications including entire carrriage of material within all leads and lfts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government.
ASHOK KUMAR
RAKESH CHAND GOVT. CONTRACTOR
SATISH KUMAR
Shubham Puri & Co.
bhanu partap singh
RAKESH KUMAR
Sureshkumar
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .