Loading…
Loading…
Tender Value
₹2.2 L
EMD Value
₹2,200
Closing Date
6 Jul 2026, 5:00 pmClosed
EXECUTIVE OFFICER JAGATSINGHPUR MUNICIPALITY
OFFICE OF THE JAGATSINGHPUR MUNICIPALITY
Const. of Culvert and Repair of road at Brahmana Sahi, W No-17
2026_ORULB_132780_30
JSPURM-EO-Tender-05/2026-27
Open Tender
Civil Works - Others
Percentage
120 days
Const. of Culvert and Repair of road at Brahmana S
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹2,200
Yes
25 Jun 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
6 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kinds of soil within initial lead and lift including rough dressing braking clods and levelling the bed etc. complete as per the direction of EIC. | 12.96 | cum | 299.53 | ₹3,881.91 |
| 2 | Sand filling in Foundation &Plinth including cost conveyance, royalty & taxes and all labour T & P etc. complete as per the direction of EIC. | 2.21 | cum | 528.43 | ₹1,167.83 |
| 3 | C.C.( 1:3:6) using 4Cm size C.B.H.G. metal including cost, carriage,royalty hire chargesof mixture machine & taxes etc. complete(No hand mixing hire chargesof mixture machine & taxes etc. complete(No hand mixing allowed) as per the direction of the Engineer-in-charge. | 2.21 | cum | 6,531.02 | ₹14,433.55 |
| 4 | R.C.C.M 20 using 12 mm size H.G. chips including centering,shuttering,cost, carriage, royalty & taxes etc. complete as per the direction of EIC. | 7.53 | sqm | 6,923.65 | ₹52,135.08 |
| 5 | C.C.M 20 using 12 mm size H.G. chips including centering,shuttering, cost, carriage, royalty & taxes etc. complete as per the direction of EIC. | 10 | sqm | 6,923.65 | ₹69,236.5 |
| 6 | Supplying,cutting, bending, binding and tying the grills in position including cost of tying wire and M.S. Rod etc. complete. | 6.16 | sqm | 8,887.98 | ₹54,749.96 |
| 7.1 | Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete. (WALL) | 44.64 | sqm | 248.57 | ₹11,096.16 |
| 7.2 | Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete. (SLAB) | 13.48 | sqm | 762.1 | ₹10,273.11 |
| 8 | Sand filling in Foundation &Plinth including cost conveyance, royalty & taxes and all labour T & P etc. complete as per the direction of EIC. | 4.32 | sqm | 528.43 | ₹2,282.82 |
| 9 | Add for Tranparancy & Taking Photograph ……..… | 1 | Ls | 1,000 | ₹1,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.47 MB
BOQ_597799.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .