| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.8 LAccepted-AOC 147 UDHYOG VIHAR PH I GURGOAN HARYANA 122016 | GURUGRAM | HARYANA | 122016 | L1 | Accepted-AOC L1 | |
| 2 | L2₹57.9 L+₹4.1 L (7.54%)Rejected-Finance 11 SANJIV BAUG SOCIETY NEW SHARDA MANDIR ROAD PALDI AHMEDABAD GUJARAT 380007 | AHMADABAD | GUJARAT | 380007 | L2 | Rejected-Finance Being L2 |
Tender Value
₹66.7 L
EMD Value
₹1.3 L
Closing Date
23 Dec 2022, 6:00 pmClosed
AGM (E-E), Barapani Airport, Shillong
AGM (E-E), Barapani Airport, Shillong
SITC of Elevators at Technical Block and Transit accommodation at Shillong Airport, Barapani
2022_AAI_132905_1
AAI/ENGG(E)/SHL/SITC OF ELEVATORS/2022-23
Open Tender
Electrical Works
Item Rate
365 days
Barapani Airport, Shillong
As per NIT
5 documents required · 5 mandatory
₹1,180
₹1.3 L
28 May 2024
25 Nov 2022
26 Dec 2022
26 Nov 2022
23 Dec 2022
26 Nov 2022
26 Nov 2022 - 7 Dec 2022
Amount
Supplying, installation, testing and commissioning of 6 Passenger (408 kg) lift (Gearless Machine room less) having speed of 1 meter per sec. serving different floors in the lift shaft as per following floors to be served and complete as required as mentioned below and in the technical specifications. Power - 415 V, 3 Phase, 50 Hz, AC Speed - 1.00 MPS Machine - Gearless machine with permanent magnet synchronous motor (Directly placed above hoist way) Control - Microprocessor based Variable Voltage Variable Frequency ARD System Car Enclosure - SS Cabin Hair line finish with Glass Door in cabin (2/3 height glass door) Door Operation - Power Operated Automatic (a). Floors to be served - Ground + 3 Travel - 09.1 Meters (approx.) Stops & Opening - Four ( G + 3 ) on same side
Supplying, installation, testing and commissioning of 6 Passenger (408 kg) lift (Gearless Machine room less) having speed of 1 meter per sec. serving different floors in the lift shaft as per following floors to be served and complete as required as mentioned below and in the technical specifications. Power - 415 V, 3 Phase, 50 Hz, AC Speed - 1.00 MPS Machine - Gearless machine with permanent magnet synchronous motor (Directly placed above hoist way) Control - Microprocessor based Variable Voltage Variable Frequency ARD System Car Enclosure - SS Cabin Hair line finish with Glass Door in cabin (2/3 height glass door) Door Operation - Power Operated Automatic (b). Floors to be served - Ground + 5 Travel - 16 Meters (approx.) Stops & Opening - Six ( G + 5 ) on same side
All Inclusive Comprehensive Maintenance Contract for above mentioned G+3 Elevators after completion of defect liability period of Complete ( G+3 Elevators) & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out Quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and instructions of Engineer-in-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. (a). First Year after Completion of DLP (Considered rate 5% of SITC Cost of item No. 01)
All Inclusive Comprehensive Maintenance Contract for above mentioned G+3 Elevators after completion of defect liability period of Complete ( G+3 Elevators) & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out Quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and instructions of Engineer-in-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. (b). Second Year (Considered Yearly rate 10% cumulative enhancement on 1st year AICMC cost.
All Inclusive Comprehensive Maintenance Contract for above mentioned G+3 Elevators after completion of defect liability period of Complete ( G+3 Elevators) & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out Quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and instructions of Engineer-in-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. (c). Third Year (Considered Yearly rate 10% cumulative enhancement on 2nd year ALCMC cost.
All Inclusive Comprehensive Maintenance Contract for above mentioned G+3 Elevators after completion of defect liability period of Complete ( G+3 Elevators) & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out Quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and instructions of Engineer-in-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. (d). Fourth Year (Considered Yearly rate 10% cumulative enhancement on 3rd year ALCMC cost.
All Inclusive Comprehensive Maintenance Contract for above mentioned G+3 Elevators after completion of defect liability period of Complete ( G+3 Elevators) & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out Quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and instructions of Engineer-in-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. (e). Fifth Year (Considered Yearly rate 10% cumulative enhancement on 4th year ALCMC cost.
All Inclusive Comprehensive Maintenance Contract for above mentioned G+5 Elevators lift after completion of defect liability period of Complete ( G+5 Elevators) & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out Quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and instructions of Engineer-in-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. (a). First Year after Completion of DLP (Considered rate 5% of SITC Cost of item No. 02)
All Inclusive Comprehensive Maintenance Contract for above mentioned G+5 Elevators lift after completion of defect liability period of Complete ( G+5 Elevators) & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out Quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and instructions of Engineer-in-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. (b). Second Year (Considered Yearly rate 10% cumulative enhancement on 1st year ALCMC cost.
All Inclusive Comprehensive Maintenance Contract for above mentioned G+5 Elevators lift after completion of defect liability period of Complete ( G+5 Elevators) & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out Quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and instructions of Engineer-in-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. (c). Third Year (Considered Yearly rate 10% cumulative enhancement on 2nd year ALCMC cost.
All Inclusive Comprehensive Maintenance Contract for above mentioned G+5 Elevators lift after completion of defect liability period of Complete ( G+5 Elevators) & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out Quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and instructions of Engineer-in-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. (d). Fourth Year (Considered Yearly rate 10% cumulative enhancement on 3rd year ALCMC cost.
All Inclusive Comprehensive Maintenance Contract for above mentioned G+5 Elevators lift after completion of defect liability period of Complete ( G+5 Elevators) & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out Quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and instructions of Engineer-in-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. (e). Fifth Year (Considered Yearly rate 10% cumulative enhancement on 4th year ALCMC cost.
OMEGA ELEVATORS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .