Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.5 LAccepted-AOC VPO DUMERKHA KALAN TEH NARWANA 126116 | DUMERKHA KALAN | JIND | HARYANA | 126116 | 1 | Accepted-AOC AOC | |
| 2 | 2₹21.0 L+₹5.5 L (35.6%)Rejected-Finance N A | 2 | Rejected-Finance 2 | |
| 3 | 3₹22.1 L+₹6.5 L (42.2%)Rejected-Finance DARBA KALAN WARD NO 9 GIGORANI DISTT SIRSA C O SIRSA ROAD NATHUSARI CHOPTA WARD NO 9 GIGORANI DISTT SIRSA C O SIRSA ROAD NATHUSARI CHOPTA 125110 | SIRSA | HARYANA | 125110 | 3 | Rejected-Finance 3 |
| Sl No | Description | Qty | Unit | THE ROHINI COOP L&C SOCIETY LTD. L2 | The Darba Kalan Shila Coop L/C Society Ltd. L3 | The V.K. Co-Operative Labour & Construction Society Limited L1 |
|---|---|---|---|---|---|---|
| 2.00Providing and fixing of Low height park lights at sector-45 Parks under limit of Municipal Corporation Gurugram. | ||||||
| 3.00 | Restoring the road cut, in level with the existing road surface, including preparation of subgrade laying and relaying of soiling and laying and consolidation of wearing coats to water bound macadam specification and laying 20mm thick premix carpet, on top including cost of tack and sealcoat complete in all respects... | 20 | Sqm | 350 ₹7,000 | 370 ₹7,400 | 40 ₹800 Lowest |
| 4.00 | Providing trench less cuttting by Hydraulic Drilling Device boring/ Manual OR through some suitable alternate method with insertion of HDPE Pipe including supply, Delivery of HDPE pipe at work site and laying of 50mm internal diameter HDPE pipe inside road for road corssing of cable by Hydraulic Drilling Device without opening of the road top surface, laid at a depth of at least 900mm below the road surface from the feeding point to the feeder pillar box in median (OR) from feeder pillar to respective street light pole including cost of all accessories for road crossing for laying of cables.. | 100 | Metre | 415 ₹41,500 | 435 ₹43,500 | 50 ₹5,000 Lowest |
| 5.00 | Casting, Laying and covering of Gap Base plate (Pole) between foundation suitable c.c. mixture and pole marking with yellow reflector stricker with all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.. | 67 | Each | 158 ₹10,586 | 166 ₹11,122 | 100 ₹6,700 Lowest |
| 6.00 | Supply and Erection of Timer Contractor, DP, MCB mounted on Bakelite sheet and Installed in water proof CRCA Sheet 18 SWG duly painted with powder coated paint Box of Size 12``x15``x5`` duly lockable including Input and Out Put Connectors Bakelite/Porclein of 63A Rating and neccessary service cable up to 10 mtr complete with internal copper wiring and installing the same on pole/pedestal with suitable means at height desired by Engineer in charge to aviod theft upto entire satisfication of engineer incharge with following specification. Timer :-Quartz Analog 24 Hour Operation (G.E/LandT/Siemens/Indoasian/CandS) Contractor :- 3Pole 32A, 415Volt. (Schnider/LandT/Siemens/Indoasian/CandS) DPMCB :- 40A 2pole. (G.E/LandT/Siemens/Schnider/CandS).. | 7 | Each | 7,875 ₹55,125 | 8,250 ₹57,750 | 7,500 ₹52,500 Lowest |
| 7.00 | Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismantlement/erection of decorative light fitting from pole during maintenance period, 1 year free of cost complete in all respect. | 1 | Each | 1 ₹1 Lowest | 1 ₹1 Lowest | 1 ₹1 Lowest |
| 8.00 | Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismantlement/erection of decorative light fitting from pole during maintenance period, 2nd year @3% of cost complete in all respect. | 1 | Each | 53,467 ₹53,467 | 56,013 ₹56,013 | 1,000 ₹1,000 Lowest |
| 9.00 | Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismantlement/erection of decorative light fitting from pole during maintenance period, 3rd year @4% of cost complete in all respect. | 1 | Each | 71,289 ₹71,289 | 74,685 ₹74,685 | 2,000 ₹2,000 Lowest |
| 10.00 | Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismantlement/erection of decorative light fitting from pole during maintenance period, 4th year @5% of cost complete in all respect. | 1 | Each | 89,111 ₹89,111 | 93,354 ₹93,354 | 3,000 ₹3,000 Lowest |
| 11.00 | Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismantlement/erection of decorative light fitting from pole during maintenance period, 5th year @6% of cost complete in all respect. | 1 | Each | 1,06,934 ₹1,06,934 | 1,12,026 ₹1,12,026 | 4,000 ₹4,000 Lowest |
Tender Value
₹20.0 L
EMD Value
₹40,058
Closing Date
1 Apr 2026, 12:00 pmClosed
SACHIN YADAV
Municipal Corporation Gurugram
Providing and fixing of Low height park lights at sector-45 Parks under limit of Municipal Corporation Gurugram.
2026_HRY_510574_1
202617888DF5 18EC 444D BF7D 8B15276EB8DA285ULB
Open Tender
Civil Works
Works
120 days
Gurugram
Providing and fixing of Low height park lights at sector-45 Parks under limit of Municipal Corporation Gurugram.
2 documents required · 2 mandatory
₹1,000
Yes
₹40,058
Yes
3 Apr 2026
24 Mar 2026
1 Apr 2026
24 Mar 2026
1 Apr 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2Providing and fixing of Low height park lights at sector-45 Parks under limit of Municipal Corporation Gurugram. | |||||
| 3Restoring the road cut, in level with the existing road surface, including preparation of subgrade laying and relaying of soiling and laying and consolidation of wearing coats to water bound macadam specification and laying 20mm thick premix carpet, on top including cost of tack and sealcoat complete in all respects... | |||||
| 4Providing trench less cuttting by Hydraulic Drilling Device boring/ Manual OR through some suitable alternate method with insertion of HDPE Pipe including supply, Delivery of HDPE pipe at work site and laying of 50mm internal diameter HDPE pipe inside road for road corssing of cable by Hydraulic Drilling Device without opening of the road top surface, laid at a depth of at least 900mm below the road surface from the feeding point to the feeder pillar box in median (OR) from feeder pillar to respective street light pole including cost of all accessories for road crossing for laying of cables.. | |||||
| 5Casting, Laying and covering of Gap Base plate (Pole) between foundation suitable c.c. mixture and pole marking with yellow reflector stricker with all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.. | |||||
| 6Supply and Erection of Timer Contractor, DP, MCB mounted on Bakelite sheet and Installed in water proof CRCA Sheet 18 SWG duly painted with powder coated paint Box of Size 12``x15``x5`` duly lockable including Input and Out Put Connectors Bakelite/Porclein of 63A Rating and neccessary service cable up to 10 mtr complete with internal copper wiring and installing the same on pole/pedestal with suitable means at height desired by Engineer in charge to aviod theft upto entire satisfication of engineer incharge with following specification. Timer :-Quartz Analog 24 Hour Operation (G.E/LandT/Siemens/Indoasian/CandS) Contractor :- 3Pole 32A, 415Volt. (Schnider/LandT/Siemens/Indoasian/CandS) DPMCB :- 40A 2pole. (G.E/LandT/Siemens/Schnider/CandS).. | |||||
| 7Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismantlement/erection of decorative light fitting from pole during maintenance period, 1 year free of cost complete in all respect. | |||||
| 8Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismantlement/erection of decorative light fitting from pole during maintenance period, 2nd year @3% of cost complete in all respect. | |||||
| 9Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismantlement/erection of decorative light fitting from pole during maintenance period, 3rd year @4% of cost complete in all respect. | |||||
| 10Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismantlement/erection of decorative light fitting from pole during maintenance period, 4th year @5% of cost complete in all respect. | |||||
| 11Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismantlement/erection of decorative light fitting from pole during maintenance period, 5th year @6% of cost complete in all respect. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_589372.xls
BOQ • 0.28 MB
AD0156705.pdf
Additional Documents • 1.77 MB
OT0156705.pdf
Other Document • 1.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .