Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAccepted-AOC RONGMEN BLOCK IV NEAR UMROI MILITARY STATION P O BARAPANI SHILLONG 793103 | SHILLONG | RI BHOI | MEGHALAYA | 793103 | ₹19.5 L Quoted ₹19.9 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹23.4 L+₹3.5 L (17.5%)Rejected-Finance | ₹23.4 L+₹3.5 L (17.5%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹23.6 L+₹3.7 L (18.4%)Rejected-Finance C O M KHARKARANG LUMJINGSUK BLOCK A MADANRTING SHILLONG 793021 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793021 | ₹23.6 L+₹3.7 L (18.4%) | L3 | Rejected-Finance Being L3 |
| Sl No | Description | Qty | Unit | Bhuiya Construction L3 | M S Umesh and Co L1 | M/s Richard R Khongwir L2 |
|---|---|---|---|---|---|---|
| 1.00 | AMC / Outsourcing the resources for Monitoring, Management, and Operation of water supply management system. It includes providing the manpower 01 No. company trained technician for smooth functioning of complete auto system (OEM of PLC Panels and Motorized Valves) for successful working of the system under GE(I)(AF) Shillong complete all as specified and directed.
(i). Automation Main Panel at Pump House No -1.
(ii). Automation Mimic Panel at Pump House No -1.
(iii). Automation Slave Panel at Officer Md Accn PS Tank Area - 01 No.
(iv). Automation Slave Panel at SNCO's PS Tank Area - 01 No.
(v). Automation Slave Panel at CPL PS Tank Area - 01 No.
(vi). Automation Slave Panel at Officer Mess PS Tank Area - 01 No.
(vii). Automation Slave Panel at Camp PS Tank Area - 01 No.
(viii). Automation Slave Panel at Command Bldg - 01 No.
(ix). Automation Slave Panel at 792 SU - 01 No.
(x). Automation Slave Panel at Airman Mess PS Tank - 01 No.
(xi). Automation Slave Panel at PVC Tank Officer Mess HQ EAC(U) - 01 No.
(xii). Automation Slave Panel at KV School - 01 No. | 11 | Each Month | 45,000 ₹4,95,000 | 41,000 ₹4,51,000 Lowest | 52,000 ₹5,72,000 |
| 1.01Comprehensive maintenance shall include the following: (a) Servicing and maintenance /repair and replacement of defective components /spare parts with new one of PLC based control panels including all accessories modem, antenna etc. installed at various pump houses, OHTs and Master control station. (b) Repair/maintenance by disconnecting, cleaning, greasing for wear and tear, complete servicing, refixing, lathing, installing and commissioning as directed by Engineer-in-Charge of all motorised valves, pressure transmitters, magnetic level sensors. (c) Any changes to the Programmable Logic Controller (PLC), e.g. Changes in ladder logic of programme, changes in operational timing, etc. (limited to the scope of items covered under this AMC). (d) Any changes to the SCADA software, e.g. Changes in report format, changes in operational screens, creation of soft keys etc. (limited to the scope of items covered under this AMC). (e) Attending break down maintenance and replacement of unserviceable spare parts with new ones as required at site complete all as specified and directed by Engineer-in-charge | ||||||
| 1.02Notes: - 1. All components/spare parts replaced covered under "SPARES" shall be of the same make as specified in Particular Specifications and model / cat as per the existing and shall be measured and paid seperatly under relevant items of this BOQ and fixing charges shall be deemed to be included in this item. Nothing extra shall be admissible on this account.The additional parts required for smooth and efficient operation/replacement etc for system other than the spares in the BOQ shall be replaced with new ones without any extra cost. 2. Servicing of Motorised valve, PLC based control Panels, communication Panels, Mimic Panels shall be carried out by authorized representative of M/s Universal Switch Gear Control. The technician shall submit a letter from the manufacturer as proof of his being a authorized representative of the manufacturer. The technician shall also submit a signed report on original letterhead of the manufacturer that servicing has been carried out by him. | ||||||
| 1.033. Any changes to the Programmable Logic Controller (PLC), e.g. Changes in ladder logic of programme, changes in operational timing, etc. (limited to the scope of work covered under this AMC) shall be carried out by authorized representative of M/s Universal Switch Gear Control. The programmer shall submit a letter from the manufacturer as proof of his being an authorized representative of the manufacturer. The programmer shall also submit a signed report on original letterhead of the manufacturer that servicing has been carried out by him. 4. Any changes to the SCADA software, e.g. Changes in report format, changes in operational screens, creation of soft keys etc. (limited to the scope of work covered under this AMC) shall be carried out by authorized representative of M/s Universal Switch Gear Control.. The technician shall submit a letter from the manufacturer as proof of his being a authorized representative of the manufacturer. 5. Repairs to pump sets, starters, controls, valves etc are not in the scope of work. Un-serviceabililty of the same shall be intimated to the concerned JE/ Engineer-In-Charge E/M for repairs. In such situation the breakdwon period before the pumpsets put into working condition will not be considered as default of the contractor. | ||||||
| 1.04All the notes given vide 1.02, 1.03 above shall also be read in conjunction with the following: (A) The repair and maintenance of SCADA system should be done through OEM (M/s Universal Switch Gear Control) or through the authorised service provider of the OEM. (B) Before acceptance of tender, the successful bidder shall submit a Memorandum of Understanding (MoU) from OEM in a non-judicial stamp paper of Rs 10.00 duly notorised with an undertaking stating that execution of all SCADA related items of work shall be carried out under technical support and guidance of OEM. (C) Maintenance if any, shall be operational within 24 hours from the happening. In case, the contractor shall not carried out the same within 24 hours then per day Rs/-1000 penalty upto 01 week afterwards Rs/-2000 penalty per day will be charged to the contractor. No extra cost shall be paid by the Govt to the contractor for such failure. | ||||||
| 2.00 | Supply of Single Phase Preventor with Under and Overvoltage Protection complete all as specified and directed.
Make : Recommended by OEM | 2 | Each | 1,000 ₹2,000 Lowest | 1,575 ₹3,150 | 1,000 ₹2,000 Lowest |
| 3.00 | Supply of Relay Card Single C/O, 24 V DC all as specified and directed.
Make : Recommended by OEM | 4 | Each | 4,500 ₹18,000 | 3,585 ₹14,340 Lowest | 4,500 ₹18,000 |
| 4.00 | Supply of Relay with Base 2 C/O, 240 V AC all as specified and directed.
Make : Recommended by OEM | 8 | Each | 4,500 ₹36,000 | 3,585 ₹28,680 Lowest | 4,500 ₹36,000 |
| 5.00 | Supply of Relay with Base 2 C/O, 24 V AC all as specified and directed.
Make : Recommended by OEM | 5 | Each | 4,500 ₹22,500 | 3,250 ₹16,250 Lowest | 4,500 ₹22,500 |
| 6.00 | Supply of 22 mm LED Indicator Colour Red, Yellow, Green complete all as speicifed and directed.
Make : Recommended by OEM | 8 | Each | 286 ₹2,288 | 285 ₹2,280 Lowest | 300 ₹2,400 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
20 Jul 2026, 6:00 pmClosed
GE (I) (AF) Shillong
GE (I) (AF) Shillong Elephant Falls Camp PO Nonglyer Shillong-793009
REPAIR OR REPLACEMENT AND AMC OF WATER SUPPLY AUTOMATION SYSTEM AND ALLIED WORKS AT HQ EAC (U) AF UNDER GE (I) (AF) SHILLONG
2026_MES_772509_1
8052/26/E8
Open Tender
Information Technology
Item Rate
335 days
GE (I) (AF) Shillong
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (I) (AF) Shillong
₹40,000
Yes
26 Aug 2026
16 Jun 2026
22 Jul 2026
16 Jun 2026
20 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | AMC / Outsourcing the resources for Monitoring, Management, and Operation of water supply management system. It includes providing the manpower 01 No. company trained technician for smooth functioning of complete auto system (OEM of PLC Panels and Motorized Valves) for successful working of the system under GE(I)(AF) Shillong complete all as specified and directed.
(i). Automation Main Panel at Pump House No -1.
(ii). Automation Mimic Panel at Pump House No -1.
(iii). Automation Slave Panel at Officer Md Accn PS Tank Area - 01 No.
(iv). Automation Slave Panel at SNCO's PS Tank Area - 01 No.
(v). Automation Slave Panel at CPL PS Tank Area - 01 No.
(vi). Automation Slave Panel at Officer Mess PS Tank Area - 01 No.
(vii). Automation Slave Panel at Camp PS Tank Area - 01 No.
(viii). Automation Slave Panel at Command Bldg - 01 No.
(ix). Automation Slave Panel at 792 SU - 01 No.
(x). Automation Slave Panel at Airman Mess PS Tank - 01 No.
(xi). Automation Slave Panel at PVC Tank Officer Mess HQ EAC(U) - 01 No.
(xii). Automation Slave Panel at KV School - 01 No. | 11 | Each Month | - | - |
| 1.01 | Comprehensive maintenance shall include the following:
(a) Servicing and maintenance /repair and replacement of defective components /spare parts with new one of PLC based control panels including all accessories modem, antenna etc. installed at various pump houses, OHTs and Master control station.
(b) Repair/maintenance by disconnecting, cleaning, greasing for wear and tear, complete servicing, refixing, lathing, installing and commissioning as directed by Engineer-in-Charge of all motorised valves, pressure transmitters, magnetic level sensors.
(c) Any changes to the Programmable Logic Controller (PLC), e.g. Changes in ladder logic of programme, changes in operational timing, etc. (limited to the scope of items covered under this AMC).
(d) Any changes to the SCADA software, e.g. Changes in report format, changes in operational screens, creation of soft keys etc. (limited to the scope of items covered under this AMC).
(e) Attending break down maintenance and replacement of unserviceable spare parts with new ones as required at site complete all as specified and directed by Engineer-in-charge | - | - | - | - |
| 1.03 | 3. Any changes to the Programmable Logic Controller (PLC), e.g. Changes in ladder logic of programme, changes in operational timing, etc. (limited to the scope of work covered under this AMC) shall be carried out by authorized representative of M/s Universal Switch Gear Control. The programmer shall submit a letter from the manufacturer as proof of his being an authorized representative of the manufacturer. The programmer shall also submit a signed report on original letterhead of the manufacturer that servicing has been carried out by him.
4. Any changes to the SCADA software, e.g. Changes in report format, changes in operational screens, creation of soft keys etc. (limited to the scope of work covered under this AMC) shall be carried out by authorized representative of M/s Universal Switch Gear Control.. The technician shall submit a letter from the manufacturer as proof of his being a authorized representative of the manufacturer.
5. Repairs to pump sets, starters, controls, valves etc are not in the scope of work. Un-serviceabililty of the same shall be intimated to the concerned JE/ Engineer-In-Charge E/M for repairs. In such situation the breakdwon period before the pumpsets put into working condition will not be considered as default of the contractor. | - | - | - | - |
| 1.04 | All the notes given vide 1.02, 1.03 above shall also be read in conjunction with the following:
(A) The repair and maintenance of SCADA system should be done through OEM (M/s Universal Switch Gear Control) or through the authorised service provider of the OEM.
(B) Before acceptance of tender, the successful bidder shall submit a Memorandum of Understanding (MoU) from OEM in a non-judicial stamp paper of Rs 10.00 duly notorised with an undertaking stating that execution of all SCADA related items of work shall be carried out under technical support and guidance of OEM.
(C) Maintenance if any, shall be operational within 24 hours from the happening. In case, the contractor shall not carried out the same within 24 hours then per day Rs/-1000 penalty upto 01 week afterwards Rs/-2000 penalty per day will be charged to the contractor. No extra cost shall be paid by the Govt to the contractor for such failure. | - | - | - | - |
| 2 | Supply of Single Phase Preventor with Under and Overvoltage Protection complete all as specified and directed.
Make : Recommended by OEM | 2 | Each | - | - |
| 3 | Supply of Relay Card Single C/O, 24 V DC all as specified and directed.
Make : Recommended by OEM | 4 | Each | - | - |
| 4 | Supply of Relay with Base 2 C/O, 240 V AC all as specified and directed.
Make : Recommended by OEM | 8 | Each | - | - |
| 5 | Supply of Relay with Base 2 C/O, 24 V AC all as specified and directed.
Make : Recommended by OEM | 5 | Each | - | - |
| 6 | Supply of 22 mm LED Indicator Colour Red, Yellow, Green complete all as speicifed and directed.
Make : Recommended by OEM | 8 | Each | - | - |
| 7 | Supply of 10 mm LED Indicator Colour Red, Orange, Green complete all as speicifed and directected. | 20 | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_865019.xls
BOQ • 0.31 MB
Tender8052.pdf
Tender Documents • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .