| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAccepted-AOC | ₹5.3 Cr | L1 | Accepted-AOC For being L1 |
| 2 | L2₹5.5 Cr+₹21.8 L (4.10%)Rejected-Finance | ₹5.5 Cr+₹21.8 L (4.10%) | L2 | Rejected-Finance for not being L1 |
| 3 | L3₹5.6 Cr+₹24.2 L (4.55%)Rejected-Finance | ₹5.6 Cr+₹24.2 L (4.55%) | L3 | Rejected-Finance for not being L1 |
| 4 | L4₹6.0 Cr+₹67.9 L (12.8%)Rejected-Finance AT PO BARALOTA BY PASS ROAD DALTONGANJ DISTT PALAMU JHARKHAND 822121 | GARHWA | JHARKHAND | 822121 | ₹6.0 Cr+₹67.9 L (12.8%) | L4 | Rejected-Finance for not being L1 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not as per NIT provisions |
Tender Value
₹6.6 Cr
EMD Value
₹8.2 L
Closing Date
13 May 2024, 5:00 pmClosed
GM(HoD)/Civil
Darbhanga House, Ranchi
Construction of coal transport road from Birsa workshop to Bharat Bharati School via electronic weigh bridge under North Urimari project, Barka Sayal area, CCL.
2024_CCL_306980_1
CCL/GM(C)/Tender/2024-25/54(H)
Open Tender
Civil Works - Roads
Item Rate
180 days
Barka-sayal Area
refer NIT
5 documents required · 5 mandatory
₹8.2 L
19 Oct 2024
24 Apr 2024
15 May 2024
24 Apr 2024
13 May 2024
25 Apr 2024
24 Apr 2024 - 6 May 2024
Amount
Part A (PQC Road)
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres (Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (including Royalty @ Rs. 24.00 per cum but excluding watering, rolling & compaction).
Embankment Construction with approved materials deposited at site (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2).
Granular Sub-base with Coarse Graded Material (Table:- 400-2)By Mix in Place Method (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)for grading- I Material
Granular Sub-base with Coarse Graded Material (Table:- 400-2)By Mix in Place Method (Construction of granular sub-base by providing corase graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)for grading- 4 of table VI-I IRC 58 2015 Material
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
Cement Concrete Pavement: Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Construction of Subgrade and Earthen Shoulders (Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2). Rolling with vibratory roller
Part C ( RCC Drain)
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres (Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (including Royalty @ Rs. 24.00 per cum but excluding watering, rolling & compaction).
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications: RCC Grade M20, With Batching Plant, Transit Mixer and Concrete Pump
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Total impact of GST for the purpose of CTC
jaimaaashtabhuji constraction
prakash construction company
M/S VIKASH KUMAR TIWARI
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .