Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance | -39.10% | ₹3.4 L | L1 | Admitted-Finance |
| 2 | L2₹3.4 LAdmitted-Finance | -38.91% | ₹3.4 L | L2 | Admitted-Finance |
| 3 | L3₹4.0 LAdmitted-Finance | -28.60% | ₹4.0 L | L3 | Admitted-Finance |
Tender Value
₹5.7 L
EMD Value
₹11,300
Closing Date
7 Jan 2026, 6:55 pmClosed
Executive Engineer
Executive Engineer RCC Lower Division Hiranagar
Renovation Upgradation of Main Ravi Canal from RD 54450 to 54590M
2025_IFC_299313_1
e-NIT No. 09 of 2025-26
Open Tender
Civil Works - Canal
30 days
Hiranagar
As per NIT
2 documents required · 2 mandatory
₹600
Executive Engineer RCC Lower Division Hiranagar
₹11,300
Executive Engineer RCC Lower Division Hiranagar
13 Jan 2026
1 Jan 2026
8 Jan 2026
1 Jan 2026
7 Jan 2026
1 Jan 2026
1 Jan 2026 - 5 Jan 2026
5 Jan 2026
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Dry
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil :
Extra for two additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil :
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix)
Providing and laying in-situ concrete lining using M-10 nominal mix concrete (max. size of aggregates: 20mm nominal). In side slopes, - at a height over 3.5 m but upto 5.5m above bed
Providing and laying in-situ concrete lining using M-10 nominal mix concrete (max. size of aggregates: 20mm nominal). In beds
Extra over towards allowance for scaffolding
Curing canal lining for 28 days. In beds
Curing canal lining for 28 days. In side slopes
Disposal of Silt/Dismantled Material av. 2 Km by MT
Carriage of Materials from Source to site of work a) Carriage of Sand and Stone Agg. (20MM Nominal Size) av. 8 Kms by Mechincal Transport
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_971040.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid