Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | -20.99% | ₹2.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | -20.99% | ₹2.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | -20.99% | ₹2.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹2.0 L+₹351.73 (0.18%)Admitted-Fee/PreQual/Technical/Finance | -20.85% | ₹2.0 L+₹351.73 (0.18%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L3₹2.1 L+₹9,772.88 (4.92%)Admitted-Fee/PreQual/Technical/Finance | -17.10% | ₹2.1 L+₹9,772.88 (4.92%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹7,530
Closing Date
7 Sept 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
CONSTRUCTION OF DRAIN WARD NO 1,WARD NO2,WARD NO3 AT MAIN ROAD DOONI MOHALLA GULZAR AH MIR TO HAJI ABDUL AZIZ SOFI
2026_RDPR_322814_35
NIT NO 104 OF 2026-27 FRESH ADF GEN
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹7,530
12 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
31 Aug 2026 - 31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | .Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in
charge: | 4.3 | cum | 1,725 | ₹7,419.55 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 40.75 | cum | 479.3 | ₹19,532.43 |
| 3 | Supplying, filling, spreading and leveling stone soling of size range 5 cm to 10 cm all complete as per direction of Engineer-in-charge. | 11.45 | cum | 900 | ₹10,302.62 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | cum | 5,733.5 | - |
| 5 | 12mm plaster in 1:6 mix | - | sm | 266 | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 94.8 | sqm | 286.9 | ₹27,199.4 |
| 7 | .disposal of materials at an avg lead of 2km | 45.05 | cum | 184 | ₹8,289.79 |
| 8 | sand/aggregates at an avg lead of 25 km | 36.88 | cum | 465 | ₹17,150.9 |
| 9 | Provision for signboard and photograph | - | no | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_1084439.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .