| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-3₹5.5 LAccepted-AOC R O VILL GARH P O BARRAM TEHSIL JAISINGHPUR DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 175013 | ₹5.5 L Quoted ₹5.9 L | L-3 | Accepted-AOC ok |
| 2 | L-2₹5.6 LRejected-Finance R O VILLAGE POST OFFICE RAISARY TEHSIL DISTRICT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹5.6 L | L-2 | Rejected-Finance Not L-1 |
| 3 | L-4₹6.3 LRejected-Finance | ₹6.3 L | L-4 | Rejected-Finance Not L-1 |
| 4 | L-5₹6.8 LRejected-Finance LUDHIANA | ₹6.8 L | L-5 | Rejected-Finance Not L-1 |
| 5 | L-6₹7.0 LRejected-Finance | ₹7.0 L | L-6 | Rejected-Finance Not L-1 |
Tender Value
₹8.0 L
EMD Value
₹16,100
Closing Date
2 Feb 2022, 5:00 pmClosed
Executive Engineer, Una Division, HPPWD, Una
Executive Engineer, Una Division, HPPWD, Una
Job 11 Construction of Boundary wall at GSSS Jakhera Tehsil and Distt. Una Sub Head Balance work of Boundary wall Length 124 mtr. Deposit Work
2022_PWD_56071_1
Job 11 Construction of Boundary wall at GSSS Jakhe
Open Tender
Civil Works - Buildings
Item Rate
30 days
Una
Please refer to Bidding Documents
14 documents required · 14 mandatory
₹500
₹16,100
6 May 2023
28 Jan 2022
3 Feb 2022
28 Jan 2022
2 Feb 2022
28 Jan 2022
Amount
Earth work in excavation by mechanical means( hydrolic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. All kind of soil including carriage of material within all leads and lifts and other incidentials. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing form work with steel plates 3.15mm(three decimal fifteen millimeter) thick welded with angle iron in frame of 30x30x5 mm (thirty into thirty into five millimeter) size so as to give a fair finish including centering shuttering strutting and propping etcetera with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling and removal of same for in-situ reinforced concrete and plain concrete work in vertical surfaces such as walls(any thickness) partitions and the like including attached pilasters buttresses,plinth and string courses and the like including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government.
Providing and laying cement concrete 1:4:8 (one cement: four sand:eight graded crushed stone aggregate 40mm( forty millimeter nominal size) mechanically mixed and curing complete excluding cost of form work in foundation and plinth in all heights / depths including enitre carriage of material within all leads and lifts and other incidentials and as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government.
Brick work using second class common burnt clay building bricks in foundation and plinth in cement mortar 1:6(one cement: six sand ) including curing complete in any depth/height including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government.
Providing and laying damp proof course 38mm (thirty eight millimeter)thick with cement concrete 1:2:4 (One cement:two sand:four graded crushed stone aggregate 12.5mm (twelve point five millimeter )nominal size) and curing complete including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax ,GST,labour cess or other taxes imposed by the Government.
Applying a coat of hot bitumen (mexphalt 80/100(eighty/hundred) or equivalent using 1.70 kg. (one point seventy kilogramme)per square meter on damp proof course after cleaning the surface with a piece of cloth lightly soaked with kerosene oil including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government.
Brick work using second class common burnt clay building bricks in superstructure above plinth level upto all floor level /height in cement mortar 1:6(one cement: six sand ) including curing complete including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax GST,labour cess or other taxes imposed by the Government.
Providing and laying reinforcement cement concrete work of grade M-25(M-twenty )design mix to obtain the minimum crushing strength of 25 N/mm2 (twenty five Newton per millimeter square ) with minimum cement content of 400 kg (four hundred kilogramme ) per cubic meter mixed and vibrated mechanically, and curing complete to give a smooth and even surface including centering and shuttering etcetrera but excluding cost of reinforcement in string course bands coping bed plates, anchor blocks plain window sills and the like Up to all heights in all floor level complete including entire carriage of material within all leads and lifts and other incidentials and as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government.
15mm (fifteen millimetre)cement plaster in single coat on rough side of brick/concrete/stone walls for interior plastering in all floor level including arrises, internal rounded angles, chamfers and/or rounded angles not exceeding 80mm(eighty millimetre) in girth and finished even and smooth in cement mortar 1:6 ( one cement : six sand) including curing complete including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. .
12 mm (tweleve millimetre) cement plaster of mix 1:6 (one cement: six fine sand) in single coat on the fair side of brick/ concrete/stone walls for interior plastering upto floor two level including arrises,internal rounded angles,chamfers and/or rounded angles not exceeding 80mm in girth and finished even and smooth including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government.
Finishing walls with with water proofing cement paint of shade (Neolac/Assian/Dulux/Berger)having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives New work (Two or more coats applied @ 3.84 kg./ 10 sqm. . including entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. .
unique engg. solutions
Ashwani Kumar
VIGHNESH ENTERPRISES
balwinder singh govt contractor
MANI GOVT. CONTRACTOR
MOHIT BEDI
RAJESH JASWAL
Harjeet Singh Govt. Contractor
VIKAS SHARMA
jasvinder singh
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .