Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | +6.01% | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 CrAdmitted-Finance | +8.50% | ₹1.9 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.9 CrAdmitted-Finance | +9.00% | ₹1.9 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.9 CrAdmitted-Finance | +10.00% | ₹1.9 Cr | L4 | Admitted-Finance |
| 5 | L5₹1.9 CrAdmitted-Finance | +11.00% | ₹1.9 Cr | L5 | Admitted-Finance |
Updated dates
Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
19 Jun 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer PWD Dn Sujangarh
Constt ofAtal Path From From Govt School Baniya bas to Main Road SH 20A Village Gopalpura
2026_CEPWD_568493_1
E NIT No 02/2026-27 Sujangarh
Open Tender
Civil Works
120 days
Sujangarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Executive Engineer PWD Dn/MDRISL
₹3.5 L
Yes
22 Jun 2026
16 Jun 2026
22 Jun 2026
16 Jun 2026
19 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | PART - A EARTH WORK | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Mechanical Means In area of thorny jungle | 0.1 | Hect | 12,746 | ₹1,274.6 | BI01010001010000000000000515BI0100001113 |
| 3 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Manual Means In area of thorny jungle | 0.16 | Hect | 34,162 | ₹5,465.92 | BI01010001010000000000000515BI0100001114 |
| 4 | Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202.Dry Brick Pitching or Brick Soling | 395.25 | Cum | 94 | ₹37,153.5 | BI01010001010000000000000515BI0100001115 |
| 5 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 618.75 | Cum | 20 | ₹12,375 | BI01010001010000000000000515BI0100001116 |
| 6 | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 | 5,220 | Cum | 28 | ₹1,46,160 | BI01010001010000000000000515BI0100001117 |
| 7 | Haulage of materials by tipper excluding cost of loading, unloading and stacking.Case-II: Unsurfaced Gravel Road for 3.0 km | 22,776.19 | P.T km | 3.7 | ₹84,271.9 | BI01010001010000000000000515BI0100001118 |
| 8 | PART - B GRANULAR & WBM/WMM BASES WORK | - | - | - | - | BI01010001010000000000000515BI0100001119 |
| 9 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density,
complete as per MoRTH Specification Clause 401.For Churu For Grading III Material | 1,497.61 | P.cum | 639 | ₹9,56,972.79 | BI01010001010000000000000515BI0100001120 |
| 10 | PART - C CC PAVEMENT WORK | - | - | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_1011322.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid