Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | ₹1.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 LRejected-AOC | ₹1.6 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | NETHAJI L1 | P PICHANDI L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 24.68 | cum | 118.7 ₹2,929.52 | 200 ₹4,936 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc complete. | 4.11 | cum | 4,930.22 ₹20,263.20 | 5,478.02 ₹22,514.66 |
| 3.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 81.6 | sqm | 492.75 ₹40,208.40 | 547.5 ₹44,676 |
| 4.00 | Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 9.38 | cum | 5,609.38 ₹52,615.98 | 6,232.64 ₹58,462.16 |
| 5.00 | Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc | 15.3 | cum | 522.11 ₹7,988.28 | 580.12 ₹8,875.84 |
| 6.00 | GST 18% | 1 | No | 22,320.97 ₹22,320.97 | 25,103.64 ₹25,103.64 |
Tender Value
Refer Docs
EMD Value
₹1,651
Closing Date
6 Mar 2026, 3:00 pmClosed
The Block development officer, Arcot
The Block development office, Arcot
Construction of Drainage at Mettu Street in Ladavaram H/O Ladavaram Panchayat
2026_RDTN_669366_1
A4/3447/2024
Open Tender
Civil Works
30 days
The Block development office, Arcot
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,651
12 Mar 2026
3 Mar 2026
6 Mar 2026
3 Mar 2026
6 Mar 2026
3 Mar 2026
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_804290.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_804290.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid