Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹40.5 LAdmitted-Finance | -19.01% | ₹40.5 L | L1 | Admitted-Finance |
| 2 | L2₹50 L+₹9.5 L (23.5%)Admitted-Finance | +0.00% | ₹50 L+₹9.5 L (23.5%) | L2 | Admitted-Finance |
| 3 | L3₹52 L+₹11.5 L (28.4%)Admitted-Finance NEAR BUS STAND UNCHAHAR RAEBARELI UP NEAR BUS STAND UNCHAHAR RAEBARELI UP NEAR BUS STAND UNCHAHAR RAEBARELI UP NEAR BUS STAND UNCHAHAR RAEBARELI UP | +4.00% | ₹52 L+₹11.5 L (28.4%) | L3 | Admitted-Finance |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
24 Jun 2026, 6:00 pmClosed
Executive Engineer PHED District Rural Dn 1 Udaip
Executive Engineer PHED District Rural Dn 1 Udaipur
Rate contract for the construction of new open wells or deepening of existing open wells in jurisdiction of District Rural Division I Udaipur
2026_PHCJA_563612_9
08-16/2026-27
Open Tender
Civil Works
Percentage
365 days
Udaipur
NIT_16_2026_27
6 documents required · 6 mandatory
₹2,000
Executive Engineer PHED District Rural Dn 1 Udaip
₹1 L
Yes
2 Jul 2026
1 Jun 2026
25 Jun 2026
1 Jun 2026
24 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation over areas (exceeding 30cm depth, 1.5 mtr in width and 10 SQM in plan) for construction of open well, lift up to 1.5 Mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter. | - | - | - | - |
| 2 | All kind of soil | - | Pcum | - | - |
| 3 | Ordinary Rock | - | Pcum | - | - |
| 4 | Hard Rock (Requiring blasting) | - | Pcum | - | - |
| 5 | Hard Rock (Blasting Prohibited) | - | Pcum | 1 | - |
| 6 | Add extra over item No. 2.39.1 for every additional lift of 1.5 Mtr. or part thereof : In all kind of soils. | - | Pcum | 1 | - |
| 7 | Add extra over item No. 2.39.2-4 for every additional lift of 1.5 Mtr. or part thereof : In Ordinary rock and hard rock. | - | Pcum | - | - |
| 8 | Add 20% extra over item No. 2.39 for excavation in saturated soil where pumping or baling out of water is required, including shoring strutting where required and dewatering. | - | Percentage | 0.2 | - |
| 9 | Labour charges for horizontal boring 100 mm dia in open well in rocky strata with all types of rock cutting & drilling tools etc. including all T&P required for job including dewatering arrangement. | - | per mtr | 1 | - |
| 10 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to plinth level.
Thermo mechanically treated bars (conforming to relevant IS code.) | - | Pkg | 65.25 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
tender.pdf
Tender Documents • 2.68 MB
BOQ_1003156.xls
BOQ • 0.31 MB
img024.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .