| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC LER |
| 2 | L2₹1.3 Cr+₹3,846.54 (0.03%)Rejected-Finance | ₹1.3 Cr+₹3,846.54 (0.03%) | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | Ramajayam L2 | SAI SURYAA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Part I : Improvement of Vayaloor - Mottur road (Eri) Km 0/0 - 1/555 R223. | |||||
| 1.01Clearing and scrub/ light jungle by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300mm girth | |||||
| 1.02 | KM 0/0 - 1/0 | 1,800 | Sq.m | 5.94 ₹10,692 Lowest | 5.94 ₹10,692 Lowest |
| 1.03 | KM 1/0 - 1/555 | 693 | Sq.m | 5.94 ₹4,116.42 Lowest | 5.94 ₹4,116.42 Lowest |
| 1.04Picking the existing black top/ WBM surface to 50 MM depth including labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification. | |||||
| 1.05 | KM 0/0 - 1/0 | 1,228.12 | Sq.m | 21.84 ₹26,822.14 Lowest | 21.84 ₹26,822.14 Lowest |
| 1.06 | KM 1/0 - 1/555 | 481.25 | Sq.m | 21.84 ₹10,510.5 Lowest | 21.84 ₹10,510.5 Lowest |
| 1.07collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. | |||||
| 1.08 | KM 0/0 - 1/0 | 1,165.71 | Cum | 134.82 ₹1,57,161.02 Lowest | 134.82 ₹1,57,161.02 Lowest |
| 1.09 | KM 1/0 - 1/555 | 465.09 | Cum | 134.82 ₹62,703.43 Lowest | 134.82 ₹62,703.43 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
22 Jan 2025, 3:00 pmClosed
The Project Director, DRDA, Tiiruvannamalai
DRDA, Tiruvannamalai
Improvement of Vayaloor - Mottur road (Eri) Km 0/0 - 1/555 R223 in Vayaloor Panchayat of Pernamallur Block Package No.TVM/2024-25/102 under NABARD RIDF XXX 2024-25
2024_RDTN_514915_1
No.8870/2024/A11 Dt.18.12.2024 102
Open Tender
Civil Works - Roads
Item Wise
180 days
Pernamallur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.3 L
11 Sept 2026
28 Dec 2024
22 Jan 2025
28 Dec 2024
22 Jan 2025
28 Dec 2024
Amount
Part I : Improvement of Vayaloor - Mottur road (Eri) Km 0/0 - 1/555 R223.
Clearing and scrub/ light jungle by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300mm girth
Picking the existing black top/ WBM surface to 50 MM depth including labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification.
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Provision for Road Marking
Provision for Road Marker/Road Stud with lens Reflector
Provision for 60cm equilator triangular Cautionary sign Board
Providing KM stone (1.65*0.45*0.15)
Providing HM stone (0.75*0.23*0.10)
Provision for Citizen Information Board cum Name Board
Provision for CC Pavement @ Ch: 1/250 - 1/420
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmental Officers etc.Complete.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Provision for Tar Pad
Provision for CD Works 2.00m RCC Slab Culvert @ Ch: 0/103, 0/316 & 0/450
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4: 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmental Officers etc.Complete.
Upto Ground Level
Above Ground Level
Cement concrete 1:3:6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Below Sill Level
Above Sill Level
Cement concrete 1:2:4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm 155 HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick, and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. (MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and laying Kraft paper barring between deck sláb and bed block to the full width of seating.
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Provision for CD Works 3.00m RCC Slab Culvert @ Ch: 0/420
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4: 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmental Officers etc.Complete.
Upto Ground Level
Above Ground Level
Cement concrete 1:3:6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Below Sill Level
Above Sill Level
Cement concrete 1:2:4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm 155 HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick, and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. (MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and laying Kraft paper barring between deck sláb and bed block to the full width of seating.
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Provision for Retaining Wall @ Ch: 0/885 - 0/905 (RHS), 0/910 - 0/930 (RHS)
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Ch: 0/885 - 0/905 (RHS)
Ch: 0/910 - 0/930 (RHS)
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Ch: 0/885 - 0/905 (RHS)
Ch: 0/910 - 0/930 (RHS)
Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including wherever and laid in layers of not more than 15cm thick., compacting etc., Ccomplete with standard specifications and as directed.
Ch: 0/885 - 0/905 (RHS)
Ch: 0/910 - 0/930 (RHS)
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Below Ground Level Footing
Ch: 0/885 - 0/905 (RHS)
Ch: 0/910 - 0/930 (RHS)
Body Wall
Ch: 0/885 - 0/905 (RHS)
Ch: 0/910 - 0/930 (RHS)
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmental Officers etc.Complete.
Upto Ground Level
Ch: 0/885 - 0/905 (RHS)
Ch: 0/910 - 0/930 (RHS)
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Ch: 0/885 - 0/905 (RHS)
Ch: 0/910 - 0/930 (RHS)
Provision for Dismantling the existing CD structures @ Ch: 0/103, 0/316, 0/420 & 0/450
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.
Dismantling of existing structures like culverts, bridges, tetaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material. disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202., Reinforced Cement Concrete
Five Years of Maintenace
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Ramajayam (BID ID -1229856)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .