Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC | L1 | Accepted-AOC stand as L1 bidder | |
| 2 | L2₹6.9 L+₹21,870 (3.25%)Rejected-Finance | L2 | Rejected-Finance does not stand as L1 bidder | |
| 3 | L3₹7.1 L+₹37,460 (5.57%)Rejected-Finance | L3 | Rejected-Finance does not stand as L1 bidder |
Tender Value
₹6.5 L
EMD Value
₹13,000
Closing Date
16 Nov 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE O and MC-III BTPS Obra
Office of SE O and MC-III BTPS Obra
Breakdown Preventive maintenance, Overhauling, commissioning and Shifting of damaged/repaired/new E.S.P transformers and daily Routine Monitoring of HVR ESP Transformer and cleaning of E.S.P top floor area in 5x200MW Units,BTPS, Obra
2020_RVUNL_521940_1
T-14/SE-III/BTPS/EMD-II/20-21
Open Tender
Electrical Works
Fixed-rate
365 days
obra
As per PQC
3 documents required · 3 mandatory
₹1,180
Dy CAO, CFA andBO, BTPS, Obra
₹13,000
17 Feb 2021
17 Oct 2020
18 Nov 2020
17 Oct 2020
16 Nov 2020
17 Oct 2020
17 Oct 2020 - 14 Nov 2020
120 days
Shifting of repaired / damaged / new ESP transformer from place of storage near electrical workshop area to ESP ground floor or from ESP ground floor to Electrical workshop (approx 600mts).
Lowering down the ESP transformer from ESP top ( 35 mtr) to ground floor of ESP area .
Lifting the transformer from ESP ground floor up to the ESP Top floor (35 mtr) and placing it at the required place / platform
Dismantling and removal of damaged/faulty transformer connected to ESP field along with negative link rod its bushing, bushing chamber and associated works.
Replacement and commissioning of New/repaired ESP transformer along with negative link rod, its bushing, bushing chamber and associated works and connecting it to field.
Preventive maintenance, up keeping and cleaning of ESP transformer support insulators, isolator insulators, negative bushing and their chambers.{1 Trans, 4 nos. support insulators, 3 nos. isolator insulator, 2 nos. negative bushing and respective chambers of 1 ESP field = 1 Job.
Up keeping and cleaning of E.S.P top floor area.
Over hauling of ESP transformer and fault finding.
Daily Routine monitoring of HVR ESP Transformer & Associated Equipments at ESP Top of 5x200MW, BTPS.
M/S ARVIND ERECTORS
M/s Neha Conditioning & Refrizration Services
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .